Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2018-06-12 — TX
Operator
Centurion Pipeline L.p.
Cause
Excavation Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$19,993
Incident datetime
2018-06-12 10:17
Report number
Location
TX
Narrative
On tuesday, june 12, 2018, at approximately 10:17, a boring machine operated by k & b directional, inc., a sub-contractor working for watkins construction llc at the behest of energy transfer partners, struck the centurion pipeline, l.P. (cpl) braden to midkiff 8'' pipeline near midkiff, texas, resulting in the loss of containment of approximately 130 barrels of crude oil. The crude oil filled the boring excavation where 110 barrels were recovered by vacuum trucks, and the remaining 20 barrels were recovered by soil remediation. Cpl repaired the pipeline and returned it to service at 02:36 on june 15, 2018. No injuries or fatalities were associated with this accident, and soil remediation is complete. Upon company personnel arriving onsite at 10:40 on june 12, 2018, it was determined that an excess of 5 barrels of crude oil was released. It was not determined to be cpl's pipeline until excavation was sufficiently completed at 13:02 to ascertain that among the flow lines and unmarked pipelines in the immediate vicinity it was cpl's line that was struck. Pursuant to this confirmation the national response center (nrc) was called at 13:25. The nrc report number 1215060 corresponds to the initial telephonic report for this accident, and nrc report number 1215261 corresponds to the 48 hour update report. Texas railroad commission job number 134998 corresponds to this accident. Cpl correctly marked the 8'' pipeline in accordance with one call procedures. However, prior to the boring activity, the contractor incorrectly identified a 3'' steel flow line as the braden to midkiff 8'' pipeline during pot-holing. The contractor attempted to bore under the misidentified pipeline and struck the marked braden to midkiff pipeline in the 3 o' clock position at a depth of 7'10'' resulting in the aforementioned release. Supplemental final report filed on august 1, 2018: in response to PHMSA's suggested changes, cpl updated a4 from 10:40 am to 10:17 am to reflect the earliest known time that a reporting criteria may have been met. Cpl updated a7 from 13:25 to 13:48 to correspond with the correct time of the call to the nrc. Cpl also changed a9 from 130 barrels to 890 barrels to include the volume of crude oil drained from the braden to midkiff pipeline prior to repairs being made. Phmsa requested the costs in d8 be validated. Upon further review, cpl updated the costs to include the invoices received since the original report filing. Overall, the total costs to the operator increased from $55,320 to $61,610. Phmsa also requested the pressure at the point and time of the accident, reported in e1, to be validated, given that the line pressures are only measured at braden station and midkiff station, and that there are no flow at the time of the accident., cpl estimated the head pressure at the point and time of the accident and updated e1 from 31 psig to 2.42 psig. Upon further review of the length of the segment isolated as result of the third party line strike, cpl updated e5c from 36,876 feet to 46,992 feet to account for the entire length of the braden to midkiff 8'' pipeline. Cpl updated e9 to include the results of the control room evaluation, which confirmed that no control room or controller issues were identified.
Detailed record list
Report Received Date
2018-07-12 00:00:00
Iyear
2018
Report Number
20180199
Supplemental Number
30735
Report Type
Supplemental Final
Operator Id
31888
Name
Centurion Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2018-06-12 10:17:00
Location Latitude
31.69896
Location Longitude
-101.89204
Commodity Released Type
Crude Oil
Unintentional Release Bbls
890
Recovered Bbls
890
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
Incident Identified Datetime
2018-06-12 10:17:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-06-12 10:27:00
Restart Datetime
2018-06-15 02:36:00
On Site Datetime
2018-06-12 10:40:00
Nrc Rpt Datetime
2018-06-12 13:48:00
Nrc Rpt Num
1215060
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Braden To Midkiff Junction
Segment Name
Braden 8''
Onshore State Abbreviation
Tx
Onshore Postal Code
79706
Onshore City Name
Not Within A Municipality
Onshore County Name
Midland County
Designated Location
Milepost/valve Station
Designated Name
Mp5.87
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
94
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Pipe Wall Thickness
0.25
Pipe Smys
42000
Pipe Specification
Api 5l X42
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
1998
Manufactured Year
1998
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
5
Puncture Circum
6
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1320
Est Cost Prop Damage
19993
Est Cost Emergency
4568
Est Cost Environmental
35729
Est Cost Other
0
Prpty
61610
Accident Psig
2.42
Mop Psig
850
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
46992
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Gathering
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Easement
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Boring
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
1865897341
One Call Center Name
Texas 811
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
64
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
J***** M* M********
Preparer Title
Project Engineer
Preparer Email
J***************@o**.com
Preparer Telephone
713-552-8915
Prepared Date
2018-08-01 00:00:00
Authorizer Name
D**** M****
Authorizer Telephone
713-366-5130
Authorizer Title
Pipeline Compliance Regulatory Consultant
Authorizer Email
D**********@o**.com
Narrative
On tuesday, june 12, 2018, at approximately 10:17, a boring machine operated by k & b directional, inc., a sub-contractor working for watkins construction llc at the behest of energy transfer partners, struck the centurion pipeline, l.P. (cpl) braden to midkiff 8'' pipeline near midkiff, texas, resulting in the loss of containment of approximately 130 barrels of crude oil. The crude oil filled the boring excavation where 110 barrels were recovered by vacuum trucks, and the remaining 20 barrels were recovered by soil remediation. Cpl repaired the pipeline and returned it to service at 02:36 on june 15, 2018. No injuries or fatalities were associated with this accident, and soil remediation is complete. Upon company personnel arriving onsite at 10:40 on june 12, 2018, it was determined that an excess of 5 barrels of crude oil was released. It was not determined to be cpl's pipeline until excavation was sufficiently completed at 13:02 to ascertain that among the flow lines and unmarked pipelines in the immediate vicinity it was cpl's line that was struck. Pursuant to this confirmation the national response center (nrc) was called at 13:25. The nrc report number 1215060 corresponds to the initial telephonic report for this accident, and nrc report number 1215261 corresponds to the 48 hour update report. Texas railroad commission job number 134998 corresponds to this accident. Cpl correctly marked the 8'' pipeline in accordance with one call procedures. However, prior to the boring activity, the contractor incorrectly identified a 3'' steel flow line as the braden to midkiff 8'' pipeline during pot-holing. The contractor attempted to bore under the misidentified pipeline and struck the marked braden to midkiff pipeline in the 3 o' clock position at a depth of 7'10'' resulting in the aforementioned release. Supplemental final report filed on august 1, 2018: in response to PHMSA's suggested changes, cpl updated a4 from 10:40 am to 10:17 am to reflect the earliest known time that a reporting criteria may have been met. Cpl updated a7 from 13:25 to 13:48 to correspond with the correct time of the call to the nrc. Cpl also changed a9 from 130 barrels to 890 barrels to include the volume of crude oil drained from the braden to midkiff pipeline prior to repairs being made. Phmsa requested the costs in d8 be validated. Upon further review, cpl updated the costs to include the invoices received since the original report filing. Overall, the total costs to the operator increased from $55,320 to $61,610. Phmsa also requested the pressure at the point and time of the accident, reported in e1, to be validated, given that the line pressures are only measured at braden station and midkiff station, and that there are no flow at the time of the accident., cpl estimated the head pressure at the point and time of the accident and updated e1 from 31 psig to 2.42 psig. Upon further review of the length of the segment isolated as result of the third party line strike, cpl updated e5c from 36,876 feet to 46,992 feet to account for the entire length of the braden to midkiff 8'' pipeline. Cpl updated e9 to include the results of the control room evaluation, which confirmed that no control room or controller issues were identified.
| Report Received Date | 2018-07-12 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180199 |
| Supplemental Number | 30735 |
| Report Type | Supplemental Final |
| Operator Id | 31888 PHMSA Enforcement |
| Name | Centurion Pipeline L.p. |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2018-06-12 10:17:00 |
| Location Latitude | 31.69896 Google Maps OpenStreetMap |
| Location Longitude | -101.89204 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 890 |
| Recovered Bbls | 890 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Third Party That Caused The Accident |
| Incident Identified Datetime | 2018-06-12 10:17:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-06-12 10:27:00 |
| Restart Datetime | 2018-06-15 02:36:00 |
| On Site Datetime | 2018-06-12 10:40:00 |
| Nrc Rpt Datetime | 2018-06-12 13:48:00 |
| Nrc Rpt Num | 1215060 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Braden To Midkiff Junction |
| Segment Name | Braden 8'' |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79706 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Midland County |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp5.87 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 94 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8 |
| Pipe Wall Thickness | 0.25 |
| Pipe Smys | 42000 |
| Pipe Specification | Api 5l X42 |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Installation Year | 1998 |
| Manufactured Year | 1998 |
| Material Involved | Carbon Steel |
| Release Type | Mechanical Puncture |
| Puncture Axial | 5 |
| Puncture Circum | 6 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1320 |
| Est Cost Prop Damage | 19993 |
| Est Cost Emergency | 4568 |
| Est Cost Environmental | 35729 |
| Est Cost Other | 0 |
| Prpty | 61610 |
| Accident Psig | 2.42 |
| Mop Psig | 850 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 46992 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Gathering |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | Yes |
| Private Row Ind | Yes |
| Private Subtype | Private Easement |
| Pipeline Easement Row Ind | Yes |
| Excavator Type | Contractor |
| Excavator Equipment | Boring |
| Work Performed | Liquid Pipeline |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 1865897341 |
| One Call Center Name | Texas 811 |
| Locator Type | Utility Owner |
| Visible Marks | Yes |
| Service Interruption | Yes |
| Service Interruption Hours | 64 |
| Root Cause Category | Excavation Issue |
| Root Cause Type | Excavator Failed To Maintain Clearance After Verifying Marks |
| Preparer Name | J***** M* M******** |
| Preparer Title | Project Engineer |
| Preparer Email | J***************@o**.com |
| Preparer Telephone | 713-552-8915 |
| Prepared Date | 2018-08-01 00:00:00 |
| Authorizer Name | D**** M**** |
| Authorizer Telephone | 713-366-5130 |
| Authorizer Title | Pipeline Compliance Regulatory Consultant |
| Authorizer Email | D**********@o**.com |
| Narrative | On tuesday, june 12, 2018, at approximately 10:17, a boring machine operated by k & b directional, inc., a sub-contractor working for watkins construction llc at the behest of energy transfer partners, struck the centurion pipeline, l.P. (cpl) braden to midkiff 8'' pipeline near midkiff, texas, resulting in the loss of containment of approximately 130 barrels of crude oil. The crude oil filled the boring excavation where 110 barrels were recovered by vacuum trucks, and the remaining 20 barrels were recovered by soil remediation. Cpl repaired the pipeline and returned it to service at 02:36 on june 15, 2018. No injuries or fatalities were associated with this accident, and soil remediation is complete. Upon company personnel arriving onsite at 10:40 on june 12, 2018, it was determined that an excess of 5 barrels of crude oil was released. It was not determined to be cpl's pipeline until excavation was sufficiently completed at 13:02 to ascertain that among the flow lines and unmarked pipelines in the immediate vicinity it was cpl's line that was struck. Pursuant to this confirmation the national response center (nrc) was called at 13:25. The nrc report number 1215060 corresponds to the initial telephonic report for this accident, and nrc report number 1215261 corresponds to the 48 hour update report. Texas railroad commission job number 134998 corresponds to this accident. Cpl correctly marked the 8'' pipeline in accordance with one call procedures. However, prior to the boring activity, the contractor incorrectly identified a 3'' steel flow line as the braden to midkiff 8'' pipeline during pot-holing. The contractor attempted to bore under the misidentified pipeline and struck the marked braden to midkiff pipeline in the 3 o' clock position at a depth of 7'10'' resulting in the aforementioned release. Supplemental final report filed on august 1, 2018: in response to PHMSA's suggested changes, cpl updated a4 from 10:40 am to 10:17 am to reflect the earliest known time that a reporting criteria may have been met. Cpl updated a7 from 13:25 to 13:48 to correspond with the correct time of the call to the nrc. Cpl also changed a9 from 130 barrels to 890 barrels to include the volume of crude oil drained from the braden to midkiff pipeline prior to repairs being made. Phmsa requested the costs in d8 be validated. Upon further review, cpl updated the costs to include the invoices received since the original report filing. Overall, the total costs to the operator increased from $55,320 to $61,610. Phmsa also requested the pressure at the point and time of the accident, reported in e1, to be validated, given that the line pressures are only measured at braden station and midkiff station, and that there are no flow at the time of the accident., cpl estimated the head pressure at the point and time of the accident and updated e1 from 31 psig to 2.42 psig. Upon further review of the length of the segment isolated as result of the third party line strike, cpl updated e5c from 36,876 feet to 46,992 feet to account for the entire length of the braden to midkiff 8'' pipeline. Cpl updated e9 to include the results of the control room evaluation, which confirmed that no control room or controller issues were identified. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company