HL incident on 2018-04-23 — KS
Operator
Flint Hills Resources, Lc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$90,000
Incident datetime
2018-04-23 08:00
Report number
Location
KS
Narrative
On 4-23-18 at 08:00, operations personnel were attempting to complete an ldar repair on the block valve auxiliary blow down fitting on the body of the p/l 503 trap bypass valve. The ball check valve inside the fitting failed to seal/seat, resulting in a release of ethylene. The surrounding area was isolated and air monitoring initiated. Based on air monitoring two houses were evacuated. 911 was called and nrc was notified at approximately 08:55. The texas railroad commission pipeline safety division was also notified. The pipeline segment was isolated and water spray initiated on the release to keep emissions down. A flare was set up on the downstream valve site to reduce pressure and emissions on the line segment. Once pressure was reduced, repair personnel closed the valve and replaced the auxiliary blow down fitting with a valve and plug. The pipeline segment was restarted the next day at 10:30.
Detailed record list
Report Received Date
2018-05-23 00:00:00
Iyear
2018
Report Number
20180142
Supplemental Number
30381
Report Type
Original Final
Operator Id
22855
Name
Flint Hills Resources, Lc
Operator Street Address
4111 East 37th Street North
Operator City Name
Wichita
Operator State Abbreviation
KS
Operator Postal Code
67220
Local Datetime
2018-04-23 08:00:00
Location Latitude
30.154927
Location Longitude
-94.423409
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Ethylene
Unintentional Release Bbls
72
Intentional Release Bbls
18
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2018-04-23 08:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2018-04-23 08:15:00
Restart Datetime
2018-04-24 10:30:00
On Site Datetime
2018-04-23 08:00:00
Nrc Rpt Datetime
2018-04-23 08:55:00
Nrc Rpt Num
1210037
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
2
Pipe Fac Name
Pipeline 503
Segment Name
Segment Id 80150300
Onshore State Abbreviation
Tx
Onshore Postal Code
77659
Onshore City Name
Sour Lake
Onshore County Name
Hardin
Designated Location
Milepost/valve Station
Designated Name
00+00
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Gate
Valve Manufacturer
Wkm
Installation Year
1982
Manufactured Year
1982
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Leak Was From A Block Valve Auxiliary Blow Down Fitting On Bottom Of Body Of Valve
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
129875
Est Cost Prop Damage
90000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
1278
Est Cost Other Details
Hotel Costs 447.76, Food And Other 830.47
Prpty
221153
Accident Psig
1520
Mop Psig
2160
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
80454
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
The Block Valve Auxiliary Blow Down Fitting On Bottom Of Valve Has A Ball Check Inside That Was Found To Be Clogged With Grease And Debris Fouling The Seat Of The Ball Check
Eq Additional Other Ind
Yes
Eq Additional Other Details
Clogged Block Valve Auxiliary Blow Down Fitting On Body Of Valve
Preparer Name
M**** T*****
Preparer Title
Senior Compliance Specialist
Preparer Email
M***********@f**.com
Preparer Telephone
409-273-9482
Prepared Date
2018-05-23 00:00:00
Authorizer Name
M**** T*****
Authorizer Telephone
409-273-9482
Authorizer Title
Senior Compliance Specialist
Authorizer Email
M***********@f**.com
Narrative
On 4-23-18 at 08:00, operations personnel were attempting to complete an ldar repair on the block valve auxiliary blow down fitting on the body of the p/l 503 trap bypass valve. The ball check valve inside the fitting failed to seal/seat, resulting in a release of ethylene. The surrounding area was isolated and air monitoring initiated. Based on air monitoring two houses were evacuated. 911 was called and nrc was notified at approximately 08:55. The texas railroad commission pipeline safety division was also notified. The pipeline segment was isolated and water spray initiated on the release to keep emissions down. A flare was set up on the downstream valve site to reduce pressure and emissions on the line segment. Once pressure was reduced, repair personnel closed the valve and replaced the auxiliary blow down fitting with a valve and plug. The pipeline segment was restarted the next day at 10:30.
| Report Received Date | 2018-05-23 00:00:00 |
|---|---|
| Iyear | 2018 |
| Report Number | 20180142 |
| Supplemental Number | 30381 |
| Report Type | Original Final |
| Operator Id | 22855 PHMSA Enforcement |
| Name | Flint Hills Resources, Lc |
| Operator Street Address | 4111 East 37th Street North |
| Operator City Name | Wichita |
| Operator State Abbreviation | KS |
| Operator Postal Code | 67220 |
| Local Datetime | 2018-04-23 08:00:00 |
| Location Latitude | 30.154927 Google Maps OpenStreetMap |
| Location Longitude | -94.423409 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Other Hvl |
| Commodity Details | Ethylene |
| Unintentional Release Bbls | 72 |
| Intentional Release Bbls | 18 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2018-04-23 08:00:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2018-04-23 08:15:00 |
| Restart Datetime | 2018-04-24 10:30:00 |
| On Site Datetime | 2018-04-23 08:00:00 |
| Nrc Rpt Datetime | 2018-04-23 08:55:00 |
| Nrc Rpt Num | 1210037 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 2 |
| Pipe Fac Name | Pipeline 503 |
| Segment Name | Segment Id 80150300 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77659 |
| Onshore City Name | Sour Lake |
| Onshore County Name | Hardin |
| Designated Location | Milepost/valve Station |
| Designated Name | 00+00 |
| Federal | No |
| Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Gate |
| Valve Manufacturer | Wkm |
| Installation Year | 1982 |
| Manufactured Year | 1982 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Leak Was From A Block Valve Auxiliary Blow Down Fitting On Bottom Of Body Of Valve |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 129875 |
| Est Cost Prop Damage | 90000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 1278 |
| Est Cost Other Details | Hotel Costs 447.76, Food And Other 830.47 |
| Prpty | 221153 |
| Accident Psig | 1520 |
| Mop Psig | 2160 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 80454 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 1 |
| Num Employees Failed | 0 |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Failure Details | The Block Valve Auxiliary Blow Down Fitting On Bottom Of Valve Has A Ball Check Inside That Was Found To Be Clogged With Grease And Debris Fouling The Seat Of The Ball Check |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Clogged Block Valve Auxiliary Blow Down Fitting On Body Of Valve |
| Preparer Name | M**** T***** |
| Preparer Title | Senior Compliance Specialist |
| Preparer Email | M***********@f**.com |
| Preparer Telephone | 409-273-9482 |
| Prepared Date | 2018-05-23 00:00:00 |
| Authorizer Name | M**** T***** |
| Authorizer Telephone | 409-273-9482 |
| Authorizer Title | Senior Compliance Specialist |
| Authorizer Email | M***********@f**.com |
| Narrative | On 4-23-18 at 08:00, operations personnel were attempting to complete an ldar repair on the block valve auxiliary blow down fitting on the body of the p/l 503 trap bypass valve. The ball check valve inside the fitting failed to seal/seat, resulting in a release of ethylene. The surrounding area was isolated and air monitoring initiated. Based on air monitoring two houses were evacuated. 911 was called and nrc was notified at approximately 08:55. The texas railroad commission pipeline safety division was also notified. The pipeline segment was isolated and water spray initiated on the release to keep emissions down. A flare was set up on the downstream valve site to reduce pressure and emissions on the line segment. Once pressure was reduced, repair personnel closed the valve and replaced the auxiliary blow down fitting with a valve and plug. The pipeline segment was restarted the next day at 10:30. |