GD incident on 2018-10-25 — NC
Operator
Piedmont Natural Gas Co Inc
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$221,312
Incident datetime
2018-10-25 13:30
Report number
Location
NC, MECKLENBURG
Narrative
Contractor for state DOT project was using auger equipment to excavate pylons for concrete sound barriers beside the interstate interchange in charlotte, nc near the intersection of I-77 and I-85 near lasalle street. The contractor did not have an active 811 locate ticket for this work and subsequently damaged the existing 14" cased pipeline that crosses underneath the I-77 interchange. The initial telephonic report to the national response center was made on 10/26/2018 when it was determined this incident would exceed the $50,000 reporting threshold.
Detailed record list
Occurred At
2018-10-25 13:30:00
Year
2018
Report Received Date
2018-11-19 00:00:00
Iyear
2018.0
Report Number
20180104.0
Supplemental Number
31637.0
Report Type
Supplemental Final
Operator Id
15518
Name
Piedmont Natural Gas Co Inc
Operator Street Address
525 South Tryon Street
Operator City Name
Charlotte
Operator State Abbreviation
NC
Operator Postal Code
28202
Local Datetime
2018-10-25 13:25:00
Location Street Address
Lasalle Street Exit Off I-77
Location City Name
Charlotte
Location County Name
Mecklenburg
Location State Abbreviation
NC
Location Postal Code
28216
Location Latitude
35.261048
Location Longitude
-80.841056
Nrc Rpt Datetime
2018-10-26 10:30:00
Nrc Rpt Num
1228583
Commodity Released Type
Natural Gas
Unintentional Release
182.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2018-10-25 13:30:00
On Site Datetime
2018-10-25 14:05:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Pipe Diameter
14.0
Pipe Specification
X42 0.250 Wall
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Wt Steel
0.25
Release Type
Mechanical Puncture
Puncture Axial
5.0
Puncture Circum
0.25
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
221312.0
Est Cost Emergency
8633.0
Est Cost Other
0.0
Est Cost Other Details
0
Est Cost Unintentional Release
4062.0
Prpty
234007.0
Commercial Affected
2.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
148.0
Normal Psig
148.0
Mop Psig
150.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The damage was done by a third-party
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Ex Hydrotest Leak Survey Date
2018-03-07 00:00:00
Ex Hydrotest Conducted Ind
No
Prior Notification Ind
No
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
Interstate Highway
Excavator Type
Contractor
Excavator Equipment
Auger
Work Performed
Building Construction
One Call Notified Ind
No
Service Interruption
Yes
Service Interruption Hours
46.0
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
C********** R******
Preparer Title
Pipeline Safety And Compliance Analyst
Preparer Email
C******************@d**********.com
Preparer Telephone
704-731-4680
Authorizer Name
F***** B****
Authorizer Title
Pipeline Safety Manager
Authorizer Telephone
704-731-4618
Authorizer Email
F***********@d**********.com
Narrative
Contractor for state DOT project was using auger equipment to excavate pylons for concrete sound barriers beside the interstate interchange in charlotte, nc near the intersection of I-77 and I-85 near lasalle street. The contractor did not have an active 811 locate ticket for this work and subsequently damaged the existing 14" cased pipeline that crosses underneath the I-77 interchange. The initial telephonic report to the national response center was made on 10/26/2018 when it was determined this incident would exceed the $50,000 reporting threshold.
| Occurred At | 2018-10-25 13:30:00 |
|---|---|
| Year | 2018 |
| Report Received Date | 2018-11-19 00:00:00 |
| Iyear | 2018.0 |
| Report Number | 20180104.0 |
| Supplemental Number | 31637.0 |
| Report Type | Supplemental Final |
| Operator Id | 15518 PHMSA Enforcement |
| Name | Piedmont Natural Gas Co Inc |
| Operator Street Address | 525 South Tryon Street |
| Operator City Name | Charlotte |
| Operator State Abbreviation | NC |
| Operator Postal Code | 28202 |
| Local Datetime | 2018-10-25 13:25:00 |
| Location Street Address | Lasalle Street Exit Off I-77 |
| Location City Name | Charlotte |
| Location County Name | Mecklenburg |
| Location State Abbreviation | NC |
| Location Postal Code | 28216 |
| Location Latitude | 35.261048 Google Maps OpenStreetMap |
| Location Longitude | -80.841056 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2018-10-26 10:30:00 |
| Nrc Rpt Num | 1228583 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 182.2 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2018-10-25 13:30:00 |
| On Site Datetime | 2018-10-25 14:05:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Crossing | No |
| Pipe Facility Type | Investor Owned |
| System Part Involved | Main |
| Pipe Diameter | 14.0 |
| Pipe Specification | X42 0.250 Wall |
| Pipe Manufacturer | Unknown |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Unknown |
| Wt Steel | 0.25 |
| Release Type | Mechanical Puncture |
| Puncture Axial | 5.0 |
| Puncture Circum | 0.25 |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 221312.0 |
| Est Cost Emergency | 8633.0 |
| Est Cost Other | 0.0 |
| Est Cost Other Details | 0 |
| Est Cost Unintentional Release | 4062.0 |
| Prpty | 234007.0 |
| Commercial Affected | 2.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 148.0 |
| Normal Psig | 148.0 |
| Mop Psig | 150.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Notification From Third Party That Caused The Incident |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The damage was done by a third-party |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Ex Hydrotest Leak Survey Date | 2018-03-07 00:00:00 |
| Ex Hydrotest Conducted Ind | No |
| Prior Notification Ind | No |
| Notify Cga Dirt | No |
| Public Row Ind | Yes |
| Public Subtype | Interstate Highway |
| Excavator Type | Contractor |
| Excavator Equipment | Auger |
| Work Performed | Building Construction |
| One Call Notified Ind | No |
| Service Interruption | Yes |
| Service Interruption Hours | 46.0 |
| Root Cause Category | Notification Issue |
| Root Cause Type | No Notification Made To The One-Call Center/811 |
| Preparer Name | C********** R****** |
| Preparer Title | Pipeline Safety And Compliance Analyst |
| Preparer Email | C******************@d**********.com |
| Preparer Telephone | 704-731-4680 |
| Authorizer Name | F***** B**** |
| Authorizer Title | Pipeline Safety Manager |
| Authorizer Telephone | 704-731-4618 |
| Authorizer Email | F***********@d**********.com |
| Narrative | Contractor for state DOT project was using auger equipment to excavate pylons for concrete sound barriers beside the interstate interchange in charlotte, nc near the intersection of I-77 and I-85 near lasalle street. The contractor did not have an active 811 locate ticket for this work and subsequently damaged the existing 14" cased pipeline that crosses underneath the I-77 interchange. The initial telephonic report to the national response center was made on 10/26/2018 when it was determined this incident would exceed the $50,000 reporting threshold. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA