GD incident on 2018-10-25 — NC

Operator
Piedmont Natural Gas Co Inc
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$221,312
Incident datetime
2018-10-25 13:30
Report number
Location
NC, MECKLENBURG
Narrative
Contractor for state DOT project was using auger equipment to excavate pylons for concrete sound barriers beside the interstate interchange in charlotte, nc near the intersection of I-77 and I-85 near lasalle street. The contractor did not have an active 811 locate ticket for this work and subsequently damaged the existing 14" cased pipeline that crosses underneath the I-77 interchange. The initial telephonic report to the national response center was made on 10/26/2018 when it was determined this incident would exceed the $50,000 reporting threshold.
Detailed record list
Occurred At
2018-10-25 13:30:00
Year
2018
Report Received Date
2018-11-19 00:00:00
Iyear
2018.0
Report Number
20180104.0
Supplemental Number
31637.0
Report Type
Supplemental Final
Operator Id
Name
Piedmont Natural Gas Co Inc
Operator Street Address
525 South Tryon Street
Operator City Name
Charlotte
Operator State Abbreviation
NC
Operator Postal Code
28202
Local Datetime
2018-10-25 13:25:00
Location Street Address
Lasalle Street Exit Off I-77
Location City Name
Charlotte
Location County Name
Mecklenburg
Location State Abbreviation
NC
Location Postal Code
28216
Location Latitude
Location Longitude
Nrc Rpt Datetime
2018-10-26 10:30:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
182.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2018-10-25 13:30:00
On Site Datetime
2018-10-25 14:05:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Pipe Diameter
14.0
Pipe Specification
X42 0.250 Wall
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Wt Steel
0.25
Release Type
Mechanical Puncture
Puncture Axial
5.0
Puncture Circum
0.25
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
221312.0
Est Cost Emergency
8633.0
Est Cost Other
0.0
Est Cost Other Details
0
Est Cost Unintentional Release
4062.0
Prpty
234007.0
Commercial Affected
2.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
148.0
Normal Psig
148.0
Mop Psig
150.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The damage was done by a third-party
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Ex Hydrotest Leak Survey Date
2018-03-07 00:00:00
Ex Hydrotest Conducted Ind
No
Prior Notification Ind
No
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
Interstate Highway
Excavator Type
Contractor
Excavator Equipment
Auger
Work Performed
Building Construction
One Call Notified Ind
No
Service Interruption
Yes
Service Interruption Hours
46.0
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
C********** R******
Preparer Title
Pipeline Safety And Compliance Analyst
Preparer Email
C******************@d**********.com
Preparer Telephone
704-731-4680
Authorizer Name
F***** B****
Authorizer Title
Pipeline Safety Manager
Authorizer Telephone
704-731-4618
Authorizer Email
F***********@d**********.com
Narrative
Contractor for state DOT project was using auger equipment to excavate pylons for concrete sound barriers beside the interstate interchange in charlotte, nc near the intersection of I-77 and I-85 near lasalle street. The contractor did not have an active 811 locate ticket for this work and subsequently damaged the existing 14" cased pipeline that crosses underneath the I-77 interchange. The initial telephonic report to the national response center was made on 10/26/2018 when it was determined this incident would exceed the $50,000 reporting threshold.
Occurred At 2018-10-25 13:30:00
Year 2018
Report Received Date 2018-11-19 00:00:00
Iyear 2018.0
Report Number 20180104.0
Supplemental Number 31637.0
Report Type Supplemental Final
Operator Id 15518 PHMSA Enforcement
Name Piedmont Natural Gas Co Inc
Operator Street Address 525 South Tryon Street
Operator City Name Charlotte
Operator State Abbreviation NC
Operator Postal Code 28202
Local Datetime 2018-10-25 13:25:00
Location Street Address Lasalle Street Exit Off I-77
Location City Name Charlotte
Location County Name Mecklenburg
Location State Abbreviation NC
Location Postal Code 28216
Location Latitude 35.261048 Google Maps OpenStreetMap
Location Longitude -80.841056 Google Maps OpenStreetMap
Nrc Rpt Datetime 2018-10-26 10:30:00
Nrc Rpt Num 1228583 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 182.2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2018-10-25 13:30:00
On Site Datetime 2018-10-25 14:05:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Crossing No
Pipe Facility Type Investor Owned
System Part Involved Main
Pipe Diameter 14.0
Pipe Specification X42 0.250 Wall
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Wt Steel 0.25
Release Type Mechanical Puncture
Puncture Axial 5.0
Puncture Circum 0.25
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 221312.0
Est Cost Emergency 8633.0
Est Cost Other 0.0
Est Cost Other Details 0
Est Cost Unintentional Release 4062.0
Prpty 234007.0
Commercial Affected 2.0
Industrial Affected 0.0
Residences Affected 0.0
Accident Psig 148.0
Normal Psig 148.0
Mop Psig 150.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The damage was done by a third-party
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Ex Hydrotest Leak Survey Date 2018-03-07 00:00:00
Ex Hydrotest Conducted Ind No
Prior Notification Ind No
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype Interstate Highway
Excavator Type Contractor
Excavator Equipment Auger
Work Performed Building Construction
One Call Notified Ind No
Service Interruption Yes
Service Interruption Hours 46.0
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name C********** R******
Preparer Title Pipeline Safety And Compliance Analyst
Preparer Email C******************@d**********.com
Preparer Telephone 704-731-4680
Authorizer Name F***** B****
Authorizer Title Pipeline Safety Manager
Authorizer Telephone 704-731-4618
Authorizer Email F***********@d**********.com
Narrative Contractor for state DOT project was using auger equipment to excavate pylons for concrete sound barriers beside the interstate interchange in charlotte, nc near the intersection of I-77 and I-85 near lasalle street. The contractor did not have an active 811 locate ticket for this work and subsequently damaged the existing 14" cased pipeline that crosses underneath the I-77 interchange. The initial telephonic report to the national response center was made on 10/26/2018 when it was determined this incident would exceed the $50,000 reporting threshold.