GD incident on 2018-07-19 — NM

Operator
New Mexico Gas Company
Cause
Incorrect Operation
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$31,843
Incident datetime
2018-07-19 11:45
Report number
Location
NM, CIBOLA
Narrative
On july 19, 2018, at 11:45 nmgc crews were called out to a 3rd party damage at the intersection of los alamitos heights road and lobo canyon rd. A 4" steel gas main was punctured by bore machine stabilizer. While making repairs an ignition occurred under bore machine that engulfed the machine and was a total loss approximate cost of contractor bore machine is $280,299 and $31,843.00 in operators property damage and repair costs. Cost of total loss of bore machine caused reportable incident. Investigation is complete, however, cause of ignition is unknown.
Detailed record list
Occurred At
2018-07-19 11:45:00
Year
2018
Report Received Date
2018-08-20 00:00:00
Iyear
2018.0
Report Number
20180075.0
Supplemental Number
31230.0
Report Type
Supplemental Final
Operator Id
Name
New Mexico Gas Company
Operator Street Address
7120 Wyoming Blvd N.e. Suite 20
Operator City Name
Albuquerque
Operator State Abbreviation
NM
Operator Postal Code
87109
Local Datetime
2018-07-19 15:58:00
Location Street Address
Intersection Of Los Alamitos Heights Rd & Lobo Canyon Rd
Location City Name
Grants
Location County Name
Cibola
Location State Abbreviation
NM
Location Postal Code
87020
Location Latitude
Location Longitude
Nrc Rpt Datetime
2018-07-19 18:16:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
138.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
Yes
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2018-07-19 11:45:00
On Site Datetime
2018-07-19 11:59:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Transition Area
Incident Area Subtype
Soil/air Interface
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1978.0
Pipe Diameter
4.0
Pipe Specification
Api 5l
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Mechanical Puncture
Puncture Axial
2.0
Puncture Circum
1.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
280299.0
Est Cost Prop Damage
31843.0
Est Cost Emergency
500.0
Est Cost Other
0.0
Est Cost Other Details
Total Loss Of Bore Machine
Est Cost Unintentional Release
264.0
Prpty
312906.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
96.0
Accident Psig
49.0
Normal Psig
49.0
Mop Psig
50.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
Yes
Num Employees Tested
4
Num Employees Failed
0
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Other Incorrect Operation
Operation Type
Other Incorrect Operation
Operation Details
Crews Were Making Repairs To 4" Steel Line After Contractors Bore Machine Stabilizer. While Making Repairs An Ignition Occurred Under Bore Machine That Engulfed The Machine Resulting In Total Loss. Cause Of Ignition Is Unknown.
Related Other Ind
Yes
Operation Related Details
Crews Were Making Repairs To 4" Steel Line After Contractors Bore Machine Stabilizer. While Making Repairs An Ignition Occurred Under Bore Machine That Engulfed The Machine Resulting In Total Loss. Cause Of Ignition Is Unknown.
Category Type
Non-Routine Operating Conditions (Abnormal Operations Or Emergencies)
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
A***** M*******
Preparer Title
Pipeline Safety Management Systems Manager
Preparer Email
A**************@n****.com
Preparer Telephone
505-697-3518
Authorizer Name
T** B******
Authorizer Title
Vp Eng-Gas Mgmt-Tech Services
Authorizer Telephone
505-697-3599
Authorizer Email
T**********@n****.com
Narrative
On july 19, 2018, at 11:45 nmgc crews were called out to a 3rd party damage at the intersection of los alamitos heights road and lobo canyon rd. A 4" steel gas main was punctured by bore machine stabilizer. While making repairs an ignition occurred under bore machine that engulfed the machine and was a total loss approximate cost of contractor bore machine is $280,299 and $31,843.00 in operators property damage and repair costs. Cost of total loss of bore machine caused reportable incident. Investigation is complete, however, cause of ignition is unknown.
Occurred At 2018-07-19 11:45:00
Year 2018
Report Received Date 2018-08-20 00:00:00
Iyear 2018.0
Report Number 20180075.0
Supplemental Number 31230.0
Report Type Supplemental Final
Operator Id 6141 PHMSA Enforcement
Name New Mexico Gas Company
Operator Street Address 7120 Wyoming Blvd N.e. Suite 20
Operator City Name Albuquerque
Operator State Abbreviation NM
Operator Postal Code 87109
Local Datetime 2018-07-19 15:58:00
Location Street Address Intersection Of Los Alamitos Heights Rd & Lobo Canyon Rd
Location City Name Grants
Location County Name Cibola
Location State Abbreviation NM
Location Postal Code 87020
Location Latitude 35.17504 Google Maps OpenStreetMap
Location Longitude -107.815644 Google Maps OpenStreetMap
Nrc Rpt Datetime 2018-07-19 18:16:00
Nrc Rpt Num 1218911 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 138.5
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind Yes
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2018-07-19 11:45:00
On Site Datetime 2018-07-19 11:59:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Transition Area
Incident Area Subtype Soil/air Interface
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 1978.0
Pipe Diameter 4.0
Pipe Specification Api 5l
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Release Type Mechanical Puncture
Puncture Axial 2.0
Puncture Circum 1.0
Class Location Type Class 3 Location
Est Cost Oper Paid 280299.0
Est Cost Prop Damage 31843.0
Est Cost Emergency 500.0
Est Cost Other 0.0
Est Cost Other Details Total Loss Of Bore Machine
Est Cost Unintentional Release 264.0
Prpty 312906.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 96.0
Accident Psig 49.0
Normal Psig 49.0
Mop Psig 50.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind Yes
Num Employees Tested 4
Num Employees Failed 0
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Other Incorrect Operation
Operation Type Other Incorrect Operation
Operation Details Crews Were Making Repairs To 4" Steel Line After Contractors Bore Machine Stabilizer. While Making Repairs An Ignition Occurred Under Bore Machine That Engulfed The Machine Resulting In Total Loss. Cause Of Ignition Is Unknown.
Related Other Ind Yes
Operation Related Details Crews Were Making Repairs To 4" Steel Line After Contractors Bore Machine Stabilizer. While Making Repairs An Ignition Occurred Under Bore Machine That Engulfed The Machine Resulting In Total Loss. Cause Of Ignition Is Unknown.
Category Type Non-Routine Operating Conditions (Abnormal Operations Or Emergencies)
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name A***** M*******
Preparer Title Pipeline Safety Management Systems Manager
Preparer Email A**************@n****.com
Preparer Telephone 505-697-3518
Authorizer Name T** B******
Authorizer Title Vp Eng-Gas Mgmt-Tech Services
Authorizer Telephone 505-697-3599
Authorizer Email T**********@n****.com
Narrative On july 19, 2018, at 11:45 nmgc crews were called out to a 3rd party damage at the intersection of los alamitos heights road and lobo canyon rd. A 4" steel gas main was punctured by bore machine stabilizer. While making repairs an ignition occurred under bore machine that engulfed the machine and was a total loss approximate cost of contractor bore machine is $280,299 and $31,843.00 in operators property damage and repair costs. Cost of total loss of bore machine caused reportable incident. Investigation is complete, however, cause of ignition is unknown.