GD incident on 2018-04-10 — CA

Operator
Southern California Gas Co
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$221,696
Incident datetime
2018-04-10 12:11
Report number
Location
CA, LOS ANGELES
Narrative
On april 10, 2018, a third-party contractor struck a 6-inch gas steel distribution line while performing trenching for a new sewer line. This resulted in an escape of gas. Crew responded and was able to control the gas through closing a valve. There were no injuries that resulted from this incident. Investigation showed that prior to the incident, the third-party contractor had a USA ticket and the line was properly marked by the utility owner. At the time of the incident, the third-party contractor did have a valid USA ticket for the excavation activities performed. In addition, the third-party contractor failed to pot hole the facilities by hand. This incident was reported to DOT and cpuc due to estimated damage amount exceeding $50,000. On 05/23/2018, changed the notification time (part a) to the nrc from 1330 to 1030. For any further questions, contact bryon walsh-(619) 992-1473. Final report box checked
Detailed record list
Occurred At
2018-04-10 12:11:00
Year
2018
Report Received Date
2018-05-10 00:00:00
Iyear
2018.0
Report Number
20180052.0
Supplemental Number
31422.0
Report Type
Supplemental Final
Operator Id
Name
Southern California Gas Co
Operator Street Address
555 West Fifth Street
Operator City Name
Los Angeles
Operator State Abbreviation
CA
Operator Postal Code
90013
Local Datetime
2018-04-10 12:11:00
Location Street Address
Intersection Of Topanga Cyn Blvd & Poema Pl
Location City Name
Chatsworth
Location County Name
Los Angeles
Location State Abbreviation
CA
Location Postal Code
90290
Location Latitude
Location Longitude
Nrc Rpt Datetime
2018-04-12 10:30:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
193.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2018-04-10 12:11:00
On Site Datetime
2018-04-10 12:31:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
40.0
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Uncased
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
1987.0
Pipe Diameter
6.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Wt Steel
0.188
Release Type
Mechanical Puncture
Puncture Axial
4.0
Puncture Circum
1.0
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
221696.0
Est Cost Emergency
200.0
Est Cost Other
0.0
Est Cost Unintentional Release
1158.0
Prpty
223054.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
429.0
Accident Psig
40.0
Normal Psig
40.0
Mop Psig
45.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
County Road
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Sewer (Sanitary/storm)
One Call Notified Ind
Yes
One Call Ticket Num
18086013
One Call Center Name
Digalert
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
26.0
Root Cause Category
Excavation Issue
Root Cause Type
Improper Excavation Practice Not Listed Above
Preparer Name
B**** W****
Preparer Title
Pipeline Safety And Compliance Advisor
Preparer Email
B*****@s**************.com
Preparer Telephone
619-992-1473
Authorizer Name
B**** W****
Authorizer Title
Pipeline Safety And Compliance Advisor
Authorizer Telephone
619-992-1473
Authorizer Email
B*****@s**************.com
Narrative
On april 10, 2018, a third-party contractor struck a 6-inch gas steel distribution line while performing trenching for a new sewer line. This resulted in an escape of gas. Crew responded and was able to control the gas through closing a valve. There were no injuries that resulted from this incident. Investigation showed that prior to the incident, the third-party contractor had a USA ticket and the line was properly marked by the utility owner. At the time of the incident, the third-party contractor did have a valid USA ticket for the excavation activities performed. In addition, the third-party contractor failed to pot hole the facilities by hand. This incident was reported to DOT and cpuc due to estimated damage amount exceeding $50,000. On 05/23/2018, changed the notification time (part a) to the nrc from 1330 to 1030. For any further questions, contact bryon walsh-(619) 992-1473. Final report box checked
Occurred At 2018-04-10 12:11:00
Year 2018
Report Received Date 2018-05-10 00:00:00
Iyear 2018.0
Report Number 20180052.0
Supplemental Number 31422.0
Report Type Supplemental Final
Operator Id 18484 PHMSA Enforcement
Name Southern California Gas Co
Operator Street Address 555 West Fifth Street
Operator City Name Los Angeles
Operator State Abbreviation CA
Operator Postal Code 90013
Local Datetime 2018-04-10 12:11:00
Location Street Address Intersection Of Topanga Cyn Blvd & Poema Pl
Location City Name Chatsworth
Location County Name Los Angeles
Location State Abbreviation CA
Location Postal Code 90290
Location Latitude 34.278506 Google Maps OpenStreetMap
Location Longitude -118.604442 Google Maps OpenStreetMap
Nrc Rpt Datetime 2018-04-12 10:30:00
Nrc Rpt Num 1209161 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 193.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2018-04-10 12:11:00
On Site Datetime 2018-04-10 12:31:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Pavement
Depth Of Cover 40.0
Crossing Yes
Road Crossing Ind Yes
Road Type Uncased
Pipe Facility Type Investor Owned
System Part Involved Main
Installation Year 1987.0
Pipe Diameter 6.0
Pipe Specification Unknown
Pipe Manufacturer Unknown
Material Involved Steel
Steel Seam Type Other
Steel Seam Type Details Unknown
Wt Steel 0.188
Release Type Mechanical Puncture
Puncture Axial 4.0
Puncture Circum 1.0
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 221696.0
Est Cost Emergency 200.0
Est Cost Other 0.0
Est Cost Unintentional Release 1158.0
Prpty 223054.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 429.0
Accident Psig 40.0
Normal Psig 40.0
Mop Psig 45.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Notification From Third Party That Caused The Incident
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind Yes
One Call System Ind Yes
Notify Cga Dirt No
Public Row Ind Yes
Public Subtype County Road
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Sewer (Sanitary/storm)
One Call Notified Ind Yes
One Call Ticket Num 18086013
One Call Center Name Digalert
Locator Type Utility Owner
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 26.0
Root Cause Category Excavation Issue
Root Cause Type Improper Excavation Practice Not Listed Above
Preparer Name B**** W****
Preparer Title Pipeline Safety And Compliance Advisor
Preparer Email B*****@s**************.com
Preparer Telephone 619-992-1473
Authorizer Name B**** W****
Authorizer Title Pipeline Safety And Compliance Advisor
Authorizer Telephone 619-992-1473
Authorizer Email B*****@s**************.com
Narrative On april 10, 2018, a third-party contractor struck a 6-inch gas steel distribution line while performing trenching for a new sewer line. This resulted in an escape of gas. Crew responded and was able to control the gas through closing a valve. There were no injuries that resulted from this incident. Investigation showed that prior to the incident, the third-party contractor had a USA ticket and the line was properly marked by the utility owner. At the time of the incident, the third-party contractor did have a valid USA ticket for the excavation activities performed. In addition, the third-party contractor failed to pot hole the facilities by hand. This incident was reported to DOT and cpuc due to estimated damage amount exceeding $50,000. On 05/23/2018, changed the notification time (part a) to the nrc from 1330 to 1030. For any further questions, contact bryon walsh-(619) 992-1473. Final report box checked