GD incident on 2018-03-28 — CA
Operator
Pacific Gas & Electric Co
Cause
Excavation Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$99,000
Incident datetime
2018-03-28 14:53
Report number
Location
CA, SAN MATEO
Narrative
On wednesday, march 28, 2018 at 1453 hours, pg&e was notified of a third party dig in at 56 south mcdonnell rd, in the city of south san francisco. A third party contractor, teichert construction, struck a 6' steel main with a backhoe. There was a valid USA ticket number (x805201511) and the gas line was located & day-lighted, but the excavator mistakenly believed it to be an abandoned water main and had instructed the excavation crew to remove it. While excavating to remove the gas main stub, the stub was damaged causing an unintentional release of gas. The repair crew arrived on-site at 1510 hours and stopped the flow of gas by closing the 3 valves by 1638 hours. The crew deactivated 29 feet of 6" steel main and welded on (2) 6" dead end caps. On 3/29/18, the crew installed 40' of 6" steel main and tied it back into service. Police and fire department were reported on site. Service was impacted to 1 customer. There were no injuries, no fatalities, and no ignition associated with this incident. This incident is being reported due to the unintentional release of gas and presence of channel 7 media helicopter observed at 1657 hours. On 4/17/18 at 1003 hours, pg&e determined that the estimated repair costs exceeded the >50k criteria and reported the incident to the DOT on 4/17/18 at 1016 hours (DOT report number 1209558). A 48 hour update was reported to the DOT on 4/18/18 at 0748 hours (DOT report number 1209623).
Detailed record list
Occurred At
2018-03-28 14:53:00
Year
2018
Report Received Date
2018-04-26 00:00:00
Iyear
2018.0
Report Number
20180045.0
Supplemental Number
31451.0
Report Type
Supplemental Final
Operator Id
15007
Name
Pacific Gas & Electric Co
Operator Street Address
6121 Bollinger Canyon Rd.
Operator City Name
San Ramon
Operator State Abbreviation
CA
Operator Postal Code
94583
Local Datetime
2018-03-28 14:53:00
Location Street Address
56 South Mcdonnell Rd
Location City Name
South San Francisco
Location County Name
San Mateo
Location State Abbreviation
CA
Location Postal Code
94030
Location Latitude
37.613331
Location Longitude
-122.392387
Nrc Rpt Datetime
2018-04-17 10:18:00
Nrc Rpt Num
1209558
Commodity Released Type
Natural Gas
Unintentional Release
531.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
1.0
Incident Identified Datetime
2018-03-28 14:53:00
On Site Datetime
2018-03-28 15:10:00
Federal
No
Location Type
Private Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
40.0
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
Main
Installation Year
1996.0
Pipe Diameter
6.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Mechanical Puncture
Puncture Axial
2.0
Puncture Circum
0.5
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
99000.0
Est Cost Emergency
11000.0
Est Cost Other
0.0
Est Cost Unintentional Release
1593.0
Prpty
111593.0
Commercial Affected
1.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
46.0
Normal Psig
46.0
Mop Psig
50.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No scada at this location.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Business
Excavator Type
Unknown/other
Excavator Equipment
Backhoe/trackhoe
Work Performed
Unknown/other
One Call Notified Ind
Yes
One Call Ticket Num
805201511
One Call Center Name
811
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
11.0
Root Cause Category
Excavation Issue
Root Cause Type
Improper Excavation Practice Not Listed Above
Preparer Name
E*** B******
Preparer Title
Regulatory Compliance
Preparer Email
E***@p**.com
Preparer Telephone
925-357-7889
Authorizer Name
S**** R*******
Authorizer Title
Manager Of Regulatory Compliance
Authorizer Telephone
925-786-0267
Authorizer Email
G***@p**.com
Narrative
On wednesday, march 28, 2018 at 1453 hours, pg&e was notified of a third party dig in at 56 south mcdonnell rd, in the city of south san francisco. A third party contractor, teichert construction, struck a 6' steel main with a backhoe. There was a valid USA ticket number (x805201511) and the gas line was located & day-lighted, but the excavator mistakenly believed it to be an abandoned water main and had instructed the excavation crew to remove it. While excavating to remove the gas main stub, the stub was damaged causing an unintentional release of gas. The repair crew arrived on-site at 1510 hours and stopped the flow of gas by closing the 3 valves by 1638 hours. The crew deactivated 29 feet of 6" steel main and welded on (2) 6" dead end caps. On 3/29/18, the crew installed 40' of 6" steel main and tied it back into service. Police and fire department were reported on site. Service was impacted to 1 customer. There were no injuries, no fatalities, and no ignition associated with this incident. This incident is being reported due to the unintentional release of gas and presence of channel 7 media helicopter observed at 1657 hours. On 4/17/18 at 1003 hours, pg&e determined that the estimated repair costs exceeded the >50k criteria and reported the incident to the DOT on 4/17/18 at 1016 hours (DOT report number 1209558). A 48 hour update was reported to the DOT on 4/18/18 at 0748 hours (DOT report number 1209623).
| Occurred At | 2018-03-28 14:53:00 |
|---|---|
| Year | 2018 |
| Report Received Date | 2018-04-26 00:00:00 |
| Iyear | 2018.0 |
| Report Number | 20180045.0 |
| Supplemental Number | 31451.0 |
| Report Type | Supplemental Final |
| Operator Id | 15007 PHMSA Enforcement |
| Name | Pacific Gas & Electric Co |
| Operator Street Address | 6121 Bollinger Canyon Rd. |
| Operator City Name | San Ramon |
| Operator State Abbreviation | CA |
| Operator Postal Code | 94583 |
| Local Datetime | 2018-03-28 14:53:00 |
| Location Street Address | 56 South Mcdonnell Rd |
| Location City Name | South San Francisco |
| Location County Name | San Mateo |
| Location State Abbreviation | CA |
| Location Postal Code | 94030 |
| Location Latitude | 37.613331 Google Maps OpenStreetMap |
| Location Longitude | -122.392387 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2018-04-17 10:18:00 |
| Nrc Rpt Num | 1209558 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 531.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 1.0 |
| Incident Identified Datetime | 2018-03-28 14:53:00 |
| On Site Datetime | 2018-03-28 15:10:00 |
| Federal | No |
| Location Type | Private Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 40.0 |
| Crossing | No |
| Pipe Facility Type | Investor Owned |
| System Part Involved | Main |
| Installation Year | 1996.0 |
| Pipe Diameter | 6.0 |
| Pipe Specification | Unknown |
| Pipe Manufacturer | Unknown |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Unknown |
| Release Type | Mechanical Puncture |
| Puncture Axial | 2.0 |
| Puncture Circum | 0.5 |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 99000.0 |
| Est Cost Emergency | 11000.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 1593.0 |
| Prpty | 111593.0 |
| Commercial Affected | 1.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 46.0 |
| Normal Psig | 46.0 |
| Mop Psig | 50.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Third Party That Caused The Incident |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No scada at this location. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | Yes |
| Private Row Ind | Yes |
| Private Subtype | Private Business |
| Excavator Type | Unknown/other |
| Excavator Equipment | Backhoe/trackhoe |
| Work Performed | Unknown/other |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 805201511 |
| One Call Center Name | 811 |
| Locator Type | Utility Owner |
| Visible Marks | Yes |
| Service Interruption | Yes |
| Service Interruption Hours | 11.0 |
| Root Cause Category | Excavation Issue |
| Root Cause Type | Improper Excavation Practice Not Listed Above |
| Preparer Name | E*** B****** |
| Preparer Title | Regulatory Compliance |
| Preparer Email | E***@p**.com |
| Preparer Telephone | 925-357-7889 |
| Authorizer Name | S**** R******* |
| Authorizer Title | Manager Of Regulatory Compliance |
| Authorizer Telephone | 925-786-0267 |
| Authorizer Email | G***@p**.com |
| Narrative | On wednesday, march 28, 2018 at 1453 hours, pg&e was notified of a third party dig in at 56 south mcdonnell rd, in the city of south san francisco. A third party contractor, teichert construction, struck a 6' steel main with a backhoe. There was a valid USA ticket number (x805201511) and the gas line was located & day-lighted, but the excavator mistakenly believed it to be an abandoned water main and had instructed the excavation crew to remove it. While excavating to remove the gas main stub, the stub was damaged causing an unintentional release of gas. The repair crew arrived on-site at 1510 hours and stopped the flow of gas by closing the 3 valves by 1638 hours. The crew deactivated 29 feet of 6" steel main and welded on (2) 6" dead end caps. On 3/29/18, the crew installed 40' of 6" steel main and tied it back into service. Police and fire department were reported on site. Service was impacted to 1 customer. There were no injuries, no fatalities, and no ignition associated with this incident. This incident is being reported due to the unintentional release of gas and presence of channel 7 media helicopter observed at 1657 hours. On 4/17/18 at 1003 hours, pg&e determined that the estimated repair costs exceeded the >50k criteria and reported the incident to the DOT on 4/17/18 at 1016 hours (DOT report number 1209558). A 48 hour update was reported to the DOT on 4/18/18 at 0748 hours (DOT report number 1209623). |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA