HL incident on 2017-11-29 — TX

Operator
Enterprise Products Operating Llc
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$50,000
Incident datetime
2017-11-29 23:35
Report number
Location
TX
Narrative
On november 29th, 2017 at approximately 23:35 a release occurred just downstream of the p2 mainline pump at beaumont terminal. A pinhole leak was found in the 2" drain line on the 20" discharge pipe which resulted in a release of approximately .2 bbls of gasoline. The leak was contained to operator property and no product came in contact with any waterways. It was determined that the cost of cleanup and repair would exceed $50,000, so a call was made to the nrc on november 30th at 00:41 (nrc #1198390). A 48-hour follow-up call was made to the nrc on december 1st at 10:58 (#1198525). The area was cleaned up, a portion of the 20" pipe downstream of the pump was replaced with a new section of pipe (including a new 2" drain line), and the pump was returned to normal operations.
Detailed record list
Report Received Date
2017-12-22 00:00:00
Iyear
2017
Report Number
20170431
Supplemental Number
22990
Report Type
Original Final
Operator Id
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-11-29 23:35:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
0.2
Recovered Bbls
0.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-11-29 23:35:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-11-29 23:35:00
Restart Datetime
2017-11-30 02:40:00
On Site Datetime
2017-11-29 23:35:00
Nrc Rpt Datetime
2017-11-30 00:41:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Beaumont Terminal
Segment Name
P2
Onshore State Abbreviation
Tx
Onshore Postal Code
77705
Onshore City Name
Beaumont
Onshore County Name
Jefferson
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
12
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
20
Est Cost Prop Damage
50000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
50020
Accident Psig
540
Mop Psig
690
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller nor control room were a contributing factor
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Appurtenance Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Normal Wear And Tear
Preparer Name
E**** W*******
Preparer Title
Pipeline Compliance Engineer
Preparer Email
E********@e****.com
Preparer Telephone
713-381-5757
Prepared Date
2017-12-22 00:00:00
Authorizer Name
E**** W*******
Authorizer Telephone
713-381-5757
Authorizer Title
Pipeline Compliance Engineer
Authorizer Email
E********@e****.com
Narrative
On november 29th, 2017 at approximately 23:35 a release occurred just downstream of the p2 mainline pump at beaumont terminal. A pinhole leak was found in the 2" drain line on the 20" discharge pipe which resulted in a release of approximately .2 bbls of gasoline. The leak was contained to operator property and no product came in contact with any waterways. It was determined that the cost of cleanup and repair would exceed $50,000, so a call was made to the nrc on november 30th at 00:41 (nrc #1198390). A 48-hour follow-up call was made to the nrc on december 1st at 10:58 (#1198525). The area was cleaned up, a portion of the 20" pipe downstream of the pump was replaced with a new section of pipe (including a new 2" drain line), and the pump was returned to normal operations.
Report Received Date 2017-12-22 00:00:00
Iyear 2017
Report Number 20170431
Supplemental Number 22990
Report Type Original Final
Operator Id 31618 PHMSA Enforcement
Name Enterprise Products Operating Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-11-29 23:35:00
Location Latitude 30.0111 Google Maps OpenStreetMap
Location Longitude -94.0572 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 0.2
Recovered Bbls 0.2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2017-11-29 23:35:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-11-29 23:35:00
Restart Datetime 2017-11-30 02:40:00
On Site Datetime 2017-11-29 23:35:00
Nrc Rpt Datetime 2017-11-30 00:41:00
Nrc Rpt Num 1198390 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Beaumont Terminal
Segment Name P2
Onshore State Abbreviation Tx
Onshore Postal Code 77705
Onshore City Name Beaumont
Onshore County Name Jefferson
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 12
Crossing No
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 20
Est Cost Prop Damage 50000
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 0
Prpty 50020
Accident Psig 540
Mop Psig 690
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Controller nor control room were a contributing factor
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Appurtenance Failure
Eq Additional Other Ind Yes
Eq Additional Other Details Normal Wear And Tear
Preparer Name E**** W*******
Preparer Title Pipeline Compliance Engineer
Preparer Email E********@e****.com
Preparer Telephone 713-381-5757
Prepared Date 2017-12-22 00:00:00
Authorizer Name E**** W*******
Authorizer Telephone 713-381-5757
Authorizer Title Pipeline Compliance Engineer
Authorizer Email E********@e****.com
Narrative On november 29th, 2017 at approximately 23:35 a release occurred just downstream of the p2 mainline pump at beaumont terminal. A pinhole leak was found in the 2" drain line on the 20" discharge pipe which resulted in a release of approximately .2 bbls of gasoline. The leak was contained to operator property and no product came in contact with any waterways. It was determined that the cost of cleanup and repair would exceed $50,000, so a call was made to the nrc on november 30th at 00:41 (nrc #1198390). A 48-hour follow-up call was made to the nrc on december 1st at 10:58 (#1198525). The area was cleaned up, a portion of the 20" pipe downstream of the pump was replaced with a new section of pipe (including a new 2" drain line), and the pump was returned to normal operations.