Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2017-12-02 — TX
Operator
Wyoming Pipeline Company
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$5,000
Incident datetime
2017-12-02 06:00
Report number
Location
TX
Narrative
On december 1st work began on connecting a newly constructed tank to an existing pump and pipeline system. At the end of the work day the final set of flanges to the pump were lined up and studs and nuts were installed, there was some additional work that still needed to be completed to align the pump so these flanges were to be completed the following day.. During the night as the level of the tank rose, the limits on the mov on shell valve on the tank were not set correctly and the valve was not fully seated. As the tank level rose the shell valve began to leak by filling the newly constructed suction piping. When the crude in the new suction line filled to the point of the un-tightened flanges it began to leak into the pump containment. Based on tank gauges and site evaluation, it was determined that 33 barrels of crude was release on and around the pump pad. All free crude was removed from site with a vacuum truck and 2 loads of contaminate soil was removed and will be disposed of properly.
Detailed record list
Report Received Date
2017-12-21 00:00:00
Iyear
2017
Report Number
20170428
Supplemental Number
23047
Report Type
Supplemental Final
Operator Id
32537
Name
Wyoming Pipeline Company
Operator Street Address
825 Town & Country Lane
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77024
Local Datetime
2017-12-02 06:00:00
Location Latitude
43.66692
Location Longitude
-105.06688
Commodity Released Type
Crude Oil
Unintentional Release Bbls
33
Recovered Bbls
33
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-12-02 06:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Shut Down Prior To The Release For Maintenance.
On Site Datetime
2017-12-02 06:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Thunder Creek
Segment Name
Thunder Creek Station
Onshore State Abbreviation
Wy
Onshore Postal Code
82701
Onshore City Name
Not Within A Municipality
Onshore County Name
Weston
Designated Location
Milepost/valve Station
Designated Name
Thunder Creek
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Flange Assembly
Installation Year
2017
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
5000
Est Cost Emergency
15000
Est Cost Environmental
0
Est Cost Other
0
Prpty
20000
Accident Psig
5
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
There would have been no indication to the control room that the release occured.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related No Proc Ind
Yes
Category Type
Commissioning
Operator Qualification Ind
No
Preparer Name
M***** E*****
Preparer Title
Logistics Manager
Preparer Email
M******@p*********.com
Preparer Telephone
2192306675
Prepared Date
2018-01-16 00:00:00
Authorizer Name
M***** E*****
Authorizer Telephone
2192306675
Authorizer Title
Logistics Manager
Authorizer Email
M******@p*********.com
Narrative
On december 1st work began on connecting a newly constructed tank to an existing pump and pipeline system. At the end of the work day the final set of flanges to the pump were lined up and studs and nuts were installed, there was some additional work that still needed to be completed to align the pump so these flanges were to be completed the following day.. During the night as the level of the tank rose, the limits on the mov on shell valve on the tank were not set correctly and the valve was not fully seated. As the tank level rose the shell valve began to leak by filling the newly constructed suction piping. When the crude in the new suction line filled to the point of the un-tightened flanges it began to leak into the pump containment. Based on tank gauges and site evaluation, it was determined that 33 barrels of crude was release on and around the pump pad. All free crude was removed from site with a vacuum truck and 2 loads of contaminate soil was removed and will be disposed of properly.
| Report Received Date | 2017-12-21 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170428 |
| Supplemental Number | 23047 |
| Report Type | Supplemental Final |
| Operator Id | 32537 PHMSA Enforcement |
| Name | Wyoming Pipeline Company |
| Operator Street Address | 825 Town & Country Lane |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77024 |
| Local Datetime | 2017-12-02 06:00:00 |
| Location Latitude | 43.66692 Google Maps OpenStreetMap |
| Location Longitude | -105.06688 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 33 |
| Recovered Bbls | 33 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-12-02 06:00:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Was Shut Down Prior To The Release For Maintenance. |
| On Site Datetime | 2017-12-02 06:00:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Thunder Creek |
| Segment Name | Thunder Creek Station |
| Onshore State Abbreviation | Wy |
| Onshore Postal Code | 82701 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Weston |
| Designated Location | Milepost/valve Station |
| Designated Name | Thunder Creek |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Flange Assembly |
| Installation Year | 2017 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 5000 |
| Est Cost Emergency | 15000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 20000 |
| Accident Psig | 5 |
| Mop Psig | 285 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | There would have been no indication to the control room that the release occured. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Incorrect Operation |
| Cause Details | Equipment Not Installed Properly |
| Operation Type | Equipment Not Installed Properly |
| Related No Proc Ind | Yes |
| Category Type | Commissioning |
| Operator Qualification Ind | No |
| Preparer Name | M***** E***** |
| Preparer Title | Logistics Manager |
| Preparer Email | M******@p*********.com |
| Preparer Telephone | 2192306675 |
| Prepared Date | 2018-01-16 00:00:00 |
| Authorizer Name | M***** E***** |
| Authorizer Telephone | 2192306675 |
| Authorizer Title | Logistics Manager |
| Authorizer Email | M******@p*********.com |
| Narrative | On december 1st work began on connecting a newly constructed tank to an existing pump and pipeline system. At the end of the work day the final set of flanges to the pump were lined up and studs and nuts were installed, there was some additional work that still needed to be completed to align the pump so these flanges were to be completed the following day.. During the night as the level of the tank rose, the limits on the mov on shell valve on the tank were not set correctly and the valve was not fully seated. As the tank level rose the shell valve began to leak by filling the newly constructed suction piping. When the crude in the new suction line filled to the point of the un-tightened flanges it began to leak into the pump containment. Based on tank gauges and site evaluation, it was determined that 33 barrels of crude was release on and around the pump pad. All free crude was removed from site with a vacuum truck and 2 loads of contaminate soil was removed and will be disposed of properly. |