HL incident on 2017-12-01 — TX
Operator
Sunoco Pipeline L.p.
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$100
Incident datetime
2017-12-01 17:30
Report number
Location
TX
Narrative
On 12/01/2017 at approximately 17:30 hours, marysville station operator observed a crude oil leak at the densitometer loop. Immediate notification to local supervisor and control center was made and the pipeline was shutdown. The release of crude oil was estimated to be approximately 1 barrel and was completely contained on company property and cleaned up. The immediate cause of the leak was a seal failure for the densitometer sample loop. The seal failed due to the densitometer loop pump shaft shearing which caused an imbalance on the pump seal leading to its failure. The densitometer loop was isolated and the pipeline system was restarted. The densitometer pump was temporarily replaced with a spare unit. It was determined that the pump shaft sheared due to the magnetic drive decoupling allowing the shaft to spin in an unbalanced state. Subsequently, the sample loop and pump were permanently removed from the system and a new fork densitometer was installed.
Detailed record list
Report Received Date
2017-12-20 00:00:00
Iyear
2017
Report Number
20170424
Supplemental Number
22977
Report Type
Original Final
Operator Id
18718
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-12-01 17:30:00
Location Latitude
42.90143
Location Longitude
-82.50977
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1
Recovered Bbls
1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-12-01 17:30:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-12-01 17:33:00
Restart Datetime
2017-12-01 20:02:00
On Site Datetime
2017-12-01 17:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Marysville Station
Segment Name
13002-16" Cmar-Ctol
Onshore State Abbreviation
Mi
Onshore Postal Code
48079
Onshore City Name
St. Clair
Onshore County Name
St. Clair
Designated Location
Milepost/valve Station
Designated Name
00-Origin Ps
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Installation Year
2009
Material Involved
Material Other Than Carbon Steel
Material Details
Viton O-Ring
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
27
Est Cost Prop Damage
100
Est Cost Emergency
40750
Est Cost Environmental
5000
Est Cost Other
0
Prpty
45877
Accident Psig
721
Mop Psig
740
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Viton O-Ring Failure
Preparer Name
T*** G* N*******
Preparer Title
Sr. Manager-Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
281-637-6576
Preparer Fax
877-917-0448
Prepared Date
2017-12-20 00:00:00
Authorizer Name
T*** G* N*******
Authorizer Telephone
281-637-6576
Authorizer Title
Sr. Manager-Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 12/01/2017 at approximately 17:30 hours, marysville station operator observed a crude oil leak at the densitometer loop. Immediate notification to local supervisor and control center was made and the pipeline was shutdown. The release of crude oil was estimated to be approximately 1 barrel and was completely contained on company property and cleaned up. The immediate cause of the leak was a seal failure for the densitometer sample loop. The seal failed due to the densitometer loop pump shaft shearing which caused an imbalance on the pump seal leading to its failure. The densitometer loop was isolated and the pipeline system was restarted. The densitometer pump was temporarily replaced with a spare unit. It was determined that the pump shaft sheared due to the magnetic drive decoupling allowing the shaft to spin in an unbalanced state. Subsequently, the sample loop and pump were permanently removed from the system and a new fork densitometer was installed.
| Report Received Date | 2017-12-20 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170424 |
| Supplemental Number | 22977 |
| Report Type | Original Final |
| Operator Id | 18718 PHMSA Enforcement |
| Name | Sunoco Pipeline L.p. |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2017-12-01 17:30:00 |
| Location Latitude | 42.90143 Google Maps OpenStreetMap |
| Location Longitude | -82.50977 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1 |
| Recovered Bbls | 1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-12-01 17:30:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-12-01 17:33:00 |
| Restart Datetime | 2017-12-01 20:02:00 |
| On Site Datetime | 2017-12-01 17:30:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Marysville Station |
| Segment Name | 13002-16" Cmar-Ctol |
| Onshore State Abbreviation | Mi |
| Onshore Postal Code | 48079 |
| Onshore City Name | St. Clair |
| Onshore County Name | St. Clair |
| Designated Location | Milepost/valve Station |
| Designated Name | 00-Origin Ps |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pump |
| Installation Year | 2009 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Viton O-Ring |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 27 |
| Est Cost Prop Damage | 100 |
| Est Cost Emergency | 40750 |
| Est Cost Environmental | 5000 |
| Est Cost Other | 0 |
| Prpty | 45877 |
| Accident Psig | 721 |
| Mop Psig | 740 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Pump Or Pump-Related Equipment |
| Eq Failure Type | Pump Or Pump-Related Equipment |
| Other Pump Ind | Seal/packing Failure |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Viton O-Ring Failure |
| Preparer Name | T*** G* N******* |
| Preparer Title | Sr. Manager-Dot Compliance |
| Preparer Email | T************@e*************.com |
| Preparer Telephone | 281-637-6576 |
| Preparer Fax | 877-917-0448 |
| Prepared Date | 2017-12-20 00:00:00 |
| Authorizer Name | T*** G* N******* |
| Authorizer Telephone | 281-637-6576 |
| Authorizer Title | Sr. Manager-Dot Compliance |
| Authorizer Email | T************@e*************.com |
| Narrative | On 12/01/2017 at approximately 17:30 hours, marysville station operator observed a crude oil leak at the densitometer loop. Immediate notification to local supervisor and control center was made and the pipeline was shutdown. The release of crude oil was estimated to be approximately 1 barrel and was completely contained on company property and cleaned up. The immediate cause of the leak was a seal failure for the densitometer sample loop. The seal failed due to the densitometer loop pump shaft shearing which caused an imbalance on the pump seal leading to its failure. The densitometer loop was isolated and the pipeline system was restarted. The densitometer pump was temporarily replaced with a spare unit. It was determined that the pump shaft sheared due to the magnetic drive decoupling allowing the shaft to spin in an unbalanced state. Subsequently, the sample loop and pump were permanently removed from the system and a new fork densitometer was installed. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA