HL incident on 2017-11-29 — TX
Operator
Enbridge Energy, Limited Partnership
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$58,000
Incident datetime
2017-11-29 11:30
Report number
Location
TX
Narrative
On november 28, 2017 at approximately 12:40 est, sheen was observed on pooled water in the excavation site for an integrity dig on line 5 at mp 1549.67. The pipeline was immediately shutdown as a precaution. The excavation area was evacuated and plm and environmental support crews were dispatched to investigate. Investigation concluded that the sheen was a petroleum product. Nde was ordered and executed on november 29, 2017. At 11:30 est, the determination was made that a through-wall feature existed at a girth weld in the excavation which correlated the sheen with the pipeline. The nrc was notified (report # 1198339) due to the potential costs exceeding reportable thresholds. A sleeve was installed and the site was restored. Line 5 was restarted at 23:26 est on november 29, 2017. The actual volume released at mp 1549.67 was 0.0001 barrels. The PHMSA portal does not recognize volumes less than 0.01 barrels therefore that is the volume entered.
Detailed record list
Report Received Date
2017-12-19 00:00:00
Iyear
2017
Report Number
20170422
Supplemental Number
22968
Report Type
Original Final
Operator Id
11169
Name
Enbridge Energy, Limited Partnership
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2017-11-29 11:30:00
Location Latitude
44.839036
Location Longitude
-84.374795
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.01
Recovered Bbls
0.01
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2017-11-29 11:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-11-28 12:40:00
Restart Datetime
2017-11-29 23:26:00
On Site Datetime
2017-11-28 12:40:00
Nrc Rpt Datetime
2017-11-29 12:10:00
Nrc Rpt Num
1198339
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Line 5
Segment Name
Ma-Bc
Onshore State Abbreviation
Mi
Onshore Postal Code
55952
Onshore City Name
Lewiston
Onshore County Name
Crawford
Designated Location
Milepost/valve Station
Designated Name
1549.67
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
49
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Pipe Diameter
30
Pipe Wall Thickness
0.281
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Dsaw
Pipe Manufacturer
National Tubes
Pipe Coating Type
Coal Tar
Weld Subtype
Pipe Girth Weld
Installation Year
1953
Manufactured Year
1953
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
58000
Est Cost Emergency
3000
Est Cost Environmental
12000
Est Cost Other
0
Prpty
73000
Accident Psig
405
Mop Psig
701
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
66475
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Field personnel identified the leak and reported it to the control center.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind
Yes
Other Analysis Ind
Yes
Other Analysis Details
Nde
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Other Factor
Yes
Other Factor Details
Substandard Butt Weld
Additional Arc Burn Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Other Tool Tech Ind
Yes
Axial Recent Year
2017
Other Tool
Rosen Afd
Other Recent Year
2014
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1994
Hydrtst Most Rcnt Pressure
923
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S**** S****
Preparer Title
Compliance Analyst
Preparer Email
S**********@e*******.com
Preparer Telephone
715-395-3620
Preparer Fax
715-398-4802
Prepared Date
2017-12-19 00:00:00
Authorizer Name
R** C*******
Authorizer Telephone
715-395-3619
Authorizer Title
Supervisor Us Pipeline Compliance
Authorizer Email
R***********@e*******.com
Narrative
On november 28, 2017 at approximately 12:40 est, sheen was observed on pooled water in the excavation site for an integrity dig on line 5 at mp 1549.67. The pipeline was immediately shutdown as a precaution. The excavation area was evacuated and plm and environmental support crews were dispatched to investigate. Investigation concluded that the sheen was a petroleum product. Nde was ordered and executed on november 29, 2017. At 11:30 est, the determination was made that a through-wall feature existed at a girth weld in the excavation which correlated the sheen with the pipeline. The nrc was notified (report # 1198339) due to the potential costs exceeding reportable thresholds. A sleeve was installed and the site was restored. Line 5 was restarted at 23:26 est on november 29, 2017. The actual volume released at mp 1549.67 was 0.0001 barrels. The PHMSA portal does not recognize volumes less than 0.01 barrels therefore that is the volume entered.
| Report Received Date | 2017-12-19 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170422 |
| Supplemental Number | 22968 |
| Report Type | Original Final |
| Operator Id | 11169 PHMSA Enforcement |
| Name | Enbridge Energy, Limited Partnership |
| Operator Street Address | 915 N Eldridge Parkway, Suite 1100 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2017-11-29 11:30:00 |
| Location Latitude | 44.839036 Google Maps OpenStreetMap |
| Location Longitude | -84.374795 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.01 |
| Recovered Bbls | 0.01 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2017-11-29 11:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-11-28 12:40:00 |
| Restart Datetime | 2017-11-29 23:26:00 |
| On Site Datetime | 2017-11-28 12:40:00 |
| Nrc Rpt Datetime | 2017-11-29 12:10:00 |
| Nrc Rpt Num | 1198339 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Line 5 |
| Segment Name | Ma-Bc |
| Onshore State Abbreviation | Mi |
| Onshore Postal Code | 55952 |
| Onshore City Name | Lewiston |
| Onshore County Name | Crawford |
| Designated Location | Milepost/valve Station |
| Designated Name | 1549.67 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 49 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Weld, Including Heat-Affected Zone |
| Pipe Diameter | 30 |
| Pipe Wall Thickness | 0.281 |
| Pipe Smys | 52000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Dsaw |
| Pipe Manufacturer | National Tubes |
| Pipe Coating Type | Coal Tar |
| Weld Subtype | Pipe Girth Weld |
| Installation Year | 1953 |
| Manufactured Year | 1953 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 58000 |
| Est Cost Emergency | 3000 |
| Est Cost Environmental | 12000 |
| Est Cost Other | 0 |
| Prpty | 73000 |
| Accident Psig | 405 |
| Mop Psig | 701 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 66475 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Field personnel identified the leak and reported it to the control center. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Design-, Construction-, Installation-, Or Fabrication-Related |
| Field Exam Ind | Yes |
| Other Analysis Ind | Yes |
| Other Analysis Details | Nde |
| Failure Type | Design-, Construction-, Installation-, Or Fabrication-Related |
| Other Factor | Yes |
| Other Factor Details | Substandard Butt Weld |
| Additional Arc Burn Ind | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Other Tool Tech Ind | Yes |
| Axial Recent Year | 2017 |
| Other Tool | Rosen Afd |
| Other Recent Year | 2014 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 1994 |
| Hydrtst Most Rcnt Pressure | 923 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S**** S**** |
| Preparer Title | Compliance Analyst |
| Preparer Email | S**********@e*******.com |
| Preparer Telephone | 715-395-3620 |
| Preparer Fax | 715-398-4802 |
| Prepared Date | 2017-12-19 00:00:00 |
| Authorizer Name | R** C******* |
| Authorizer Telephone | 715-395-3619 |
| Authorizer Title | Supervisor Us Pipeline Compliance |
| Authorizer Email | R***********@e*******.com |
| Narrative | On november 28, 2017 at approximately 12:40 est, sheen was observed on pooled water in the excavation site for an integrity dig on line 5 at mp 1549.67. The pipeline was immediately shutdown as a precaution. The excavation area was evacuated and plm and environmental support crews were dispatched to investigate. Investigation concluded that the sheen was a petroleum product. Nde was ordered and executed on november 29, 2017. At 11:30 est, the determination was made that a through-wall feature existed at a girth weld in the excavation which correlated the sheen with the pipeline. The nrc was notified (report # 1198339) due to the potential costs exceeding reportable thresholds. A sleeve was installed and the site was restored. Line 5 was restarted at 23:26 est on november 29, 2017. The actual volume released at mp 1549.67 was 0.0001 barrels. The PHMSA portal does not recognize volumes less than 0.01 barrels therefore that is the volume entered. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA