Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2017-10-25 — TX
Operator
Delek Crude Logistics, Llc.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$80,000
Incident datetime
2017-10-25 06:55
Report number
Location
TX
Narrative
While pipeline was operating under normal parameters, a leak was discovered with oil on the surface of the ground by the local operator personnel. Upon excavation and inspection, a small pin hole was found. Upon discovering the leak, the pipeline was shutdown. The oil that reached the surface was contained on site in a containment pit. Hazwoper personnel were dispatched to the site for cleanup and remediation. The texas railroad commission was notified. Corrective action taken by delek logististcs in efforts to prevent this from happening at this location was reestablishing cathodic protection to prevent stray current and replacing the leaking pipe sections with new pipe.
Detailed record list
Report Received Date
2017-11-22 00:00:00
Iyear
2017
Report Number
20170385
Supplemental Number
30067
Report Type
Supplemental Final
Operator Id
26061
Name
Delek Crude Logistics, Llc.
Operator Street Address
5850 Granite Parkway #450
Operator City Name
Plano
Operator State Abbreviation
TX
Operator Postal Code
75024
Local Datetime
2017-10-25 06:55:00
Location Latitude
32.23895
Location Longitude
-95.02666667
Commodity Released Type
Crude Oil
Unintentional Release Bbls
8
Recovered Bbls
5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-10-25 06:55:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-10-25 06:57:00
Restart Datetime
2017-11-03 09:30:00
On Site Datetime
2017-10-25 07:05:00
Nrc Rpt Datetime
2017-10-25 09:10:00
Nrc Rpt Num
1194249
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Arp Station
Segment Name
Arp-Tyler 6"
Onshore State Abbreviation
Tx
Onshore Postal Code
75750
Onshore City Name
Arp
Onshore County Name
Smith
Designated Location
Milepost/valve Station
Designated Name
Arp Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6
Pipe Wall Thickness
0.28
Pipe Smys
35000
Pipe Specification
5l Grb
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
None
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
440
Est Cost Prop Damage
80000
Est Cost Emergency
48000
Est Cost Environmental
0
Est Cost Other
0
Est Cost Other Details
Commodity Lost Based On Approximate $55 Oil.
Prpty
128440
Accident Psig
630
Mop Psig
780
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Arp station is on local control and not subject to crm rules; it's not controlled form a remote control room.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Stray Current Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1992
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2016
Prior Damage
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2015
Hydrtst Most Rcnt Pressure
990
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
M***** P****
Preparer Title
Asset Integrity Engineer
Preparer Email
M***********@d*************.com
Preparer Telephone
972-998-7923
Prepared Date
2018-03-20 00:00:00
Authorizer Name
G**** G****
Authorizer Telephone
870.864.1372
Authorizer Title
Sr. Project Engineer
Authorizer Email
G**********@d*************.com
Narrative
While pipeline was operating under normal parameters, a leak was discovered with oil on the surface of the ground by the local operator personnel. Upon excavation and inspection, a small pin hole was found. Upon discovering the leak, the pipeline was shutdown. The oil that reached the surface was contained on site in a containment pit. Hazwoper personnel were dispatched to the site for cleanup and remediation. The texas railroad commission was notified. Corrective action taken by delek logististcs in efforts to prevent this from happening at this location was reestablishing cathodic protection to prevent stray current and replacing the leaking pipe sections with new pipe.
| Report Received Date | 2017-11-22 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170385 |
| Supplemental Number | 30067 |
| Report Type | Supplemental Final |
| Operator Id | 26061 PHMSA Enforcement |
| Name | Delek Crude Logistics, Llc. |
| Operator Street Address | 5850 Granite Parkway #450 |
| Operator City Name | Plano |
| Operator State Abbreviation | TX |
| Operator Postal Code | 75024 |
| Local Datetime | 2017-10-25 06:55:00 |
| Location Latitude | 32.23895 Google Maps OpenStreetMap |
| Location Longitude | -95.02666667 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 8 |
| Recovered Bbls | 5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-10-25 06:55:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-10-25 06:57:00 |
| Restart Datetime | 2017-11-03 09:30:00 |
| On Site Datetime | 2017-10-25 07:05:00 |
| Nrc Rpt Datetime | 2017-10-25 09:10:00 |
| Nrc Rpt Num | 1194249 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Arp Station |
| Segment Name | Arp-Tyler 6" |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 75750 |
| Onshore City Name | Arp |
| Onshore County Name | Smith |
| Designated Location | Milepost/valve Station |
| Designated Name | Arp Station |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 36 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 6 |
| Pipe Wall Thickness | 0.28 |
| Pipe Smys | 35000 |
| Pipe Specification | 5l Grb |
| Pipe Seam Type | Erw � Unknown Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | None |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 440 |
| Est Cost Prop Damage | 80000 |
| Est Cost Emergency | 48000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Est Cost Other Details | Commodity Lost Based On Approximate $55 Oil. |
| Prpty | 128440 |
| Accident Psig | 630 |
| Mop Psig | 780 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Arp station is on local control and not subject to crm rules; it's not controlled form a remote control room. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Stray Current Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | Yes |
| Cathodic Pro Start Year | 1992 |
| Shielding Evident | No |
| Cathodic Survey Type | Yes |
| Cp Annual Survey Ind | Yes |
| Cp Annual Survey Year | 2016 |
| Prior Damage | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2015 |
| Hydrtst Most Rcnt Pressure | 990 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | M***** P**** |
| Preparer Title | Asset Integrity Engineer |
| Preparer Email | M***********@d*************.com |
| Preparer Telephone | 972-998-7923 |
| Prepared Date | 2018-03-20 00:00:00 |
| Authorizer Name | G**** G**** |
| Authorizer Telephone | 870.864.1372 |
| Authorizer Title | Sr. Project Engineer |
| Authorizer Email | G**********@d*************.com |
| Narrative | While pipeline was operating under normal parameters, a leak was discovered with oil on the surface of the ground by the local operator personnel. Upon excavation and inspection, a small pin hole was found. Upon discovering the leak, the pipeline was shutdown. The oil that reached the surface was contained on site in a containment pit. Hazwoper personnel were dispatched to the site for cleanup and remediation. The texas railroad commission was notified. Corrective action taken by delek logististcs in efforts to prevent this from happening at this location was reestablishing cathodic protection to prevent stray current and replacing the leaking pipe sections with new pipe. |