Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2017-10-17 — TX
Operator
Summit Midstream Partners, Llc
Cause
Natural Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$80
Incident datetime
2017-10-17 11:47
Report number
Location
TX
Narrative
A crude oil leak of approximately 30 gallons was discovered by local operations personnel while performing a routine inspection of the divide station located in divide county, nd. The investigation revealed the camlock dust cap on the 55k bbl breakout tank (tank 1904)drain line had developed a crack. A contributing factor was the ball valve for the 4" drain line was in the closed position but did not properly seat allowing product to seep. The ball valve for the drain line was closed in the reverse position and eliminated the leak. A secondary valve was installed in place of the camlock dust cap. Replacement of the drain line valve is scheduled for repair and the camlock dust cap will be replaced with a heavy wall stainless steel cap. Supplemental report submitted on 12/13/17 to finalize the report. No additional information or changes to report.
Detailed record list
Report Received Date
2017-11-16 00:00:00
Iyear
2017
Report Number
20170375
Supplemental Number
22938
Report Type
Supplemental Final
Operator Id
39012
Name
Summit Midstream Partners, Llc
Operator Street Address
910 Louisiana St. Suite 4200
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-10-17 11:47:00
Location Latitude
48.80512
Location Longitude
-103.61746
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.7
Recovered Bbls
0.7
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-10-17 11:47:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Station Already Shut-In Due To Scheduled Maintenance By Electric Provider.
On Site Datetime
2017-10-17 11:47:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Divide Station
Segment Name
Tank 1904 - 55k Bbl Tank
Onshore State Abbreviation
Nd
Onshore Postal Code
58844
Onshore City Name
Not Within A Municipality
Onshore County Name
Divide
Designated Location
Milepost/valve Station
Designated Name
Breakout Tank
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Other
Tank Type
Atmospheric
Item Involved Details
Camlock Dust Cap
Installation Year
2014
Material Involved
Material Other Than Carbon Steel
Material Details
Aluminum
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
35
Est Cost Prop Damage
80
Est Cost Emergency
100
Est Cost Environmental
5000
Est Cost Other
0
Prpty
5215
Accident Psig
0.25
Mop Psig
0.5
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Gathering
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Temperature
Natural Force Type
Temperature
Temperature Subtype
Thermal Stress
Nf Extreme Weather Ind
No
Preparer Name
A***** G***** J**
Preparer Title
Pipeline Compliance Manager
Preparer Email
A******@s**************.com
Preparer Telephone
832-608-6145
Prepared Date
2017-12-13 00:00:00
Authorizer Name
A***** G***** J**
Authorizer Telephone
832-608-6145
Authorizer Title
Pipeline Compliance Manager
Authorizer Email
Agarcia2summitmidstream.com
Narrative
A crude oil leak of approximately 30 gallons was discovered by local operations personnel while performing a routine inspection of the divide station located in divide county, nd. The investigation revealed the camlock dust cap on the 55k bbl breakout tank (tank 1904)drain line had developed a crack. A contributing factor was the ball valve for the 4" drain line was in the closed position but did not properly seat allowing product to seep. The ball valve for the drain line was closed in the reverse position and eliminated the leak. A secondary valve was installed in place of the camlock dust cap. Replacement of the drain line valve is scheduled for repair and the camlock dust cap will be replaced with a heavy wall stainless steel cap. Supplemental report submitted on 12/13/17 to finalize the report. No additional information or changes to report.
| Report Received Date | 2017-11-16 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170375 |
| Supplemental Number | 22938 |
| Report Type | Supplemental Final |
| Operator Id | 39012 PHMSA Enforcement |
| Name | Summit Midstream Partners, Llc |
| Operator Street Address | 910 Louisiana St. Suite 4200 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2017-10-17 11:47:00 |
| Location Latitude | 48.80512 Google Maps OpenStreetMap |
| Location Longitude | -103.61746 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.7 |
| Recovered Bbls | 0.7 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-10-17 11:47:00 |
| System Part Involved | Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Station Already Shut-In Due To Scheduled Maintenance By Electric Provider. |
| On Site Datetime | 2017-10-17 11:47:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Divide Station |
| Segment Name | Tank 1904 - 55k Bbl Tank |
| Onshore State Abbreviation | Nd |
| Onshore Postal Code | 58844 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Divide |
| Designated Location | Milepost/valve Station |
| Designated Name | Breakout Tank |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Tank, Including Attached Appurtenances |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Other |
| Tank Type | Atmospheric |
| Item Involved Details | Camlock Dust Cap |
| Installation Year | 2014 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Aluminum |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 35 |
| Est Cost Prop Damage | 80 |
| Est Cost Emergency | 100 |
| Est Cost Environmental | 5000 |
| Est Cost Other | 0 |
| Prpty | 5215 |
| Accident Psig | 0.25 |
| Mop Psig | 0.5 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Gathering |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Natural Force Damage |
| Cause Details | Temperature |
| Natural Force Type | Temperature |
| Temperature Subtype | Thermal Stress |
| Nf Extreme Weather Ind | No |
| Preparer Name | A***** G***** J** |
| Preparer Title | Pipeline Compliance Manager |
| Preparer Email | A******@s**************.com |
| Preparer Telephone | 832-608-6145 |
| Prepared Date | 2017-12-13 00:00:00 |
| Authorizer Name | A***** G***** J** |
| Authorizer Telephone | 832-608-6145 |
| Authorizer Title | Pipeline Compliance Manager |
| Authorizer Email | Agarcia2summitmidstream.com |
| Narrative | A crude oil leak of approximately 30 gallons was discovered by local operations personnel while performing a routine inspection of the divide station located in divide county, nd. The investigation revealed the camlock dust cap on the 55k bbl breakout tank (tank 1904)drain line had developed a crack. A contributing factor was the ball valve for the 4" drain line was in the closed position but did not properly seat allowing product to seep. The ball valve for the drain line was closed in the reverse position and eliminated the leak. A secondary valve was installed in place of the camlock dust cap. Replacement of the drain line valve is scheduled for repair and the camlock dust cap will be replaced with a heavy wall stainless steel cap. Supplemental report submitted on 12/13/17 to finalize the report. No additional information or changes to report. |