HL incident on 2017-10-20 — OH
Operator
Marathon Pipe Line Llc
Cause
Incorrect Operation
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$250
Incident datetime
2017-10-20 04:09
Report number
Location
OH
Narrative
On october 20, 2017, marathon pipe line field personnel and contract crews were on-site and in the process of recommissioning the line following maintenance, when a release occurred. A thread-o-ring (tor) completion plug was blown out at approximately 4:09 am cst, while completing a static-pressure test. At approximately 5:11 am cst, mpl determined this release was nrc reportable due to it still being active and therefore, estimated clean-up and repair costs exceeding the $50,000 threshold. When the release occurred, crews had to retreat from the area due to safety concerns. Additionally, seven residences were evacuated voluntarily, which included approximately twenty people. Therefore, the tor isolation valve at the source of the release continued to be inaccessible for approximately 12 hours, until precautions could be taken to make safe entry to the release point to close the valve. Total release volume is estimated at 1,096 barrels. Both mpl employees and contractor personnel were drug tested. Mpl employees experienced a miscommunication with paperwork at the clinic and alcohol testing was not completed. The cause of the release was determined to be a plug installation failure as a result of the contract employee not following the procedure. The initial nrc report #1193767 (as noted in part a, question 6) was made on october 20, 2017, at 5:47 am cst. The 48-hour update report, #1193916, was made on october 21, 2017, at 1:37 pm cst to provide an updated volume estimate. 12/14/17: part a, question 14 - updated our response to "yes". Part d, question 8e - updated long-term remediation costs. 2/15/18: part d, question 8 - updated with final cost estimates. Part h - updated the narrative with investigation results.
Detailed record list
Report Received Date
2017-11-15 00:00:00
Iyear
2017
Report Number
20170372
Supplemental Number
23138
Report Type
Supplemental Final
Operator Id
32147
Name
Marathon Pipe Line Llc
Operator Street Address
539 South Main Street
Operator City Name
Findlay
Operator State Abbreviation
OH
Operator Postal Code
45840
Local Datetime
2017-10-20 04:09:00
Location Latitude
39.161789
Location Longitude
-87.798836
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
1096
Recovered Bbls
662
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-10-20 04:09:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-10-20 04:09:00
Restart Datetime
2017-10-21 04:01:00
On Site Datetime
2017-10-20 04:09:00
Nrc Rpt Datetime
2017-10-20 05:47:00
Nrc Rpt Num
1193767
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
20
Pipe Fac Name
Wabash 12 Inch Products System
Segment Name
Robinson Wabash - Martinsville Wabash Junction 12"
Onshore State Abbreviation
Il
Onshore Postal Code
62413
Onshore City Name
Annapolis
Onshore County Name
Crawford
Designated Location
Milepost/valve Station
Designated Name
12.6
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Thread-O-Ring Completion Plug
Installation Year
2017
Material Involved
Material Other Than Carbon Steel
Material Details
The Plug Was Brass.
Release Type
Leak
Leak Type
Other
Leak Type Other
Plug Installation Failure.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5000
Est Cost Gas Released
91650
Est Cost Prop Damage
250
Est Cost Emergency
477572
Est Cost Environmental
160000
Est Cost Other
0
Prpty
734472
Accident Psig
504
Mop Psig
1180
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
133325
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
Yes
Num Employees Tested
5
Num Employees Failed
0
Num Contractors Tested
7
Num Contractors Failed
0
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related Failure Follow Ind
Yes
Category Type
Commissioning
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
D******* S***
Preparer Title
Hes Professional
Preparer Email
D*****@m****************.com
Preparer Telephone
419-421-2121
Prepared Date
2018-02-15 00:00:00
Authorizer Name
R****** W* B*****
Authorizer Telephone
419-421-2121
Authorizer Title
Regulatory And Compliance Supervisor
Authorizer Email
R*******@m****************.com
Narrative
On october 20, 2017, marathon pipe line field personnel and contract crews were on-site and in the process of recommissioning the line following maintenance, when a release occurred. A thread-o-ring (tor) completion plug was blown out at approximately 4:09 am cst, while completing a static-pressure test. At approximately 5:11 am cst, mpl determined this release was nrc reportable due to it still being active and therefore, estimated clean-up and repair costs exceeding the $50,000 threshold. When the release occurred, crews had to retreat from the area due to safety concerns. Additionally, seven residences were evacuated voluntarily, which included approximately twenty people. Therefore, the tor isolation valve at the source of the release continued to be inaccessible for approximately 12 hours, until precautions could be taken to make safe entry to the release point to close the valve. Total release volume is estimated at 1,096 barrels. Both mpl employees and contractor personnel were drug tested. Mpl employees experienced a miscommunication with paperwork at the clinic and alcohol testing was not completed. The cause of the release was determined to be a plug installation failure as a result of the contract employee not following the procedure. The initial nrc report #1193767 (as noted in part a, question 6) was made on october 20, 2017, at 5:47 am cst. The 48-hour update report, #1193916, was made on october 21, 2017, at 1:37 pm cst to provide an updated volume estimate. 12/14/17: part a, question 14 - updated our response to "yes". Part d, question 8e - updated long-term remediation costs. 2/15/18: part d, question 8 - updated with final cost estimates. Part h - updated the narrative with investigation results.
| Report Received Date | 2017-11-15 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170372 |
| Supplemental Number | 23138 |
| Report Type | Supplemental Final |
| Operator Id | 32147 PHMSA Enforcement |
| Name | Marathon Pipe Line Llc |
| Operator Street Address | 539 South Main Street |
| Operator City Name | Findlay |
| Operator State Abbreviation | OH |
| Operator Postal Code | 45840 |
| Local Datetime | 2017-10-20 04:09:00 |
| Location Latitude | 39.161789 Google Maps OpenStreetMap |
| Location Longitude | -87.798836 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 1096 |
| Recovered Bbls | 662 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-10-20 04:09:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-10-20 04:09:00 |
| Restart Datetime | 2017-10-21 04:01:00 |
| On Site Datetime | 2017-10-20 04:09:00 |
| Nrc Rpt Datetime | 2017-10-20 05:47:00 |
| Nrc Rpt Num | 1193767 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 20 |
| Pipe Fac Name | Wabash 12 Inch Products System |
| Segment Name | Robinson Wabash - Martinsville Wabash Junction 12" |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 62413 |
| Onshore City Name | Annapolis |
| Onshore County Name | Crawford |
| Designated Location | Milepost/valve Station |
| Designated Name | 12.6 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 36 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Other |
| Item Involved Details | Thread-O-Ring Completion Plug |
| Installation Year | 2017 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | The Plug Was Brass. |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | Plug Installation Failure. |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 5000 |
| Est Cost Gas Released | 91650 |
| Est Cost Prop Damage | 250 |
| Est Cost Emergency | 477572 |
| Est Cost Environmental | 160000 |
| Est Cost Other | 0 |
| Prpty | 734472 |
| Accident Psig | 504 |
| Mop Psig | 1180 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 133325 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | Yes |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | Yes |
| Num Employees Tested | 5 |
| Num Employees Failed | 0 |
| Num Contractors Tested | 7 |
| Num Contractors Failed | 0 |
| Cause | Incorrect Operation |
| Cause Details | Equipment Not Installed Properly |
| Operation Type | Equipment Not Installed Properly |
| Related Failure Follow Ind | Yes |
| Category Type | Commissioning |
| Operator Qualification Ind | Yes |
| Qualified Individuals | Yes, They Were Qualified For The Task(S) |
| Preparer Name | D******* S*** |
| Preparer Title | Hes Professional |
| Preparer Email | D*****@m****************.com |
| Preparer Telephone | 419-421-2121 |
| Prepared Date | 2018-02-15 00:00:00 |
| Authorizer Name | R****** W* B***** |
| Authorizer Telephone | 419-421-2121 |
| Authorizer Title | Regulatory And Compliance Supervisor |
| Authorizer Email | R*******@m****************.com |
| Narrative | On october 20, 2017, marathon pipe line field personnel and contract crews were on-site and in the process of recommissioning the line following maintenance, when a release occurred. A thread-o-ring (tor) completion plug was blown out at approximately 4:09 am cst, while completing a static-pressure test. At approximately 5:11 am cst, mpl determined this release was nrc reportable due to it still being active and therefore, estimated clean-up and repair costs exceeding the $50,000 threshold. When the release occurred, crews had to retreat from the area due to safety concerns. Additionally, seven residences were evacuated voluntarily, which included approximately twenty people. Therefore, the tor isolation valve at the source of the release continued to be inaccessible for approximately 12 hours, until precautions could be taken to make safe entry to the release point to close the valve. Total release volume is estimated at 1,096 barrels. Both mpl employees and contractor personnel were drug tested. Mpl employees experienced a miscommunication with paperwork at the clinic and alcohol testing was not completed. The cause of the release was determined to be a plug installation failure as a result of the contract employee not following the procedure. The initial nrc report #1193767 (as noted in part a, question 6) was made on october 20, 2017, at 5:47 am cst. The 48-hour update report, #1193916, was made on october 21, 2017, at 1:37 pm cst to provide an updated volume estimate. 12/14/17: part a, question 14 - updated our response to "yes". Part d, question 8e - updated long-term remediation costs. 2/15/18: part d, question 8 - updated with final cost estimates. Part h - updated the narrative with investigation results. |