HL incident on 2017-10-16 — OK
Operator
Oneok Ngl Pipeline, Llc
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$9,500
Incident datetime
2017-10-16 08:30
Report number
Location
OK
Narrative
At approximately 08:21 on october 16th, 2017, oneok pipeline control received a call from the oneok contract inspector working with the nde team at the oneok blue river pump station. The inspector had identified and an ice ball and vapors coming from a weld-o-let for the 1" flare line on the discharge piping of the pump. The pump suction valve and discharge valve had previously been closed which isolated the failure. Operations personnel responded to the site and locked-out the pump piping and de-pressured the piping. This piping had been previously excavated and the coating removed to allow for a nde examination. The exposed 1" flare piping connected to the weld-o-let had been left unsupported which allowed the weld-o-let to fail. The discharge piping with the cracked weld-o-let was removed and replaced with new pre-tested pipe with a nipple-o-let installed. The pump station has been isolated from the pipeline and hydrocarbons evacuated until all nde testing is complete. Edited 5/17/2018 by n. Jones the pump station was returned to service on 3/01/2017 at 17:00 hrs. Following the completion of the nde testing and additional maintenance.
Detailed record list
Report Received Date
2017-11-14 00:00:00
Iyear
2017
Report Number
20170369
Supplemental Number
30332
Report Type
Supplemental Final
Operator Id
32109
Name
Oneok Ngl Pipeline, Llc
Operator Street Address
100 West Fifth Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2017-10-16 08:30:00
Location Latitude
34.188862
Location Longitude
-96.484629
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
4.4
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2017-10-16 08:30:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-10-16 08:00:00
Restart Datetime
2018-03-01 17:00:00
On Site Datetime
2017-10-16 08:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Oneok Blue River Pump Station (Site 605)
Segment Name
Oneok Sterling Iii Pipeline Index #10547
Onshore State Abbreviation
Ok
Onshore Postal Code
73432
Onshore City Name
Not Within A Municipality
Onshore County Name
Johnston
Designated Location
Milepost/valve Station
Designated Name
Pump Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
60
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
2013
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
160
Est Cost Prop Damage
9500
Est Cost Emergency
200
Est Cost Environmental
0
Est Cost Other
0
Prpty
9860
Accident Psig
500
Mop Psig
2025
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No controller actions had taken place prior to the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Failure Details
Weld-O-Let For Blow Down Piping Installed On Pump Discharge Line Developed Crack After Being Left Unsupported After Excavation.
Additional Support Ind
Yes
Preparer Name
N*** J****
Preparer Title
Requlatory Compliance Manager
Preparer Email
N*********@o****.com
Preparer Telephone
580-395-6304
Preparer Fax
580-395-2933
Prepared Date
2018-05-17 00:00:00
Authorizer Name
N*** J****
Authorizer Telephone
580-395-6304
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
N*********@o****.com
Narrative
At approximately 08:21 on october 16th, 2017, oneok pipeline control received a call from the oneok contract inspector working with the nde team at the oneok blue river pump station. The inspector had identified and an ice ball and vapors coming from a weld-o-let for the 1" flare line on the discharge piping of the pump. The pump suction valve and discharge valve had previously been closed which isolated the failure. Operations personnel responded to the site and locked-out the pump piping and de-pressured the piping. This piping had been previously excavated and the coating removed to allow for a nde examination. The exposed 1" flare piping connected to the weld-o-let had been left unsupported which allowed the weld-o-let to fail. The discharge piping with the cracked weld-o-let was removed and replaced with new pre-tested pipe with a nipple-o-let installed. The pump station has been isolated from the pipeline and hydrocarbons evacuated until all nde testing is complete. Edited 5/17/2018 by n. Jones the pump station was returned to service on 3/01/2017 at 17:00 hrs. Following the completion of the nde testing and additional maintenance.
| Report Received Date | 2017-11-14 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170369 |
| Supplemental Number | 30332 |
| Report Type | Supplemental Final |
| Operator Id | 32109 PHMSA Enforcement |
| Name | Oneok Ngl Pipeline, Llc |
| Operator Street Address | 100 West Fifth Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2017-10-16 08:30:00 |
| Location Latitude | 34.188862 Google Maps OpenStreetMap |
| Location Longitude | -96.484629 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid) |
| Unintentional Release Bbls | 4.4 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2017-10-16 08:30:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-10-16 08:00:00 |
| Restart Datetime | 2018-03-01 17:00:00 |
| On Site Datetime | 2017-10-16 08:30:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Oneok Blue River Pump Station (Site 605) |
| Segment Name | Oneok Sterling Iii Pipeline Index #10547 |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 73432 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Johnston |
| Designated Location | Milepost/valve Station |
| Designated Name | Pump Station |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 60 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Auxiliary Piping (E.g. Drain Lines) |
| Installation Year | 2013 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 160 |
| Est Cost Prop Damage | 9500 |
| Est Cost Emergency | 200 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 9860 |
| Accident Psig | 500 |
| Mop Psig | 2025 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No controller actions had taken place prior to the release. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Failure Details | Weld-O-Let For Blow Down Piping Installed On Pump Discharge Line Developed Crack After Being Left Unsupported After Excavation. |
| Additional Support Ind | Yes |
| Preparer Name | N*** J**** |
| Preparer Title | Requlatory Compliance Manager |
| Preparer Email | N*********@o****.com |
| Preparer Telephone | 580-395-6304 |
| Preparer Fax | 580-395-2933 |
| Prepared Date | 2018-05-17 00:00:00 |
| Authorizer Name | N*** J**** |
| Authorizer Telephone | 580-395-6304 |
| Authorizer Title | Regulatory Compliance Manager |
| Authorizer Email | N*********@o****.com |
| Narrative | At approximately 08:21 on october 16th, 2017, oneok pipeline control received a call from the oneok contract inspector working with the nde team at the oneok blue river pump station. The inspector had identified and an ice ball and vapors coming from a weld-o-let for the 1" flare line on the discharge piping of the pump. The pump suction valve and discharge valve had previously been closed which isolated the failure. Operations personnel responded to the site and locked-out the pump piping and de-pressured the piping. This piping had been previously excavated and the coating removed to allow for a nde examination. The exposed 1" flare piping connected to the weld-o-let had been left unsupported which allowed the weld-o-let to fail. The discharge piping with the cracked weld-o-let was removed and replaced with new pre-tested pipe with a nipple-o-let installed. The pump station has been isolated from the pipeline and hydrocarbons evacuated until all nde testing is complete. Edited 5/17/2018 by n. Jones the pump station was returned to service on 3/01/2017 at 17:00 hrs. Following the completion of the nde testing and additional maintenance. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA