HL incident on 2017-10-22 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$150
Incident datetime
2017-10-22 02:35
Report number
Location
TX
Narrative
On 10/22/17 at approximately 02:35 local operating personnel discovered crude oil on top of the soil near the n-1 header. All movements were shutdown and remained shutdown until the source could be identified. There are numerous 3rd party delivery points located on this header. At 12:40 operating personnel identified the source of the release to be a compression fitting on the tubing for the sample system. The nrc was immediately notified after confirmed discovery and knowledge of the cost to exceed $50,000. A final report will be submitted once the failure analysis is complete. 5/21/2018 (update): failure analysis states that the leak is attributed to the tubing separating from the coupling underground. The observed mechanical damage to tubing suggests that external mechanical stresses were applied to the tube. It is possible that these stresses loosened the tube, which caused the separation while the tubing was operating.
Detailed record list
Report Received Date
2017-11-14 00:00:00
Iyear
2017
Report Number
20170366
Supplemental Number
30360
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-10-22 02:35:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
80
Recovered Bbls
80
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-10-22 02:35:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-10-22 02:35:00
Restart Datetime
2017-10-22 13:00:00
On Site Datetime
2017-10-22 02:35:00
Nrc Rpt Datetime
2017-10-22 14:36:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cushing Tk Farm
Segment Name
N-1 Header
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Cushing
Onshore County Name
Lincoln
Designated Location
Milepost/valve Station
Designated Name
Cushing Tk
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
24
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tubing
Installation Year
1997
Material Involved
Material Other Than Carbon Steel
Material Details
Stainless Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
4000
Est Cost Prop Damage
150
Est Cost Emergency
776000
Est Cost Environmental
0
Est Cost Other
0
Prpty
780150
Accident Psig
126
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller nor control room were a contributing factor.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Defective Or Loose Tubing Or Fitting
Eq Failure Type
Defective Or Loose Tubing Or Fitting
Additional Support Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Internal & External Pressure & Stresses
Preparer Name
L**** W*******
Preparer Email
L*********@e****.com
Preparer Telephone
713-381-6748
Prepared Date
2018-05-21 00:00:00
Authorizer Name
L**** W*******
Authorizer Telephone
713-381-6748
Authorizer Title
Pipeline Compliance Senior Engineer
Authorizer Email
L*********@e****.com
Narrative
On 10/22/17 at approximately 02:35 local operating personnel discovered crude oil on top of the soil near the n-1 header. All movements were shutdown and remained shutdown until the source could be identified. There are numerous 3rd party delivery points located on this header. At 12:40 operating personnel identified the source of the release to be a compression fitting on the tubing for the sample system. The nrc was immediately notified after confirmed discovery and knowledge of the cost to exceed $50,000. A final report will be submitted once the failure analysis is complete. 5/21/2018 (update): failure analysis states that the leak is attributed to the tubing separating from the coupling underground. The observed mechanical damage to tubing suggests that external mechanical stresses were applied to the tube. It is possible that these stresses loosened the tube, which caused the separation while the tubing was operating.
Report Received Date 2017-11-14 00:00:00
Iyear 2017
Report Number 20170366
Supplemental Number 30360
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-10-22 02:35:00
Location Latitude 35.939959 Google Maps OpenStreetMap
Location Longitude -96.747774 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 80
Recovered Bbls 80
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2017-10-22 02:35:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-10-22 02:35:00
Restart Datetime 2017-10-22 13:00:00
On Site Datetime 2017-10-22 02:35:00
Nrc Rpt Datetime 2017-10-22 14:36:00
Nrc Rpt Num 1193990 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Cushing Tk Farm
Segment Name N-1 Header
Onshore State Abbreviation Ok
Onshore Postal Code 74023
Onshore City Name Cushing
Onshore County Name Lincoln
Designated Location Milepost/valve Station
Designated Name Cushing Tk
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 24
Crossing No
Pipe Facility Type Interstate
Item Involved Tubing
Installation Year 1997
Material Involved Material Other Than Carbon Steel
Material Details Stainless Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 4000
Est Cost Prop Damage 150
Est Cost Emergency 776000
Est Cost Environmental 0
Est Cost Other 0
Prpty 780150
Accident Psig 126
Mop Psig 275
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Controller nor control room were a contributing factor.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Defective Or Loose Tubing Or Fitting
Eq Failure Type Defective Or Loose Tubing Or Fitting
Additional Support Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details Internal & External Pressure & Stresses
Preparer Name L**** W*******
Preparer Email L*********@e****.com
Preparer Telephone 713-381-6748
Prepared Date 2018-05-21 00:00:00
Authorizer Name L**** W*******
Authorizer Telephone 713-381-6748
Authorizer Title Pipeline Compliance Senior Engineer
Authorizer Email L*********@e****.com
Narrative On 10/22/17 at approximately 02:35 local operating personnel discovered crude oil on top of the soil near the n-1 header. All movements were shutdown and remained shutdown until the source could be identified. There are numerous 3rd party delivery points located on this header. At 12:40 operating personnel identified the source of the release to be a compression fitting on the tubing for the sample system. The nrc was immediately notified after confirmed discovery and knowledge of the cost to exceed $50,000. A final report will be submitted once the failure analysis is complete. 5/21/2018 (update): failure analysis states that the leak is attributed to the tubing separating from the coupling underground. The observed mechanical damage to tubing suggests that external mechanical stresses were applied to the tube. It is possible that these stresses loosened the tube, which caused the separation while the tubing was operating.