HL incident on 2017-10-03 — TX

Operator
Enterprise Products Operating Llc
Cause
Excavation Issue
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$150,000
Incident datetime
2017-10-03 11:08
Report number
Location
TX
Narrative
At approximately 1108 hrs on tuesday, october 3, 2017, the controller on the mapl seminole console noticed a pressure drop on the seminole blue line. Seconds later, he received a call from a contractor on site reporting that while doing a line crossing a line was struck and product was releasing. The controller shut down the line and blocked all mov valves in the area. The pipeline was properly located and marked per procedure. Enterprise had a representative on site during the excavation. The contractor failed to maintain proper clearance. The importance of maintaining a proper tolerance zone has been communicated to field personnel. The damaged section of pipe was removed and replaced. The pipeline was restarted on 10/8/17.
Detailed record list
Report Received Date
2017-10-18 00:00:00
Iyear
2017
Report Number
20170340
Supplemental Number
22923
Report Type
Supplemental Final
Operator Id
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-10-03 11:08:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
10000
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2017-10-03 11:08:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-10-03 11:08:00
Restart Datetime
2017-10-08 08:47:00
On Site Datetime
2017-10-03 12:30:00
Nrc Rpt Datetime
2017-10-03 11:27:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Automatic
Num Pub Evacuated
0
Pipe Fac Name
Seminole Mainline
Segment Name
1
Onshore State Abbreviation
Tx
Onshore Postal Code
76953
Onshore City Name
Not Within A Municipality
Onshore County Name
Coke
Designated Location
Milepost/valve Station
Designated Name
Mp178
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
Unknown
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
14
Pipe Wall Thickness
0.25
Pipe Smys
65000
Pipe Specification
Api-5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
American Steel
Pipe Coating Type
Cold Applied Tape
Installation Year
1981
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
3
Puncture Circum
0.5
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
200000
Est Cost Prop Damage
150000
Est Cost Emergency
0
Est Cost Environmental
1500
Est Cost Other
0
Prpty
351500
Accident Psig
1200
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
58080
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller did not initiate any actions which were a contributing factor to the accident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
1777257983
One Call Center Name
811
Locator Type
Contract Locator
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
118
Root Cause Category
Excavation Issue
Root Cause Type
Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name
R****** S* R*****
Preparer Title
Sr. Pipeline Compliance Engineer
Preparer Email
R*******@e****.com
Preparer Telephone
713-381-6841
Prepared Date
2017-12-12 00:00:00
Authorizer Name
R****** S* R*****
Authorizer Telephone
713-381-6841
Authorizer Title
Sr. Pipeline Compliance Engineer
Authorizer Email
R*******@e****.com
Narrative
At approximately 1108 hrs on tuesday, october 3, 2017, the controller on the mapl seminole console noticed a pressure drop on the seminole blue line. Seconds later, he received a call from a contractor on site reporting that while doing a line crossing a line was struck and product was releasing. The controller shut down the line and blocked all mov valves in the area. The pipeline was properly located and marked per procedure. Enterprise had a representative on site during the excavation. The contractor failed to maintain proper clearance. The importance of maintaining a proper tolerance zone has been communicated to field personnel. The damaged section of pipe was removed and replaced. The pipeline was restarted on 10/8/17.
Report Received Date 2017-10-18 00:00:00
Iyear 2017
Report Number 20170340
Supplemental Number 22923
Report Type Supplemental Final
Operator Id 31618 PHMSA Enforcement
Name Enterprise Products Operating Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-10-03 11:08:00
Location Latitude 31.745631 Google Maps OpenStreetMap
Location Longitude -100.268643 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 10000
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime 2017-10-03 11:08:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-10-03 11:08:00
Restart Datetime 2017-10-08 08:47:00
On Site Datetime 2017-10-03 12:30:00
Nrc Rpt Datetime 2017-10-03 11:27:00
Nrc Rpt Num 1192164 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Automatic
Downstream Valve Type Ind Automatic
Num Pub Evacuated 0
Pipe Fac Name Seminole Mainline
Segment Name 1
Onshore State Abbreviation Tx
Onshore Postal Code 76953
Onshore City Name Not Within A Municipality
Onshore County Name Coke
Designated Location Milepost/valve Station
Designated Name Mp178
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover Unknown
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 14
Pipe Wall Thickness 0.25
Pipe Smys 65000
Pipe Specification Api-5l
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer American Steel
Pipe Coating Type Cold Applied Tape
Installation Year 1981
Manufactured Year Unknown
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 3
Puncture Circum 0.5
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 200000
Est Cost Prop Damage 150000
Est Cost Emergency 0
Est Cost Environmental 1500
Est Cost Other 0
Prpty 351500
Accident Psig 1200
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 58080
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The controller did not initiate any actions which were a contributing factor to the accident.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num 1777257983
One Call Center Name 811
Locator Type Contract Locator
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 118
Root Cause Category Excavation Issue
Root Cause Type Excavator Failed To Maintain Clearance After Verifying Marks
Preparer Name R****** S* R*****
Preparer Title Sr. Pipeline Compliance Engineer
Preparer Email R*******@e****.com
Preparer Telephone 713-381-6841
Prepared Date 2017-12-12 00:00:00
Authorizer Name R****** S* R*****
Authorizer Telephone 713-381-6841
Authorizer Title Sr. Pipeline Compliance Engineer
Authorizer Email R*******@e****.com
Narrative At approximately 1108 hrs on tuesday, october 3, 2017, the controller on the mapl seminole console noticed a pressure drop on the seminole blue line. Seconds later, he received a call from a contractor on site reporting that while doing a line crossing a line was struck and product was releasing. The controller shut down the line and blocked all mov valves in the area. The pipeline was properly located and marked per procedure. Enterprise had a representative on site during the excavation. The contractor failed to maintain proper clearance. The importance of maintaining a proper tolerance zone has been communicated to field personnel. The damaged section of pipe was removed and replaced. The pipeline was restarted on 10/8/17.