HL incident on 2017-10-04 — PA
Operator
Buckeye Partners, Lp
Cause
Incorrect Operation
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2017-10-04 16:40
Report number
Location
PA
Narrative
On october 4th, 2017 at 1632, buckeye field operations received high and high/high lima station sump alarms. Local operations responded to the alarms and discovered the station sump overflowing. All pipeline activity in lima station was shut down. The source of the overflow was determined to be a partially open drain valve on the discharge side of a mainline pump, the valve was closed and affected area was assessed. All internal and external notifications were made. The volume is estimated to be 10 barrels of a gas/jet fuel mixture released onto company property. Local resources and osro responded to remediate the affected area.
Detailed record list
Report Received Date
2017-10-17 00:00:00
Iyear
2017
Report Number
20170338
Supplemental Number
22775
Report Type
Supplemental Final
Operator Id
1845
Name
Buckeye Partners, Lp
Operator Street Address
The Buckeye Building 6161 Hamilton Boulevar
Operator City Name
Allentown
Operator State Abbreviation
PA
Operator Postal Code
18106
Local Datetime
2017-10-04 16:40:00
Location Latitude
40.6972223
Location Longitude
-84.1272224
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls
10
Recovered Bbls
10
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2017-10-04 16:40:00
System Part Involved
Onshore Equipment And Piping Associated With Belowground Storage
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-10-04 16:54:00
Restart Datetime
2017-10-05 00:04:00
On Site Datetime
2017-10-04 16:40:00
Nrc Rpt Datetime
2017-10-04 17:20:00
Nrc Rpt Num
1192304
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Lima Station
Segment Name
Terminal Sump Tank
Onshore State Abbreviation
Oh
Onshore Postal Code
45802
Onshore City Name
Lima
Onshore County Name
Allen
Designated Location
Milepost/valve Station
Designated Name
Lima Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Sump
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Overfill Or Overflow
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
1000
Est Cost Prop Damage
0
Est Cost Emergency
40000
Est Cost Environmental
15000
Est Cost Other
0
Prpty
56000
Accident Psig
975
Mop Psig
1140
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
2
Num Employees Failed
0
Cause
Incorrect Operation
Cause Details
Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Operation Type
Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow
Overflow Other Ind
Valve Misalignment
Related Failure Follow Ind
Yes
Category Type
Normal Operating Conditions
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
G***** G*****
Preparer Title
Compliance Specialist
Preparer Email
G******@b******.com
Preparer Telephone
412-716-8250
Preparer Fax
412-264-1433
Prepared Date
2017-11-02 00:00:00
Authorizer Name
C****** P********
Authorizer Telephone
610-904-4113
Authorizer Title
Director Regulatory Compliance
Authorizer Email
C*********@b******.com
Narrative
On october 4th, 2017 at 1632, buckeye field operations received high and high/high lima station sump alarms. Local operations responded to the alarms and discovered the station sump overflowing. All pipeline activity in lima station was shut down. The source of the overflow was determined to be a partially open drain valve on the discharge side of a mainline pump, the valve was closed and affected area was assessed. All internal and external notifications were made. The volume is estimated to be 10 barrels of a gas/jet fuel mixture released onto company property. Local resources and osro responded to remediate the affected area.
| Report Received Date | 2017-10-17 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170338 |
| Supplemental Number | 22775 |
| Report Type | Supplemental Final |
| Operator Id | 1845 PHMSA Enforcement |
| Name | Buckeye Partners, Lp |
| Operator Street Address | The Buckeye Building 6161 Hamilton Boulevar |
| Operator City Name | Allentown |
| Operator State Abbreviation | PA |
| Operator Postal Code | 18106 |
| Local Datetime | 2017-10-04 16:40:00 |
| Location Latitude | 40.6972223 Google Maps OpenStreetMap |
| Location Longitude | -84.1272224 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Mixture Of Refined Products (Transmix Or Other Mixture) |
| Unintentional Release Bbls | 10 |
| Recovered Bbls | 10 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2017-10-04 16:40:00 |
| System Part Involved | Onshore Equipment And Piping Associated With Belowground Storage |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-10-04 16:54:00 |
| Restart Datetime | 2017-10-05 00:04:00 |
| On Site Datetime | 2017-10-04 16:40:00 |
| Nrc Rpt Datetime | 2017-10-04 17:20:00 |
| Nrc Rpt Num | 1192304 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Lima Station |
| Segment Name | Terminal Sump Tank |
| Onshore State Abbreviation | Oh |
| Onshore Postal Code | 45802 |
| Onshore City Name | Lima |
| Onshore County Name | Allen |
| Designated Location | Milepost/valve Station |
| Designated Name | Lima Station |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Tank, Including Attached Appurtenances |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Sump |
| Installation Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Overfill Or Overflow |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1000 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 40000 |
| Est Cost Environmental | 15000 |
| Est Cost Other | 0 |
| Prpty | 56000 |
| Accident Psig | 975 |
| Mop Psig | 1140 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 2 |
| Num Employees Failed | 0 |
| Cause | Incorrect Operation |
| Cause Details | Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow |
| Operation Type | Tank, Vessel, Or Sump/separator Allowed Or Caused To Overfill Or Overflow |
| Overflow Other Ind | Valve Misalignment |
| Related Failure Follow Ind | Yes |
| Category Type | Normal Operating Conditions |
| Operator Qualification Ind | Yes |
| Qualified Individuals | Yes, They Were Qualified For The Task(S) |
| Preparer Name | G***** G***** |
| Preparer Title | Compliance Specialist |
| Preparer Email | G******@b******.com |
| Preparer Telephone | 412-716-8250 |
| Preparer Fax | 412-264-1433 |
| Prepared Date | 2017-11-02 00:00:00 |
| Authorizer Name | C****** P******** |
| Authorizer Telephone | 610-904-4113 |
| Authorizer Title | Director Regulatory Compliance |
| Authorizer Email | C*********@b******.com |
| Narrative | On october 4th, 2017 at 1632, buckeye field operations received high and high/high lima station sump alarms. Local operations responded to the alarms and discovered the station sump overflowing. All pipeline activity in lima station was shut down. The source of the overflow was determined to be a partially open drain valve on the discharge side of a mainline pump, the valve was closed and affected area was assessed. All internal and external notifications were made. The volume is estimated to be 10 barrels of a gas/jet fuel mixture released onto company property. Local resources and osro responded to remediate the affected area. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA