HL incident on 2017-09-14 — TX
Operator
Sunoco Pipeline L.p.
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$500
Incident datetime
2017-09-14 14:18
Report number
Location
TX
Narrative
During a routine facility inspection at approximately 14:30 on 9/14/2017 operations personnel discovered an overflow of approximately one barrel of crude from the sump at the injection station of the east andrews gathering system. Investigation determined that a 1/2" thermal relief valve plumbed to the sump failed open and did not re-seat following actuation which resulted in the overfill. The gathering injection does not run continuously and was not running at the time of the release. The 1/2" relief valve is utilized to relieve thermal pressure between a check valve just downstream of the injection pump and an mov which is opened only when the injection is being started and running. The sump the thermal relief valve is plumbed to is manually activated. The control center does not see the thermal relief valve or the sump via scada. The nearest pressure transmitter that is monitored via scada is located upstream of the injection pump and indicated approximately 70 psi at the estimated time of 5 gallons being released from the sump. All contaminated soil was removed from the site by company personnel. The failed 1/2" thermal relief valve was replaced and the injection was returned to normal service.
Detailed record list
Report Received Date
2017-10-11 00:00:00
Iyear
2017
Report Number
20170333
Supplemental Number
30274
Report Type
Supplemental Final
Operator Id
18718
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-09-14 14:18:00
Location Latitude
32.160741
Location Longitude
-102.633028
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1
Recovered Bbls
1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-09-14 14:18:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Facility Was Not Runnng At The Time Of Discovery.
On Site Datetime
2017-09-14 14:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
East Andrews Gathering Injection
Segment Name
633220-8" Sw40001 Injection
Onshore State Abbreviation
Tx
Onshore Postal Code
79714
Onshore City Name
Andrews
Onshore County Name
Andrews
Designated Location
Survey Station No.
Designated Name
169+70
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Relief Valve
Installation Year
2017
Material Involved
Carbon Steel
Release Type
Overfill Or Overflow
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
45
Est Cost Prop Damage
500
Est Cost Emergency
320
Est Cost Environmental
0
Est Cost Other
0
Prpty
865
Accident Psig
70
Mop Psig
1480
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Gathering
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no contro room actions that contributed to the event. Scada does not capture indications from the thermal relief valve or the sump at this location and the system was not running at the time of the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Relief Valve Did Not Re-Seat Following Actuation
Preparer Name
T*** G* N*******
Preparer Title
Sr. Manager-Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
281-637-6576
Preparer Fax
877-917-0448
Prepared Date
2018-05-03 00:00:00
Authorizer Name
T*** G* N*******
Authorizer Telephone
281-637-6576
Authorizer Title
Sr. Manager-Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
During a routine facility inspection at approximately 14:30 on 9/14/2017 operations personnel discovered an overflow of approximately one barrel of crude from the sump at the injection station of the east andrews gathering system. Investigation determined that a 1/2" thermal relief valve plumbed to the sump failed open and did not re-seat following actuation which resulted in the overfill. The gathering injection does not run continuously and was not running at the time of the release. The 1/2" relief valve is utilized to relieve thermal pressure between a check valve just downstream of the injection pump and an mov which is opened only when the injection is being started and running. The sump the thermal relief valve is plumbed to is manually activated. The control center does not see the thermal relief valve or the sump via scada. The nearest pressure transmitter that is monitored via scada is located upstream of the injection pump and indicated approximately 70 psi at the estimated time of 5 gallons being released from the sump. All contaminated soil was removed from the site by company personnel. The failed 1/2" thermal relief valve was replaced and the injection was returned to normal service.
| Report Received Date | 2017-10-11 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170333 |
| Supplemental Number | 30274 |
| Report Type | Supplemental Final |
| Operator Id | 18718 PHMSA Enforcement |
| Name | Sunoco Pipeline L.p. |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2017-09-14 14:18:00 |
| Location Latitude | 32.160741 Google Maps OpenStreetMap |
| Location Longitude | -102.633028 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1 |
| Recovered Bbls | 1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-09-14 14:18:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Facility Was Not Runnng At The Time Of Discovery. |
| On Site Datetime | 2017-09-14 14:30:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | East Andrews Gathering Injection |
| Segment Name | 633220-8" Sw40001 Injection |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79714 |
| Onshore City Name | Andrews |
| Onshore County Name | Andrews |
| Designated Location | Survey Station No. |
| Designated Name | 169+70 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Relief Valve |
| Installation Year | 2017 |
| Material Involved | Carbon Steel |
| Release Type | Overfill Or Overflow |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 45 |
| Est Cost Prop Damage | 500 |
| Est Cost Emergency | 320 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 865 |
| Accident Psig | 70 |
| Mop Psig | 1480 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Gathering |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | A review of the accident determined that there were no contro room actions that contributed to the event. Scada does not capture indications from the thermal relief valve or the sump at this location and the system was not running at the time of the release. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Relief Valve Ind | Yes |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Relief Valve Did Not Re-Seat Following Actuation |
| Preparer Name | T*** G* N******* |
| Preparer Title | Sr. Manager-Dot Compliance |
| Preparer Email | T************@e*************.com |
| Preparer Telephone | 281-637-6576 |
| Preparer Fax | 877-917-0448 |
| Prepared Date | 2018-05-03 00:00:00 |
| Authorizer Name | T*** G* N******* |
| Authorizer Telephone | 281-637-6576 |
| Authorizer Title | Sr. Manager-Dot Compliance |
| Authorizer Email | T************@e*************.com |
| Narrative | During a routine facility inspection at approximately 14:30 on 9/14/2017 operations personnel discovered an overflow of approximately one barrel of crude from the sump at the injection station of the east andrews gathering system. Investigation determined that a 1/2" thermal relief valve plumbed to the sump failed open and did not re-seat following actuation which resulted in the overfill. The gathering injection does not run continuously and was not running at the time of the release. The 1/2" relief valve is utilized to relieve thermal pressure between a check valve just downstream of the injection pump and an mov which is opened only when the injection is being started and running. The sump the thermal relief valve is plumbed to is manually activated. The control center does not see the thermal relief valve or the sump via scada. The nearest pressure transmitter that is monitored via scada is located upstream of the injection pump and indicated approximately 70 psi at the estimated time of 5 gallons being released from the sump. All contaminated soil was removed from the site by company personnel. The failed 1/2" thermal relief valve was replaced and the injection was returned to normal service. |