HL incident on 2017-09-11 — TX
Operator
Harvest Pipeline Company
Cause
Excavation Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$137,207
Incident datetime
2017-09-11 14:50
Report number
Location
TX
Narrative
The control room recognized a potential problem with the pipeline and shut it in at approximately 14:55. A hpc field operator was notified and sent to investigate the potential leak location. The hpc operator arrived onsite and confirmed there was a leak associated with the pipeline at 15:45 (this is time of discovery). At this time, the field operator was able to confirm / estimate the number of barrels associated with the spill and made the appropriate agency notifications. The rrc was notified at 16:15 and the nrc was then notified at 16:34. The section of pipeline associated with the leak was isolated and the remainder of the system started back up on september 11, 2017 at approximately 18:40. The root cause of this accident was due to miscommunication between subcontractor excel trenching and the contract supervisor midway energy services (both companies contracted by texas american resources to install flowlines in area). Excel and midway were instructed by hpc operator responding to one call tickets to request an hpc representative on site when crossing hpc utilities. Line locate markings were damaged by third party activity on row and excel failed to request the line be relocated. Excel's trencher operator continued trenching into hpc's row without waiting for hpc representative to arrive onsite or re-mark the pipeline. In effort to keep an accident of this type from reoccurring, hpc will continue to monitor the pipeline row's and stress to contractors and other stakeholders the importance of contacting operators when working in and/or near their pipeline row's.
Detailed record list
Report Received Date
2017-10-03 00:00:00
Iyear
2017
Report Number
20170324
Supplemental Number
30377
Report Type
Supplemental Final
Operator Id
30782
Name
Harvest Pipeline Company
Operator Street Address
1111 Travis
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-09-11 14:50:00
Location Latitude
28.654717
Location Longitude
-99.038606
Commodity Released Type
Crude Oil
Unintentional Release Bbls
95
Recovered Bbls
95
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Controller
Operator Type
Operator Employee
Incident Identified Datetime
2017-09-11 14:50:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-09-11 14:55:00
Restart Datetime
2017-09-14 11:30:00
On Site Datetime
2017-09-11 15:45:00
Nrc Rpt Datetime
2017-09-11 16:34:00
Nrc Rpt Num
1189953
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Row (Closest Location Is Stonegate Tie-In)
Segment Name
Pearsall System
Onshore State Abbreviation
Tx
Onshore Postal Code
78017
Onshore City Name
Dilley
Onshore County Name
Frio
Designated Location
Survey Station No.
Designated Name
Row
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
39
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Pipe Wall Thickness
0.188
Pipe Smys
60000
Pipe Specification
Api 5lx
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Other
Pipe Coating Details
Polyken Tape Coating
Installation Year
1990
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
12
Puncture Circum
12
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1000
Est Cost Prop Damage
137207
Est Cost Emergency
30775
Est Cost Environmental
35785
Est Cost Other
0
Prpty
204767
Accident Psig
457
Mop Psig
780
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
114945
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The control room identified a problem and shut in the pipeline prior to an operator getting to the site to investigate. The accident was caused by a 3rd party trenching through the pipeline row.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
Yes
One Call System Ind
Yes
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Trencher
Work Performed
Unknown/other
One Call Notified Ind
Yes
One Call Ticket Num
1774392040
One Call Center Name
Texas 811
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
4
Root Cause Category
Excavation Issue
Root Cause Type
Improper Backfilling Practices
Preparer Name
T*** S* B****
Preparer Title
Regulatory Compliance Specialist
Preparer Email
T******@h******.com
Preparer Telephone
713.289.2688
Prepared Date
2018-05-23 00:00:00
Authorizer Name
S****** W*******
Authorizer Telephone
(713) 289-2847
Authorizer Title
Integrity And Compliance Manager
Authorizer Email
S********@h******.com
Narrative
The control room recognized a potential problem with the pipeline and shut it in at approximately 14:55. A hpc field operator was notified and sent to investigate the potential leak location. The hpc operator arrived onsite and confirmed there was a leak associated with the pipeline at 15:45 (this is time of discovery). At this time, the field operator was able to confirm / estimate the number of barrels associated with the spill and made the appropriate agency notifications. The rrc was notified at 16:15 and the nrc was then notified at 16:34. The section of pipeline associated with the leak was isolated and the remainder of the system started back up on september 11, 2017 at approximately 18:40. The root cause of this accident was due to miscommunication between subcontractor excel trenching and the contract supervisor midway energy services (both companies contracted by texas american resources to install flowlines in area). Excel and midway were instructed by hpc operator responding to one call tickets to request an hpc representative on site when crossing hpc utilities. Line locate markings were damaged by third party activity on row and excel failed to request the line be relocated. Excel's trencher operator continued trenching into hpc's row without waiting for hpc representative to arrive onsite or re-mark the pipeline. In effort to keep an accident of this type from reoccurring, hpc will continue to monitor the pipeline row's and stress to contractors and other stakeholders the importance of contacting operators when working in and/or near their pipeline row's.
| Report Received Date | 2017-10-03 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170324 |
| Supplemental Number | 30377 |
| Report Type | Supplemental Final |
| Operator Id | 30782 PHMSA Enforcement |
| Name | Harvest Pipeline Company |
| Operator Street Address | 1111 Travis |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2017-09-11 14:50:00 |
| Location Latitude | 28.654717 Google Maps OpenStreetMap |
| Location Longitude | -99.038606 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 95 |
| Recovered Bbls | 95 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Controller |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-09-11 14:50:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-09-11 14:55:00 |
| Restart Datetime | 2017-09-14 11:30:00 |
| On Site Datetime | 2017-09-11 15:45:00 |
| Nrc Rpt Datetime | 2017-09-11 16:34:00 |
| Nrc Rpt Num | 1189953 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Row (Closest Location Is Stonegate Tie-In) |
| Segment Name | Pearsall System |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 78017 |
| Onshore City Name | Dilley |
| Onshore County Name | Frio |
| Designated Location | Survey Station No. |
| Designated Name | Row |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 39 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 10 |
| Pipe Wall Thickness | 0.188 |
| Pipe Smys | 60000 |
| Pipe Specification | Api 5lx |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Other |
| Pipe Coating Details | Polyken Tape Coating |
| Installation Year | 1990 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Mechanical Puncture |
| Puncture Axial | 12 |
| Puncture Circum | 12 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1000 |
| Est Cost Prop Damage | 137207 |
| Est Cost Emergency | 30775 |
| Est Cost Environmental | 35785 |
| Est Cost Other | 0 |
| Prpty | 204767 |
| Accident Psig | 457 |
| Mop Psig | 780 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 114945 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The control room identified a problem and shut in the pipeline prior to an operator getting to the site to investigate. The accident was caused by a 3rd party trenching through the pipeline row. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | Yes |
| One Call System Ind | Yes |
| Notify Cga Dirt | No |
| Pipeline Easement Row Ind | Yes |
| Excavator Type | Contractor |
| Excavator Equipment | Trencher |
| Work Performed | Unknown/other |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 1774392040 |
| One Call Center Name | Texas 811 |
| Locator Type | Utility Owner |
| Visible Marks | Yes |
| Service Interruption | Yes |
| Service Interruption Hours | 4 |
| Root Cause Category | Excavation Issue |
| Root Cause Type | Improper Backfilling Practices |
| Preparer Name | T*** S* B**** |
| Preparer Title | Regulatory Compliance Specialist |
| Preparer Email | T******@h******.com |
| Preparer Telephone | 713.289.2688 |
| Prepared Date | 2018-05-23 00:00:00 |
| Authorizer Name | S****** W******* |
| Authorizer Telephone | (713) 289-2847 |
| Authorizer Title | Integrity And Compliance Manager |
| Authorizer Email | S********@h******.com |
| Narrative | The control room recognized a potential problem with the pipeline and shut it in at approximately 14:55. A hpc field operator was notified and sent to investigate the potential leak location. The hpc operator arrived onsite and confirmed there was a leak associated with the pipeline at 15:45 (this is time of discovery). At this time, the field operator was able to confirm / estimate the number of barrels associated with the spill and made the appropriate agency notifications. The rrc was notified at 16:15 and the nrc was then notified at 16:34. The section of pipeline associated with the leak was isolated and the remainder of the system started back up on september 11, 2017 at approximately 18:40. The root cause of this accident was due to miscommunication between subcontractor excel trenching and the contract supervisor midway energy services (both companies contracted by texas american resources to install flowlines in area). Excel and midway were instructed by hpc operator responding to one call tickets to request an hpc representative on site when crossing hpc utilities. Line locate markings were damaged by third party activity on row and excel failed to request the line be relocated. Excel's trencher operator continued trenching into hpc's row without waiting for hpc representative to arrive onsite or re-mark the pipeline. In effort to keep an accident of this type from reoccurring, hpc will continue to monitor the pipeline row's and stress to contractors and other stakeholders the importance of contacting operators when working in and/or near their pipeline row's. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA