HL incident on 2017-07-31 — TX

Operator
Sunoco Pipeline L.p.
Cause
Other Outside Force Damage
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$110,000
Incident datetime
2017-07-31 11:21
Report number
Location
TX
Narrative
On 7/31/17 at approximately 11:21am the pipeline control center noted a decrease in pressure and associated alarms on the 10" goodrich to douglass segment of the kilgore to oti pipeline. The pipeline was immediately shutdown and field personnel notified to investigate. At approximately 11:41am the control center received a call from 2nd party contractor that was performing row mowing indicating that one of the mowers had struck the line in a shallow/exposed area and there was a release of crude oil. At approximately 12:30pm operator personnel arrived on site and determined that there was a release of crude oil and that the cost of cleanup and repairs would likely exceed $50k. Nrc was notified at 13:26 and the release was assigned report no. 1185799. A plidco mechanical clamp was installed over the failure. Follow up 48hr nrc report was filed on 8/2/17 at 13:06 and assigned report no. 1186040. Once temporary repairs were completed a static pressure test was accomplished prior to restart on 8/3/17. All free product was recovered and impacted soil was remediated on-site. Permanent repair has been accomplished via cut out and replacement and line was provided 36" of cover to aid in prevention of future recurrence.
Detailed record list
Report Received Date
2017-09-01 00:00:00
Iyear
2017
Report Number
20170272
Supplemental Number
30285
Report Type
Supplemental Final
Operator Id
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-07-31 11:21:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
600
Recovered Bbls
500
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2017-07-31 11:21:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-07-31 11:23:00
Restart Datetime
2017-08-03 08:00:00
On Site Datetime
2017-07-31 12:30:00
Nrc Rpt Datetime
2017-07-31 13:26:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
10" Kilgore To Oti
Segment Name
21004 - 10" Kilgore To Oti
Onshore State Abbreviation
Tx
Onshore Postal Code
75969
Onshore City Name
Pollak
Onshore County Name
Angelina
Designated Location
Survey Station No.
Designated Name
3887+98
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
Unknown
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Pipe Wall Thickness
0.25
Pipe Smys
35000
Pipe Specification
Api 5l
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1932
Manufactured Year
1932
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
3
Puncture Circum
0.5
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
2178000
Est Cost Gas Released
4766
Est Cost Prop Damage
110000
Est Cost Emergency
363650
Est Cost Environmental
2200000
Est Cost Other
0
Prpty
4856416
Accident Psig
400
Mop Psig
800
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
90754
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
Yes
Num Contractors Tested
1
Num Contractors Failed
0
Cause
Other Outside Force Damage
Cause Details
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Outside Force Type
Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Vehicle Subtype
Operator's Contractor
Preparer Name
T*** N*******
Preparer Title
Sr. Manager - Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
281-637-6576
Preparer Fax
877-917-0448
Prepared Date
2018-05-06 00:00:00
Authorizer Name
T*** N*******
Authorizer Telephone
281-637-6576
Authorizer Title
Sr. Manager - Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
On 7/31/17 at approximately 11:21am the pipeline control center noted a decrease in pressure and associated alarms on the 10" goodrich to douglass segment of the kilgore to oti pipeline. The pipeline was immediately shutdown and field personnel notified to investigate. At approximately 11:41am the control center received a call from 2nd party contractor that was performing row mowing indicating that one of the mowers had struck the line in a shallow/exposed area and there was a release of crude oil. At approximately 12:30pm operator personnel arrived on site and determined that there was a release of crude oil and that the cost of cleanup and repairs would likely exceed $50k. Nrc was notified at 13:26 and the release was assigned report no. 1185799. A plidco mechanical clamp was installed over the failure. Follow up 48hr nrc report was filed on 8/2/17 at 13:06 and assigned report no. 1186040. Once temporary repairs were completed a static pressure test was accomplished prior to restart on 8/3/17. All free product was recovered and impacted soil was remediated on-site. Permanent repair has been accomplished via cut out and replacement and line was provided 36" of cover to aid in prevention of future recurrence.
Report Received Date 2017-09-01 00:00:00
Iyear 2017
Report Number 20170272
Supplemental Number 30285
Report Type Supplemental Final
Operator Id 18718 PHMSA Enforcement
Name Sunoco Pipeline L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-07-31 11:21:00
Location Latitude 31.391791 Google Maps OpenStreetMap
Location Longitude -94.921067 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 600
Recovered Bbls 500
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime 2017-07-31 11:21:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-07-31 11:23:00
Restart Datetime 2017-08-03 08:00:00
On Site Datetime 2017-07-31 12:30:00
Nrc Rpt Datetime 2017-07-31 13:26:00
Nrc Rpt Num 1185799 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name 10" Kilgore To Oti
Segment Name 21004 - 10" Kilgore To Oti
Onshore State Abbreviation Tx
Onshore Postal Code 75969
Onshore City Name Pollak
Onshore County Name Angelina
Designated Location Survey Station No.
Designated Name 3887+98
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover Unknown
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 10
Pipe Wall Thickness 0.25
Pipe Smys 35000
Pipe Specification Api 5l
Pipe Seam Type Seamless
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Installation Year 1932
Manufactured Year 1932
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 3
Puncture Circum 0.5
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 2178000
Est Cost Gas Released 4766
Est Cost Prop Damage 110000
Est Cost Emergency 363650
Est Cost Environmental 2200000
Est Cost Other 0
Prpty 4856416
Accident Psig 400
Mop Psig 800
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 90754
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind No
Contractor Drug Test Ind Yes
Num Contractors Tested 1
Num Contractors Failed 0
Cause Other Outside Force Damage
Cause Details Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Outside Force Type Damage By Car, Truck, Or Other Motorized Vehicle/equipment Not Engaged In Excavation
Vehicle Subtype Operator's Contractor
Preparer Name T*** N*******
Preparer Title Sr. Manager - Dot Compliance
Preparer Email T************@e*************.com
Preparer Telephone 281-637-6576
Preparer Fax 877-917-0448
Prepared Date 2018-05-06 00:00:00
Authorizer Name T*** N*******
Authorizer Telephone 281-637-6576
Authorizer Title Sr. Manager - Dot Compliance
Authorizer Email T************@e*************.com
Narrative On 7/31/17 at approximately 11:21am the pipeline control center noted a decrease in pressure and associated alarms on the 10" goodrich to douglass segment of the kilgore to oti pipeline. The pipeline was immediately shutdown and field personnel notified to investigate. At approximately 11:41am the control center received a call from 2nd party contractor that was performing row mowing indicating that one of the mowers had struck the line in a shallow/exposed area and there was a release of crude oil. At approximately 12:30pm operator personnel arrived on site and determined that there was a release of crude oil and that the cost of cleanup and repairs would likely exceed $50k. Nrc was notified at 13:26 and the release was assigned report no. 1185799. A plidco mechanical clamp was installed over the failure. Follow up 48hr nrc report was filed on 8/2/17 at 13:06 and assigned report no. 1186040. Once temporary repairs were completed a static pressure test was accomplished prior to restart on 8/3/17. All free product was recovered and impacted soil was remediated on-site. Permanent repair has been accomplished via cut out and replacement and line was provided 36" of cover to aid in prevention of future recurrence.