HL incident on 2017-07-13 — WY

Operator
Belle Fourche Pipeline Co
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$5,000
Incident datetime
2017-07-13 11:00
Report number
Location
WY
Narrative
The tank mixer bearing failed which caused the shaft to become out of alignment. This misalignment caused excessive vibrations and caused the seal to fail.
Detailed record list
Report Received Date
2017-08-11 00:00:00
Iyear
2017
Report Number
20170244
Supplemental Number
22541
Report Type
Original Final
Operator Id
Name
Belle Fourche Pipeline Co
Operator Street Address
455 N Poplar St.
Operator City Name
Casper
Operator State Abbreviation
WY
Operator Postal Code
82602
Local Datetime
2017-07-13 11:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-07-13 11:00:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-07-13 13:00:00
Restart Datetime
2017-07-13 20:00:00
On Site Datetime
2017-07-13 11:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Alexander Station
Segment Name
Alex Tank
Onshore State Abbreviation
Nd
Onshore Postal Code
58831
Onshore City Name
Not Within A Municipality
Onshore County Name
Mckenzie
Designated Location
Milepost/valve Station
Designated Name
Mp0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Tank Type
Atmospheric
Item Involved Details
Tank Mixer
Installation Year
2008
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
110
Est Cost Prop Damage
5000
Est Cost Emergency
0
Est Cost Environmental
10000
Est Cost Other
0
Prpty
15110
Accident Psig
7
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The mixer at the facility is not monitored by the control center.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Seal (Not Pump Seal) Or Packing
Additional Vibration Ind
Yes
Preparer Name
J**** C* R*********
Preparer Title
Dot Compliance Coordinator
Preparer Email
J***************@t******.com
Preparer Telephone
3072660250
Prepared Date
2017-08-07 00:00:00
Authorizer Name
J**** C* R*********
Authorizer Telephone
3072660250
Authorizer Title
Dot Compliance Coordinator
Authorizer Email
J***************@t******.com
Narrative
The tank mixer bearing failed which caused the shaft to become out of alignment. This misalignment caused excessive vibrations and caused the seal to fail.
Report Received Date 2017-08-11 00:00:00
Iyear 2017
Report Number 20170244
Supplemental Number 22541
Report Type Original Final
Operator Id 1248 PHMSA Enforcement
Name Belle Fourche Pipeline Co
Operator Street Address 455 N Poplar St.
Operator City Name Casper
Operator State Abbreviation WY
Operator Postal Code 82602
Local Datetime 2017-07-13 11:00:00
Location Latitude 47.9792 Google Maps OpenStreetMap
Location Longitude -103.667767 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 2
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2017-07-13 11:00:00
System Part Involved Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-07-13 13:00:00
Restart Datetime 2017-07-13 20:00:00
On Site Datetime 2017-07-13 11:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Alexander Station
Segment Name Alex Tank
Onshore State Abbreviation Nd
Onshore Postal Code 58831
Onshore City Name Not Within A Municipality
Onshore County Name Mckenzie
Designated Location Milepost/valve Station
Designated Name Mp0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Tank, Including Attached Appurtenances
Crossing No
Pipe Facility Type Interstate
Item Involved Other
Tank Type Atmospheric
Item Involved Details Tank Mixer
Installation Year 2008
Material Involved Carbon Steel
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 110
Est Cost Prop Damage 5000
Est Cost Emergency 0
Est Cost Environmental 10000
Est Cost Other 0
Prpty 15110
Accident Psig 7
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The mixer at the facility is not monitored by the control center.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind Seal (Not Pump Seal) Or Packing
Additional Vibration Ind Yes
Preparer Name J**** C* R*********
Preparer Title Dot Compliance Coordinator
Preparer Email J***************@t******.com
Preparer Telephone 3072660250
Prepared Date 2017-08-07 00:00:00
Authorizer Name J**** C* R*********
Authorizer Telephone 3072660250
Authorizer Title Dot Compliance Coordinator
Authorizer Email J***************@t******.com
Narrative The tank mixer bearing failed which caused the shaft to become out of alignment. This misalignment caused excessive vibrations and caused the seal to fail.

All rights reserved. Copyright © by ClearPHMSA