HL incident on 2017-07-13 — OK

Operator
Magellan Crude Oil Pipeline Company, L.p.
Cause
Excavation Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$184,000
Incident datetime
2017-07-13 08:33
Report number
Location
OK
Narrative
On 7/13/17, magellan's contractor was performing excavation on the east houston to el paso 18" line section at mp 141.8. The contractor's excavation equipment made contact with a mainline pipe tap causing a release. The pipeline was active at the time of the event. Operations control issued a code red based on a call from field personnel saying the contractor struck the pipeline. Psap (public access safety point) and nrc were notified. The nrc report number is 1183933. Hwy 20 was closed during the incident. Within 3/4 mile radius of the incident, 14 families were evacuated and 1 sheltered in place. Evacuees were allowed to return to their homes the same evening. Records indicate the mainline pipe tap was installed prior to 1995. The section of the pipe that included the pipe tap was cut out and replaced with a pre-tested piece of pipe. Future preventative actions including obtaining smart pig data to identify potential buried pipeline appurtenances and reviewing this data with excavation personnel prior to beginning work. Accident response consists of only long term remediation and is under the response action plan submitted to the texas railroad commission. 48-hour nrc update: #1184112, 7/14/2017 17:02 supplemental/final updates(06/17/2019): parts a11, d8e, d8g and part h narrative
Detailed record list
Report Received Date
2017-08-11 00:00:00
Iyear
2017
Report Number
20170243
Supplemental Number
32290
Report Type
Supplemental Final
Operator Id
Name
Magellan Crude Oil Pipeline Company, L.p.
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2017-07-13 08:33:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2084
Recovered Bbls
1734
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2017-07-13 08:33:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-07-13 08:33:00
Restart Datetime
2017-07-16 07:53:00
On Site Datetime
2017-07-13 08:34:00
Nrc Rpt Datetime
2017-07-13 09:05:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
15
Pipe Fac Name
East Houston -El Paso 18"
Segment Name
Line Id 6645
Onshore State Abbreviation
Tx
Onshore Postal Code
78602
Onshore City Name
Not Within A Municipality
Onshore County Name
Bastrop
Designated Location
Milepost/valve Station
Designated Name
141.81
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
30
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
5500
Est Cost Gas Released
104200
Est Cost Prop Damage
184000
Est Cost Emergency
1257500
Est Cost Environmental
3849646
Est Cost Other
0
Prpty
5400846
Accident Psig
64
Mop Psig
965
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
34110
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pipeline was operating normally when the controller received a call from a field employee notifying of what had occurred. Controller responded immediately, shutting down pipeline in advance of associated alarming. As such, determination was made via review that controller did not cause or contribute to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
Yes
Num Contractors Tested
3
Num Contractors Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Liquid Pipeline
One Call Notified Ind
Yes
One Call Ticket Num
1768641807
One Call Center Name
Texas 811
Locator Type
Contract Locator
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
72
Root Cause Category
Excavation Issue
Root Cause Type
Improper Backfilling Practices
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
9185747327
Preparer Fax
9185747376
Prepared Date
2019-06-17 00:00:00
Authorizer Name
S**** H******
Authorizer Telephone
918-574-7173
Authorizer Title
Supervisor Integrity Management
Authorizer Email
S************@m*********.com
Narrative
On 7/13/17, magellan's contractor was performing excavation on the east houston to el paso 18" line section at mp 141.8. The contractor's excavation equipment made contact with a mainline pipe tap causing a release. The pipeline was active at the time of the event. Operations control issued a code red based on a call from field personnel saying the contractor struck the pipeline. Psap (public access safety point) and nrc were notified. The nrc report number is 1183933. Hwy 20 was closed during the incident. Within 3/4 mile radius of the incident, 14 families were evacuated and 1 sheltered in place. Evacuees were allowed to return to their homes the same evening. Records indicate the mainline pipe tap was installed prior to 1995. The section of the pipe that included the pipe tap was cut out and replaced with a pre-tested piece of pipe. Future preventative actions including obtaining smart pig data to identify potential buried pipeline appurtenances and reviewing this data with excavation personnel prior to beginning work. Accident response consists of only long term remediation and is under the response action plan submitted to the texas railroad commission. 48-hour nrc update: #1184112, 7/14/2017 17:02 supplemental/final updates(06/17/2019): parts a11, d8e, d8g and part h narrative
Report Received Date 2017-08-11 00:00:00
Iyear 2017
Report Number 20170243
Supplemental Number 32290
Report Type Supplemental Final
Operator Id 39504 PHMSA Enforcement
Name Magellan Crude Oil Pipeline Company, L.p.
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2017-07-13 08:33:00
Location Latitude 30.085836 Google Maps OpenStreetMap
Location Longitude -97.386029 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 2084
Recovered Bbls 1734
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2017-07-13 08:33:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-07-13 08:33:00
Restart Datetime 2017-07-16 07:53:00
On Site Datetime 2017-07-13 08:34:00
Nrc Rpt Datetime 2017-07-13 09:05:00
Nrc Rpt Num 1183933 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 15
Pipe Fac Name East Houston -El Paso 18"
Segment Name Line Id 6645
Onshore State Abbreviation Tx
Onshore Postal Code 78602
Onshore City Name Not Within A Municipality
Onshore County Name Bastrop
Designated Location Milepost/valve Station
Designated Name 141.81
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Exposed Due To Excavation
Depth Of Cover 30
Crossing No
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year Unknown
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment Yes
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 5500
Est Cost Gas Released 104200
Est Cost Prop Damage 184000
Est Cost Emergency 1257500
Est Cost Environmental 3849646
Est Cost Other 0
Prpty 5400846
Accident Psig 64
Mop Psig 965
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 34110
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Pipeline was operating normally when the controller received a call from a field employee notifying of what had occurred. Controller responded immediately, shutting down pipeline in advance of associated alarming. As such, determination was made via review that controller did not cause or contribute to the event.
Employee Drug Test Ind No
Contractor Drug Test Ind Yes
Num Contractors Tested 3
Num Contractors Failed 0
Cause Excavation Damage
Cause Details Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Liquid Pipeline
One Call Notified Ind Yes
One Call Ticket Num 1768641807
One Call Center Name Texas 811
Locator Type Contract Locator
Visible Marks No
Service Interruption Yes
Service Interruption Hours 72
Root Cause Category Excavation Issue
Root Cause Type Improper Backfilling Practices
Preparer Name S****** L******
Preparer Title Ai Analyst
Preparer Email S**************@m*********.com
Preparer Telephone 9185747327
Preparer Fax 9185747376
Prepared Date 2019-06-17 00:00:00
Authorizer Name S**** H******
Authorizer Telephone 918-574-7173
Authorizer Title Supervisor Integrity Management
Authorizer Email S************@m*********.com
Narrative On 7/13/17, magellan's contractor was performing excavation on the east houston to el paso 18" line section at mp 141.8. The contractor's excavation equipment made contact with a mainline pipe tap causing a release. The pipeline was active at the time of the event. Operations control issued a code red based on a call from field personnel saying the contractor struck the pipeline. Psap (public access safety point) and nrc were notified. The nrc report number is 1183933. Hwy 20 was closed during the incident. Within 3/4 mile radius of the incident, 14 families were evacuated and 1 sheltered in place. Evacuees were allowed to return to their homes the same evening. Records indicate the mainline pipe tap was installed prior to 1995. The section of the pipe that included the pipe tap was cut out and replaced with a pre-tested piece of pipe. Future preventative actions including obtaining smart pig data to identify potential buried pipeline appurtenances and reviewing this data with excavation personnel prior to beginning work. Accident response consists of only long term remediation and is under the response action plan submitted to the texas railroad commission. 48-hour nrc update: #1184112, 7/14/2017 17:02 supplemental/final updates(06/17/2019): parts a11, d8e, d8g and part h narrative