HL incident on 2017-07-09 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Other Accident Cause
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$315,000
Incident datetime
2017-07-09 07:00
Report number
Location
TX
Narrative
On 07-09-2017 at approximately 07:00 enterprise operations was notified of crude oil on the ground inside of valero's facility. Operating personnel were dispatched to the area to start the investigation into the source. Enterprise has a delivery skid located inside valero's facility which was not making a movement at the time of discovery. In the area that the crude was discovered valero has many facility lines that run to and from different points within their facility. At approximately 1100 hours on the 9th it was determined that the source of the leak was on an enterprise asset and not valero. At that time the nrc notification was immediately made resulting in report number 1183549. The 48 hr update was completed on 07-10-17 resulting in report number 1183669. A c-scan of the piping was conducted to determine if internal corrosion was the cause of the release. After reviewing the results of the scan, internal corrosion was ruled out due to the fact that there were no indications of wall loss other than the pinhole. A visual examination of the piping also ruled out external corrosion. A type b sleeve was approved and welded onto the pipe as the permanent repair. Update (9/28/2018): no deliveries were being made at the time of the leak and there was no interruption of service to customers. Pressure at the time of the leak was approximately 2 psi.
Detailed record list
Report Received Date
2017-08-07 00:00:00
Iyear
2017
Report Number
20170238
Supplemental Number
30990
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-07-09 07:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
15
Recovered Bbls
15
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Notification From Third Party Operator
Incident Identified Datetime
2017-07-09 07:00:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line Was Already Down
On Site Datetime
2017-07-09 08:00:00
Nrc Rpt Datetime
2017-07-09 11:21:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
S17
Segment Name
S17 Valero Jct.
Onshore State Abbreviation
Tx
Onshore Postal Code
77590
Onshore City Name
Texas City
Onshore County Name
Galveston
Designated Location
Milepost/valve Station
Designated Name
Valero Jct.
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
144
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
24
Pipe Wall Thickness
0.5
Pipe Smys
35000
Pipe Specification
Api-5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
2014
Manufactured Year
2014
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
315000
Est Cost Emergency
160000
Est Cost Environmental
0
Est Cost Other
0
Prpty
475000
Accident Psig
2
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller nor control room were a contributing factor
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Accident Cause
Cause Details
Unknown
Other Type
Unknown
Unknown Subtype
Investigation Complete, Cause Of Accident Unknown
Preparer Name
L**** W*******
Preparer Title
Pipeline Compliance Senior Engineer
Preparer Email
L*********@e****.com
Preparer Telephone
713-381-6748
Prepared Date
2018-09-28 00:00:00
Authorizer Name
L**** W*******
Authorizer Telephone
713-381-6748
Authorizer Title
Pipeline Compliance Senior Engineer
Authorizer Email
L*********@e****.com
Narrative
On 07-09-2017 at approximately 07:00 enterprise operations was notified of crude oil on the ground inside of valero's facility. Operating personnel were dispatched to the area to start the investigation into the source. Enterprise has a delivery skid located inside valero's facility which was not making a movement at the time of discovery. In the area that the crude was discovered valero has many facility lines that run to and from different points within their facility. At approximately 1100 hours on the 9th it was determined that the source of the leak was on an enterprise asset and not valero. At that time the nrc notification was immediately made resulting in report number 1183549. The 48 hr update was completed on 07-10-17 resulting in report number 1183669. A c-scan of the piping was conducted to determine if internal corrosion was the cause of the release. After reviewing the results of the scan, internal corrosion was ruled out due to the fact that there were no indications of wall loss other than the pinhole. A visual examination of the piping also ruled out external corrosion. A type b sleeve was approved and welded onto the pipe as the permanent repair. Update (9/28/2018): no deliveries were being made at the time of the leak and there was no interruption of service to customers. Pressure at the time of the leak was approximately 2 psi.
Report Received Date 2017-08-07 00:00:00
Iyear 2017
Report Number 20170238
Supplemental Number 30990
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-07-09 07:00:00
Location Latitude 29.3652167 Google Maps OpenStreetMap
Location Longitude -94.9163583 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 15
Recovered Bbls 15
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Notification From Third Party Operator
Incident Identified Datetime 2017-07-09 07:00:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Line Was Already Down
On Site Datetime 2017-07-09 08:00:00
Nrc Rpt Datetime 2017-07-09 11:21:00
Nrc Rpt Num 1183549 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name S17
Segment Name S17 Valero Jct.
Onshore State Abbreviation Tx
Onshore Postal Code 77590
Onshore City Name Texas City
Onshore County Name Galveston
Designated Location Milepost/valve Station
Designated Name Valero Jct.
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 144
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 24
Pipe Wall Thickness 0.5
Pipe Smys 35000
Pipe Specification Api-5l
Pipe Seam Type Erw - High Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Installation Year 2014
Manufactured Year 2014
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Usa Drinking Ind Yes
Usa Drinking Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 315000
Est Cost Emergency 160000
Est Cost Environmental 0
Est Cost Other 0
Prpty 475000
Accident Psig 2
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Controller nor control room were a contributing factor
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Accident Cause
Cause Details Unknown
Other Type Unknown
Unknown Subtype Investigation Complete, Cause Of Accident Unknown
Preparer Name L**** W*******
Preparer Title Pipeline Compliance Senior Engineer
Preparer Email L*********@e****.com
Preparer Telephone 713-381-6748
Prepared Date 2018-09-28 00:00:00
Authorizer Name L**** W*******
Authorizer Telephone 713-381-6748
Authorizer Title Pipeline Compliance Senior Engineer
Authorizer Email L*********@e****.com
Narrative On 07-09-2017 at approximately 07:00 enterprise operations was notified of crude oil on the ground inside of valero's facility. Operating personnel were dispatched to the area to start the investigation into the source. Enterprise has a delivery skid located inside valero's facility which was not making a movement at the time of discovery. In the area that the crude was discovered valero has many facility lines that run to and from different points within their facility. At approximately 1100 hours on the 9th it was determined that the source of the leak was on an enterprise asset and not valero. At that time the nrc notification was immediately made resulting in report number 1183549. The 48 hr update was completed on 07-10-17 resulting in report number 1183669. A c-scan of the piping was conducted to determine if internal corrosion was the cause of the release. After reviewing the results of the scan, internal corrosion was ruled out due to the fact that there were no indications of wall loss other than the pinhole. A visual examination of the piping also ruled out external corrosion. A type b sleeve was approved and welded onto the pipe as the permanent repair. Update (9/28/2018): no deliveries were being made at the time of the leak and there was no interruption of service to customers. Pressure at the time of the leak was approximately 2 psi.