HL incident on 2017-07-05 — TX
Operator
Motiva Enterprise Llc
Cause
Corrosion Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$2,414
Incident datetime
2017-07-05 16:00
Report number
Location
TX
Narrative
The 5-6 line which transports finished lube products from the motiva port arthur refinery to the motiva port arthur marine terminal, was discovered to be leaking on july 5, 2017. As a result, the line was excavated for inspection and repair. Failure was observed along the longitudinal axis of the pipe in one area, measured to be approximate 17 inches long. Cross section of pipe containing the failure was submitted to an independent metallurgical testing lab for analysis. Based on extensive examination, the conclusion was made that in most likelihood, failure was the result of ductile fracture along a non-optimal erw seam. The failure onset was facilitated by: 1. Intermittent patches of lack of fusion along the erw joint and 2. Significant od surface wall loss due to preferential corrosion along the side of the pipe corresponding to the erw. It is suspected that the out of service, blocked in line over-pressured due to thermal expansion but exact failure pressure could not be determined through the failure analysis.
Detailed record list
Report Received Date
2017-08-03 00:00:00
Iyear
2017
Report Number
20170234
Supplemental Number
30174
Report Type
Supplemental Final
Operator Id
30777
Name
Motiva Enterprise Llc
Operator Street Address
One Allen Center 500 Dallas Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-07-05 16:00:00
Location Latitude
29.873832
Location Longitude
-93.957803
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Other
Commodity Details
Lube Oil - Star 12
Unintentional Release Bbls
0.62
Recovered Bbls
0.6
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2017-07-05 16:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-07-05 16:00:00
Restart Datetime
2017-10-18 17:00:00
On Site Datetime
2017-07-05 16:00:00
Nrc Rpt Datetime
2017-07-05 17:15:00
Nrc Rpt Num
1183189
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
5-6 Lube Line
Segment Name
5-6 Lube Line
Onshore State Abbreviation
Tx
Onshore Postal Code
77640
Onshore City Name
Port Arthur
Onshore County Name
Jefferson County
Designated Location
Milepost/valve Station
Designated Name
West Gate
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
6
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
6
Pipe Wall Thickness
0.28
Pipe Smys
24000
Pipe Specification
Grade B
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1952
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
1.5
Rupture Length
17
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
2
Est Cost Prop Damage
2414
Est Cost Emergency
0
Est Cost Environmental
12500
Est Cost Other
0
Est Cost Other Details
Emergency Response Was Handled Internally By The Motiva Emergency Response Team
Prpty
14916
Accident Psig
0
Mop Psig
400
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
10150
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Line was not in service at the time of the incident, the line was blocked in.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
General Corrosion
Selective Seam Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Metallurgical Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
Unknown
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2016
Prior Damage
No
Collected Data Ind
Yes
Geometry Deformation Ind
Yes
Other Tool Tech Ind
Yes
Geometry Recent Year
2015
Other Tool
Ili
Other Recent Year
2015
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2011
Hydrtst Most Rcnt Pressure
600
Direct Asmnt Conducted
Yes, But The Point Of The Accident Was Not Identified As A Dig Site
Direct Asmnt Pnt Not Idntf Yr
2015
Non Destructive Exam Ind
Yes
Exm Other Type
Ili
Exm Other Rcnt Year
2015
Exm Other Rcnt Ind
Yes
Preparer Name
E******** R**
Preparer Title
Dot Compliance Specialist
Preparer Email
E************@m*****.com
Preparer Telephone
409-989-7150
Prepared Date
2018-04-09 00:00:00
Authorizer Name
G*** L*******
Authorizer Telephone
409-989-7001
Authorizer Title
General Manager
Authorizer Email
G************@m*****.com
Narrative
The 5-6 line which transports finished lube products from the motiva port arthur refinery to the motiva port arthur marine terminal, was discovered to be leaking on july 5, 2017. As a result, the line was excavated for inspection and repair. Failure was observed along the longitudinal axis of the pipe in one area, measured to be approximate 17 inches long. Cross section of pipe containing the failure was submitted to an independent metallurgical testing lab for analysis. Based on extensive examination, the conclusion was made that in most likelihood, failure was the result of ductile fracture along a non-optimal erw seam. The failure onset was facilitated by: 1. Intermittent patches of lack of fusion along the erw joint and 2. Significant od surface wall loss due to preferential corrosion along the side of the pipe corresponding to the erw. It is suspected that the out of service, blocked in line over-pressured due to thermal expansion but exact failure pressure could not be determined through the failure analysis.
| Report Received Date | 2017-08-03 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170234 |
| Supplemental Number | 30174 |
| Report Type | Supplemental Final |
| Operator Id | 30777 PHMSA Enforcement |
| Name | Motiva Enterprise Llc |
| Operator Street Address | One Allen Center 500 Dallas Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2017-07-05 16:00:00 |
| Location Latitude | 29.873832 Google Maps OpenStreetMap |
| Location Longitude | -93.957803 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Other |
| Commodity Details | Lube Oil - Star 12 |
| Unintentional Release Bbls | 0.62 |
| Recovered Bbls | 0.6 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2017-07-05 16:00:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-07-05 16:00:00 |
| Restart Datetime | 2017-10-18 17:00:00 |
| On Site Datetime | 2017-07-05 16:00:00 |
| Nrc Rpt Datetime | 2017-07-05 17:15:00 |
| Nrc Rpt Num | 1183189 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | 5-6 Lube Line |
| Segment Name | 5-6 Lube Line |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77640 |
| Onshore City Name | Port Arthur |
| Onshore County Name | Jefferson County |
| Designated Location | Milepost/valve Station |
| Designated Name | West Gate |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 6 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Seam |
| Pipe Diameter | 6 |
| Pipe Wall Thickness | 0.28 |
| Pipe Smys | 24000 |
| Pipe Specification | Grade B |
| Pipe Seam Type | Erw � Unknown Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1952 |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Width | 1.5 |
| Rupture Length | 17 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Vegetation Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 2 |
| Est Cost Prop Damage | 2414 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 12500 |
| Est Cost Other | 0 |
| Est Cost Other Details | Emergency Response Was Handled Internally By The Motiva Emergency Response Team |
| Prpty | 14916 |
| Accident Psig | 0 |
| Mop Psig | 400 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 10150 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Line was not in service at the time of the incident, the line was blocked in. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | General Corrosion |
| Selective Seam Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Metallurgical Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | Yes |
| Cathodic Pro Start Year | Unknown |
| Shielding Evident | No |
| Cathodic Survey Type | Yes |
| Cp Annual Survey Ind | Yes |
| Cp Annual Survey Year | 2016 |
| Prior Damage | No |
| Collected Data Ind | Yes |
| Geometry Deformation Ind | Yes |
| Other Tool Tech Ind | Yes |
| Geometry Recent Year | 2015 |
| Other Tool | Ili |
| Other Recent Year | 2015 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2011 |
| Hydrtst Most Rcnt Pressure | 600 |
| Direct Asmnt Conducted | Yes, But The Point Of The Accident Was Not Identified As A Dig Site |
| Direct Asmnt Pnt Not Idntf Yr | 2015 |
| Non Destructive Exam Ind | Yes |
| Exm Other Type | Ili |
| Exm Other Rcnt Year | 2015 |
| Exm Other Rcnt Ind | Yes |
| Preparer Name | E******** R** |
| Preparer Title | Dot Compliance Specialist |
| Preparer Email | E************@m*****.com |
| Preparer Telephone | 409-989-7150 |
| Prepared Date | 2018-04-09 00:00:00 |
| Authorizer Name | G*** L******* |
| Authorizer Telephone | 409-989-7001 |
| Authorizer Title | General Manager |
| Authorizer Email | G************@m*****.com |
| Narrative | The 5-6 line which transports finished lube products from the motiva port arthur refinery to the motiva port arthur marine terminal, was discovered to be leaking on july 5, 2017. As a result, the line was excavated for inspection and repair. Failure was observed along the longitudinal axis of the pipe in one area, measured to be approximate 17 inches long. Cross section of pipe containing the failure was submitted to an independent metallurgical testing lab for analysis. Based on extensive examination, the conclusion was made that in most likelihood, failure was the result of ductile fracture along a non-optimal erw seam. The failure onset was facilitated by: 1. Intermittent patches of lack of fusion along the erw joint and 2. Significant od surface wall loss due to preferential corrosion along the side of the pipe corresponding to the erw. It is suspected that the out of service, blocked in line over-pressured due to thermal expansion but exact failure pressure could not be determined through the failure analysis. |