HL incident on 2017-06-22 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,789,276
Incident datetime
2017-06-22 19:00
Report number
Location
TX
Narrative
On 06/22/2017 at approximately 19:00 local operations discovered crude oil on top of the soil near the 12" relief line. All movements were shutdown until the source could be identified. At 20:10 it was determined that the cost of repair would exceed $50,000 and the nrc notification was immediately made. After excavation, the source was identified to be a nickel size hole at the 6 o'clock position on the 12" relief line. A plidco clamp was installed and the line returned to service shortly after. All movements were able to resume at 11:47 on 06-25-17. A final repair will be completed at a later date. The 48 hr nrc update was completed at 09:15 on 06-24-17, report number 1189242. 9/13/2018: final repair was made to pipeline by completely abandoning two relief pipelines at facility, including the one that failed. Pipe was cut, filled with concrete, and welded caps on ends.
Detailed record list
Report Received Date
2017-07-17 00:00:00
Iyear
2017
Report Number
20170218
Supplemental Number
30935
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-06-22 19:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
75
Recovered Bbls
75
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-06-22 19:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-06-22 19:00:00
Restart Datetime
2017-06-25 11:47:00
On Site Datetime
2017-06-22 19:00:00
Nrc Rpt Datetime
2017-06-22 20:15:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Jones Creek
Segment Name
Relief Line
Onshore State Abbreviation
Tx
Onshore Postal Code
77542
Onshore City Name
Jones Creek
Onshore County Name
Brazoria
Designated Location
Milepost/valve Station
Designated Name
Jc Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Relief Line And Relief Equipment
Installation Year
1976
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
120
Est Cost Prop Damage
1789276
Est Cost Emergency
0
Est Cost Environmental
299593
Est Cost Other
0
Prpty
2088989
Accident Psig
15
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller nor control room were a contributing factor.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Preparer Name
L**** W*******
Preparer Title
Pipeline Compliance Senior Engineer
Preparer Email
L*********@e****.com
Preparer Telephone
713-381-6748
Prepared Date
2018-09-13 00:00:00
Authorizer Name
L**** W*******
Authorizer Telephone
713-381-6748
Authorizer Title
Pipeline Compliance Senior Engineer
Authorizer Email
L*********@e****.com
Narrative
On 06/22/2017 at approximately 19:00 local operations discovered crude oil on top of the soil near the 12" relief line. All movements were shutdown until the source could be identified. At 20:10 it was determined that the cost of repair would exceed $50,000 and the nrc notification was immediately made. After excavation, the source was identified to be a nickel size hole at the 6 o'clock position on the 12" relief line. A plidco clamp was installed and the line returned to service shortly after. All movements were able to resume at 11:47 on 06-25-17. A final repair will be completed at a later date. The 48 hr nrc update was completed at 09:15 on 06-24-17, report number 1189242. 9/13/2018: final repair was made to pipeline by completely abandoning two relief pipelines at facility, including the one that failed. Pipe was cut, filled with concrete, and welded caps on ends.
Report Received Date 2017-07-17 00:00:00
Iyear 2017
Report Number 20170218
Supplemental Number 30935
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-06-22 19:00:00
Location Latitude 28.949004 Google Maps OpenStreetMap
Location Longitude -95.430746 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 75
Recovered Bbls 75
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2017-06-22 19:00:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-06-22 19:00:00
Restart Datetime 2017-06-25 11:47:00
On Site Datetime 2017-06-22 19:00:00
Nrc Rpt Datetime 2017-06-22 20:15:00
Nrc Rpt Num 1181999 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Jones Creek
Segment Name Relief Line
Onshore State Abbreviation Tx
Onshore Postal Code 77542
Onshore City Name Jones Creek
Onshore County Name Brazoria
Designated Location Milepost/valve Station
Designated Name Jc Station
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 48
Crossing No
Pipe Facility Type Interstate
Item Involved Relief Line And Relief Equipment
Installation Year 1976
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 120
Est Cost Prop Damage 1789276
Est Cost Emergency 0
Est Cost Environmental 299593
Est Cost Other 0
Prpty 2088989
Accident Psig 15
Mop Psig 275
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Controller nor control room were a contributing factor.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Preparer Name L**** W*******
Preparer Title Pipeline Compliance Senior Engineer
Preparer Email L*********@e****.com
Preparer Telephone 713-381-6748
Prepared Date 2018-09-13 00:00:00
Authorizer Name L**** W*******
Authorizer Telephone 713-381-6748
Authorizer Title Pipeline Compliance Senior Engineer
Authorizer Email L*********@e****.com
Narrative On 06/22/2017 at approximately 19:00 local operations discovered crude oil on top of the soil near the 12" relief line. All movements were shutdown until the source could be identified. At 20:10 it was determined that the cost of repair would exceed $50,000 and the nrc notification was immediately made. After excavation, the source was identified to be a nickel size hole at the 6 o'clock position on the 12" relief line. A plidco clamp was installed and the line returned to service shortly after. All movements were able to resume at 11:47 on 06-25-17. A final repair will be completed at a later date. The 48 hr nrc update was completed at 09:15 on 06-24-17, report number 1189242. 9/13/2018: final repair was made to pipeline by completely abandoning two relief pipelines at facility, including the one that failed. Pipe was cut, filled with concrete, and welded caps on ends.