HL incident on 2017-06-15 — CO

Operator
Tesoro Logistics Rockies
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1
Incident datetime
2017-06-15 08:00
Report number
Location
CO
Narrative
The oneok pipeline was shutdown and isolated with product the night of 6/14/2017. In the morning of 6/15/2017, the pressure on the pipeline was reviewed and it was discovered that the pressure had dropped from 950 psig to 250 psig. Operations walked the pipeline with a forward-looking infrared (flir) camera and found that a 1/2 inch bleed valve on the pig receiver was leaking and product was being lost as gas. The valve was repaired by adding new thread tape and pipe dope.
Detailed record list
Report Received Date
2017-07-12 00:00:00
Iyear
2017
Report Number
20170211
Supplemental Number
22873
Report Type
Supplemental Final
Operator Id
Name
Tesoro Logistics Rockies
Operator Street Address
1515 Arapahoe Street Suite 1600
Operator City Name
Denver
Operator State Abbreviation
CO
Operator Postal Code
80202
Local Datetime
2017-06-15 08:00:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
4.3
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-06-15 08:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Sitting Idle With Product Inside
On Site Datetime
2017-06-15 08:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Oneok Pipeline
Segment Name
Oneok Pipeline
Onshore State Abbreviation
Wy
Onshore Postal Code
82939
Onshore City Name
Not Within A Municipality
Onshore County Name
Lincoln
Designated Location
Milepost/valve Station
Designated Name
Pig Receiver
Federal
Yes
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2017
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
69
Est Cost Prop Damage
1
Est Cost Emergency
500
Est Cost Environmental
0
Est Cost Other
0
Prpty
570
Accident Psig
950
Mop Psig
2025
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
11452
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Valve Threads
Additional Installation Ind
Yes
Preparer Name
K****** M********
Preparer Title
Dot Compliance Specialist
Preparer Email
K******************@t******.com
Preparer Telephone
(303)606-3405
Prepared Date
2017-12-05 00:00:00
Authorizer Name
A**** M*******
Authorizer Telephone
(210)626-6343
Authorizer Title
Director Compliance Logistics
Authorizer Email
A***************@t******.com
Narrative
The oneok pipeline was shutdown and isolated with product the night of 6/14/2017. In the morning of 6/15/2017, the pressure on the pipeline was reviewed and it was discovered that the pressure had dropped from 950 psig to 250 psig. Operations walked the pipeline with a forward-looking infrared (flir) camera and found that a 1/2 inch bleed valve on the pig receiver was leaking and product was being lost as gas. The valve was repaired by adding new thread tape and pipe dope.
Report Received Date 2017-07-12 00:00:00
Iyear 2017
Report Number 20170211
Supplemental Number 22873
Report Type Supplemental Final
Operator Id 39228 PHMSA Enforcement
Name Tesoro Logistics Rockies
Operator Street Address 1515 Arapahoe Street Suite 1600
Operator City Name Denver
Operator State Abbreviation CO
Operator Postal Code 80202
Local Datetime 2017-06-15 08:00:00
Location Latitude 41.58111 Google Maps OpenStreetMap
Location Longitude -110.05099 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 4.3
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2017-06-15 08:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Pipeline Was Sitting Idle With Product Inside
On Site Datetime 2017-06-15 08:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Automatic
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Oneok Pipeline
Segment Name Oneok Pipeline
Onshore State Abbreviation Wy
Onshore Postal Code 82939
Onshore City Name Not Within A Municipality
Onshore County Name Lincoln
Designated Location Milepost/valve Station
Designated Name Pig Receiver
Federal Yes
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Valve
Valve Type Auxiliary Or Other Valve
Installation Year 2017
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 69
Est Cost Prop Damage 1
Est Cost Emergency 500
Est Cost Environmental 0
Est Cost Other 0
Prpty 570
Accident Psig 950
Mop Psig 2025
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 11452
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Valve Threads
Additional Installation Ind Yes
Preparer Name K****** M********
Preparer Title Dot Compliance Specialist
Preparer Email K******************@t******.com
Preparer Telephone (303)606-3405
Prepared Date 2017-12-05 00:00:00
Authorizer Name A**** M*******
Authorizer Telephone (210)626-6343
Authorizer Title Director Compliance Logistics
Authorizer Email A***************@t******.com
Narrative The oneok pipeline was shutdown and isolated with product the night of 6/14/2017. In the morning of 6/15/2017, the pressure on the pipeline was reviewed and it was discovered that the pressure had dropped from 950 psig to 250 psig. Operations walked the pipeline with a forward-looking infrared (flir) camera and found that a 1/2 inch bleed valve on the pig receiver was leaking and product was being lost as gas. The valve was repaired by adding new thread tape and pipe dope.