Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2017-05-06 — MO
Operator
Laclede Gas Co
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$60,000
Incident datetime
2017-05-06 06:30
Report number
Location
MO
Narrative
Leak on hvl line called in by an outside party at approximately 6:30am on saturday, may 6, 2017. Laclede pipeline personnel on site at approximately 7:30 am; immediately started notification and shutdown procedures. The leak was isolated as soon as possible by closing the nearest upstream and downstream block valves. Discussions between pipeline personnel on site and management determined that this could be a federal reportable accident because potential repair costs could exceed $50,000 at approximately 11:08 am cdt. The nrc was called at 11:39am cdt, nrc incident report #1177602. The nrc was notified that the line had been shut in and the release secured. Also, that the leak site had been cordoned off and would be monitored by pipeline personnel until the line could be isolated and repaired. The 48 hour renotification was made on monday, may 8, 2017 at 11:24 cdt; nrc incident report #1177752. A no change in status was reported. A line purge and repair plan was developed and set into motion on tuesday, may 9, 2017. The leak site was excavated on wednesday, may 10 and the source of the leak was found to be a leaking insulated flange. The leaking flange was cut out on thursday, may 11 and a new spool piece welded in its place. A line refill plan was formalized over the weekend and the line was refilled and returned to service tuesday, may 16. The other eleven (11) buried flanges along the line will be located and a complete evaluation made of their integrity. Mitigative actions will be taken if necessary.
Detailed record list
Report Received Date
2017-06-05 00:00:00
Iyear
2017
Report Number
20170180
Supplemental Number
22441
Report Type
Supplemental Final
Operator Id
11032
Name
Laclede Gas Co
Operator Street Address
700 Market Street
Operator City Name
Saint Louis
Operator State Abbreviation
MO
Operator Postal Code
63101
Local Datetime
2017-05-06 06:30:00
Location Latitude
38.587043
Location Longitude
-90.18232
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Liquid Propane
Unintentional Release Bbls
1519
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2017-05-06 06:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-05-06 08:00:00
Restart Datetime
2017-05-16 17:17:00
On Site Datetime
2017-05-06 07:30:00
Nrc Rpt Datetime
2017-05-06 11:51:00
Nrc Rpt Num
1177602
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Laclede Pipeline
Segment Name
Main Line
Onshore State Abbreviation
Il
Onshore Postal Code
62206
Onshore City Name
Sauget
Onshore County Name
St. Clair
Designated Location
Milepost/valve Station
Designated Name
Am 374
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Flange Assembly
Installation Year
1964
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
26163
Est Cost Prop Damage
60000
Est Cost Emergency
3000
Est Cost Environmental
0
Est Cost Other
0
Prpty
89163
Accident Psig
191
Mop Psig
720
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
16054
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No operational parameters were exceeded
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Additional Installation Ind
Yes
Preparer Name
K*** A* A***
Preparer Title
Compliance Engineer Iii
Preparer Email
K********@s**********.com
Preparer Telephone
314-349-2925
Prepared Date
2017-06-26 00:00:00
Authorizer Name
C**** R* H********
Authorizer Telephone
314-349-2972
Authorizer Title
Vice President Operations Services
Authorizer Email
C**************@s**********.com
Narrative
Leak on hvl line called in by an outside party at approximately 6:30am on saturday, may 6, 2017. Laclede pipeline personnel on site at approximately 7:30 am; immediately started notification and shutdown procedures. The leak was isolated as soon as possible by closing the nearest upstream and downstream block valves. Discussions between pipeline personnel on site and management determined that this could be a federal reportable accident because potential repair costs could exceed $50,000 at approximately 11:08 am cdt. The nrc was called at 11:39am cdt, nrc incident report #1177602. The nrc was notified that the line had been shut in and the release secured. Also, that the leak site had been cordoned off and would be monitored by pipeline personnel until the line could be isolated and repaired. The 48 hour renotification was made on monday, may 8, 2017 at 11:24 cdt; nrc incident report #1177752. A no change in status was reported. A line purge and repair plan was developed and set into motion on tuesday, may 9, 2017. The leak site was excavated on wednesday, may 10 and the source of the leak was found to be a leaking insulated flange. The leaking flange was cut out on thursday, may 11 and a new spool piece welded in its place. A line refill plan was formalized over the weekend and the line was refilled and returned to service tuesday, may 16. The other eleven (11) buried flanges along the line will be located and a complete evaluation made of their integrity. Mitigative actions will be taken if necessary.
| Report Received Date | 2017-06-05 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170180 |
| Supplemental Number | 22441 |
| Report Type | Supplemental Final |
| Operator Id | 11032 PHMSA Enforcement |
| Name | Laclede Gas Co |
| Operator Street Address | 700 Market Street |
| Operator City Name | Saint Louis |
| Operator State Abbreviation | MO |
| Operator Postal Code | 63101 |
| Local Datetime | 2017-05-06 06:30:00 |
| Location Latitude | 38.587043 Google Maps OpenStreetMap |
| Location Longitude | -90.18232 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Other Hvl |
| Commodity Details | Liquid Propane |
| Unintentional Release Bbls | 1519 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2017-05-06 06:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-05-06 08:00:00 |
| Restart Datetime | 2017-05-16 17:17:00 |
| On Site Datetime | 2017-05-06 07:30:00 |
| Nrc Rpt Datetime | 2017-05-06 11:51:00 |
| Nrc Rpt Num | 1177602 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Laclede Pipeline |
| Segment Name | Main Line |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 62206 |
| Onshore City Name | Sauget |
| Onshore County Name | St. Clair |
| Designated Location | Milepost/valve Station |
| Designated Name | Am 374 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 48 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Flange Assembly |
| Installation Year | 1964 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 26163 |
| Est Cost Prop Damage | 60000 |
| Est Cost Emergency | 3000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 89163 |
| Accident Psig | 191 |
| Mop Psig | 720 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 16054 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No operational parameters were exceeded |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Gasket |
| Additional Installation Ind | Yes |
| Preparer Name | K*** A* A*** |
| Preparer Title | Compliance Engineer Iii |
| Preparer Email | K********@s**********.com |
| Preparer Telephone | 314-349-2925 |
| Prepared Date | 2017-06-26 00:00:00 |
| Authorizer Name | C**** R* H******** |
| Authorizer Telephone | 314-349-2972 |
| Authorizer Title | Vice President Operations Services |
| Authorizer Email | C**************@s**********.com |
| Narrative | Leak on hvl line called in by an outside party at approximately 6:30am on saturday, may 6, 2017. Laclede pipeline personnel on site at approximately 7:30 am; immediately started notification and shutdown procedures. The leak was isolated as soon as possible by closing the nearest upstream and downstream block valves. Discussions between pipeline personnel on site and management determined that this could be a federal reportable accident because potential repair costs could exceed $50,000 at approximately 11:08 am cdt. The nrc was called at 11:39am cdt, nrc incident report #1177602. The nrc was notified that the line had been shut in and the release secured. Also, that the leak site had been cordoned off and would be monitored by pipeline personnel until the line could be isolated and repaired. The 48 hour renotification was made on monday, may 8, 2017 at 11:24 cdt; nrc incident report #1177752. A no change in status was reported. A line purge and repair plan was developed and set into motion on tuesday, may 9, 2017. The leak site was excavated on wednesday, may 10 and the source of the leak was found to be a leaking insulated flange. The leaking flange was cut out on thursday, may 11 and a new spool piece welded in its place. A line refill plan was formalized over the weekend and the line was refilled and returned to service tuesday, may 16. The other eleven (11) buried flanges along the line will be located and a complete evaluation made of their integrity. Mitigative actions will be taken if necessary. |