HL incident on 2017-05-10 — TX

Operator
Sunoco Midland Gathering Llc
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$3,000
Incident datetime
2017-05-10 10:00
Report number
Location
TX
Narrative
During the commissiioning process a 1" bleeder valve was left in the open position to facilitate the drainage of hydrostatic test water. A contractor was checking the operation of newly installed motor operated valves (mov) and inadvertently opened an mov on an adjacent fill line which contained oil. This resulted in oil reaching the open 1" bleeder valve causing the release of approximately 2 barrels of oil. The valve was immediately closed and the affected soil was removed for onsite remediation. The tx rrc was notified of the release and incident no 1565 was assigned. To prevent a recurrence, all additional work associated with this project will be carried out under a written work plan which will ensure clear communication between operations and capital projects personnel.
Detailed record list
Report Received Date
2017-06-05 00:00:00
Iyear
2017
Report Number
20170179
Supplemental Number
22529
Report Type
Supplemental Final
Operator Id
Name
Sunoco Midland Gathering Llc
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-05-10 10:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
2
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2017-05-10 10:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Closed Valve To Isolate
On Site Datetime
2017-05-10 10:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Sunoco Midland Terminal
Segment Name
Terminal Piping Or Appurtenance
Onshore State Abbreviation
Tx
Onshore Postal Code
79706
Onshore City Name
Midland
Onshore County Name
Midland
Designated Location
Survey Station No.
Designated Name
0+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2017
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Bleeder Valve In Open Position
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
3000
Est Cost Emergency
250
Est Cost Environmental
2000
Est Cost Other
0
Prpty
5350
Accident Psig
12
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Operation Type
Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Related Failure Follow Ind
Yes
Category Type
Commissioning
Operator Qualification Ind
No
Preparer Name
T*** G* N*******
Preparer Title
Sr. Manager Dot Compliance
Preparer Email
T************@e*************.com
Preparer Telephone
281-637-6576
Preparer Fax
877-917-0448
Prepared Date
2017-08-07 00:00:00
Authorizer Name
T*** G* N*******
Authorizer Telephone
281-637-6576
Authorizer Title
Sr. Manager Dot Compliance
Authorizer Email
T************@e*************.com
Narrative
During the commissiioning process a 1" bleeder valve was left in the open position to facilitate the drainage of hydrostatic test water. A contractor was checking the operation of newly installed motor operated valves (mov) and inadvertently opened an mov on an adjacent fill line which contained oil. This resulted in oil reaching the open 1" bleeder valve causing the release of approximately 2 barrels of oil. The valve was immediately closed and the affected soil was removed for onsite remediation. The tx rrc was notified of the release and incident no 1565 was assigned. To prevent a recurrence, all additional work associated with this project will be carried out under a written work plan which will ensure clear communication between operations and capital projects personnel.
Report Received Date 2017-06-05 00:00:00
Iyear 2017
Report Number 20170179
Supplemental Number 22529
Report Type Supplemental Final
Operator Id 39307 PHMSA Enforcement
Name Sunoco Midland Gathering Llc
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-05-10 10:00:00
Location Latitude 31.9445 Google Maps OpenStreetMap
Location Longitude -101.9207 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 2
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2017-05-10 10:00:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Closed Valve To Isolate
On Site Datetime 2017-05-10 10:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Sunoco Midland Terminal
Segment Name Terminal Piping Or Appurtenance
Onshore State Abbreviation Tx
Onshore Postal Code 79706
Onshore City Name Midland
Onshore County Name Midland
Designated Location Survey Station No.
Designated Name 0+00
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Valve
Valve Type Auxiliary Or Other Valve
Installation Year 2017
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other Bleeder Valve In Open Position
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 100
Est Cost Prop Damage 3000
Est Cost Emergency 250
Est Cost Environmental 2000
Est Cost Other 0
Prpty 5350
Accident Psig 12
Mop Psig 285
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details A review of the accident determined that there were no control room actions that contributed to the event.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Operation Type Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Related Failure Follow Ind Yes
Category Type Commissioning
Operator Qualification Ind No
Preparer Name T*** G* N*******
Preparer Title Sr. Manager Dot Compliance
Preparer Email T************@e*************.com
Preparer Telephone 281-637-6576
Preparer Fax 877-917-0448
Prepared Date 2017-08-07 00:00:00
Authorizer Name T*** G* N*******
Authorizer Telephone 281-637-6576
Authorizer Title Sr. Manager Dot Compliance
Authorizer Email T************@e*************.com
Narrative During the commissiioning process a 1" bleeder valve was left in the open position to facilitate the drainage of hydrostatic test water. A contractor was checking the operation of newly installed motor operated valves (mov) and inadvertently opened an mov on an adjacent fill line which contained oil. This resulted in oil reaching the open 1" bleeder valve causing the release of approximately 2 barrels of oil. The valve was immediately closed and the affected soil was removed for onsite remediation. The tx rrc was notified of the release and incident no 1565 was assigned. To prevent a recurrence, all additional work associated with this project will be carried out under a written work plan which will ensure clear communication between operations and capital projects personnel.

All rights reserved. Copyright © by ClearPHMSA