Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2017-03-21 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$750
Incident datetime
2017-03-21 06:15
Report number
Location
OK
Narrative
At 6:15 am rmt magellan operations discovered a pump seal failure while conducting the morning facility inspection. The mainline pump was shut down upon discovery of the release. A vac truck was mobilized to recover product that collected in concrete containment and impacted soil was disposed of. A new seal was installed to replace the seal and a seal leak detection system was installed on the pump. Approximately four cubic yards of soil was remediated supplemental update: part a 18b, part c 5 and part h narrative marked as final
Detailed record list
Report Received Date
2017-04-19 00:00:00
Iyear
2017
Report Number
20170131
Supplemental Number
22448
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2017-03-21 06:15:00
Location Latitude
39.845144
Location Longitude
-104.914925
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
15
Recovered Bbls
14.9
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2017-03-21 06:15:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-03-21 06:15:00
Restart Datetime
2017-03-23 06:00:00
On Site Datetime
2017-03-21 06:15:00
Nrc Rpt Datetime
2017-03-21 08:32:00
Nrc Rpt Num
1173719
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Dupont Terminal
Segment Name
Terminal No. 418
Onshore State Abbreviation
Co
Onshore Postal Code
80024
Onshore City Name
Dupont
Onshore County Name
Adams
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Installation Year
2015
Material Involved
Material Other Than Carbon Steel
Material Details
Silicon Carbide Antimony Filled Carbon
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
150
Est Cost Prop Damage
750
Est Cost Emergency
50000
Est Cost Environmental
0
Est Cost Other
0
Prpty
50900
Accident Psig
120
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Scada and leak detection were active at the time of the release, but the device that failed was not monitored by operations control and was upstream of measurement
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Normal Seal Wear
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2017-06-29 00:00:00
Authorizer Name
S****** L******
Authorizer Telephone
918-574-7327
Authorizer Title
Ai Analyst
Authorizer Email
S**************@m*********.com
Narrative
At 6:15 am rmt magellan operations discovered a pump seal failure while conducting the morning facility inspection. The mainline pump was shut down upon discovery of the release. A vac truck was mobilized to recover product that collected in concrete containment and impacted soil was disposed of. A new seal was installed to replace the seal and a seal leak detection system was installed on the pump. Approximately four cubic yards of soil was remediated supplemental update: part a 18b, part c 5 and part h narrative marked as final
| Report Received Date | 2017-04-19 00:00:00 |
|---|---|
| Iyear | 2017 |
| Report Number | 20170131 |
| Supplemental Number | 22448 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2017-03-21 06:15:00 |
| Location Latitude | 39.845144 Google Maps OpenStreetMap |
| Location Longitude | -104.914925 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 15 |
| Recovered Bbls | 14.9 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2017-03-21 06:15:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2017-03-21 06:15:00 |
| Restart Datetime | 2017-03-23 06:00:00 |
| On Site Datetime | 2017-03-21 06:15:00 |
| Nrc Rpt Datetime | 2017-03-21 08:32:00 |
| Nrc Rpt Num | 1173719 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Dupont Terminal |
| Segment Name | Terminal No. 418 |
| Onshore State Abbreviation | Co |
| Onshore Postal Code | 80024 |
| Onshore City Name | Dupont |
| Onshore County Name | Adams |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pump |
| Installation Year | 2015 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Silicon Carbide Antimony Filled Carbon |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 150 |
| Est Cost Prop Damage | 750 |
| Est Cost Emergency | 50000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 50900 |
| Accident Psig | 120 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Scada and leak detection were active at the time of the release, but the device that failed was not monitored by operations control and was upstream of measurement |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Pump Or Pump-Related Equipment |
| Eq Failure Type | Pump Or Pump-Related Equipment |
| Other Pump Ind | Seal/packing Failure |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Normal Seal Wear |
| Preparer Name | S****** L****** |
| Preparer Title | Ai Analyst |
| Preparer Email | S**************@m*********.com |
| Preparer Telephone | 918-574-7327 |
| Preparer Fax | 918-574-7376 |
| Prepared Date | 2017-06-29 00:00:00 |
| Authorizer Name | S****** L****** |
| Authorizer Telephone | 918-574-7327 |
| Authorizer Title | Ai Analyst |
| Authorizer Email | S**************@m*********.com |
| Narrative | At 6:15 am rmt magellan operations discovered a pump seal failure while conducting the morning facility inspection. The mainline pump was shut down upon discovery of the release. A vac truck was mobilized to recover product that collected in concrete containment and impacted soil was disposed of. A new seal was installed to replace the seal and a seal leak detection system was installed on the pump. Approximately four cubic yards of soil was remediated supplemental update: part a 18b, part c 5 and part h narrative marked as final |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA