GTG incident on 2017-11-15 — TX

Operator
Atmos Pipeline - Texas
Cause
Locating Issue
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2017-11-15 09:15
Report number
Location
TX
Narrative
Additional nrc report no. 1197541 on november 15, 2017, an atmos energy contractor hit the line at the johntown block valve/johntown tap yard. The contractor was hired by atmos energy to do the bores on the line o38-1 line replacement. The contractor drilled a 2.5 inch hole in the line at the station listed. As part of its normal operations, atmos energy has a program in place to monitor and take appropriate action as needed with contractors who damage company assets during excavation. This damage prevention program is applicable to this contractor and was followed and applied with regard to this incident. The program involves, among other actions: (1) audits of current excavation projects of 2nd party contractors to review compliance with pipeline locating and damage prevention procedures; (2) meetings with 2nd party contractors to discuss at-fault damages and develop root-cause analysis of the damages; (3) provision of coaching to contractors of damage prevention measures regarding the importance of proper locating procedures and safe excavation practices within the tolerance zone; and (4) public liaison meetings and mock line strikes conducted annually for emergency responders and excavators within our service area, emphasizing proper use of the 811 notification system, safe excavation practices, and response actions to take in the event of a pipeline incident.
Detailed record list
Report Received Date
2017-12-15 00:00:00
Iyear
2017
Report Number
20170122
Supplemental Number
30469
Report Type
Supplemental Final
Operator Id
Name
Atmos Pipeline - Texas
Operator Street Address
5420 Lbj Freeway, Suite 1800
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75240
Local Datetime
2017-11-15 08:51:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2017-11-15 10:51:00
Commodity Released Type
Natural Gas
Unintentional Release
4537
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2017-11-15 15:00:00
Restart Datetime
2017-11-15 21:00:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2017-11-15 09:15:00
On Site Datetime
2017-11-15 10:00:00
On Off Shore
Onshore
Onshore State Abbreviation
Tx
Onshore Postal Code
75417
Onshore City Name
Bogata
Onshore County Name
Red River
Designated Location
Survey Station No.
Designated Name
92+07
Pipe Fac Name
O38-1
Segment Name
O38-1
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
66
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12
Pipe Wall Thickness
0.25
Pipe Smys
35000
Pipe Specification
Unknown
Pipe Seam Type
Seamless
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1957
Manufactured Year
1957
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
2.5
Puncture Circum
2.5
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
134
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
1000
Est Cost Unintentional Release
12658
Est Cost Intentional Release
0
Est Cost Prop Damage
0
Est Cost Emergency
61463
Est Cost Other
4000
Est Cost Other Details
Cng Needed After Shutdown Of Pipeline
Prpty
79121
Accident Psig
340
Mop Psig
500
Mop Cfr Section
192.619(A)(2)
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
38086
Internal Inspection Ind
No
Unsuitable Mainline Ind
Yes
Tight Mitered Ind
Yes
Other Restrictions Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
Yes
Num Contractors Tested
4
Num Contractors Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type
Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Boring
Work Performed
Natural Gas
One Call Notified Ind
Yes
One Call Ticket Num
1782014994
One Call Center Name
Texas811
Locator Type
Contract Locator
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
6
Root Cause Category
Locating Issue
Root Cause Type
Facility Not Marked Due To Incomplete Marks At Damage Location
Preparer Name
C****** L****
Preparer Title
Operations Supervisor
Preparer Email
C************@a**********.com
Preparer Telephone
903-249-1283
Preparer Fax
903-784-7654
Authorizer Name
M**** S*****
Authorizer Title
Director Regulatory And Compliance
Authorizer Telephone
214-206-2033
Authorizer Email
M***********@a**********.com
Narrative
Additional nrc report no. 1197541 on november 15, 2017, an atmos energy contractor hit the line at the johntown block valve/johntown tap yard. The contractor was hired by atmos energy to do the bores on the line o38-1 line replacement. The contractor drilled a 2.5 inch hole in the line at the station listed. As part of its normal operations, atmos energy has a program in place to monitor and take appropriate action as needed with contractors who damage company assets during excavation. This damage prevention program is applicable to this contractor and was followed and applied with regard to this incident. The program involves, among other actions: (1) audits of current excavation projects of 2nd party contractors to review compliance with pipeline locating and damage prevention procedures; (2) meetings with 2nd party contractors to discuss at-fault damages and develop root-cause analysis of the damages; (3) provision of coaching to contractors of damage prevention measures regarding the importance of proper locating procedures and safe excavation practices within the tolerance zone; and (4) public liaison meetings and mock line strikes conducted annually for emergency responders and excavators within our service area, emphasizing proper use of the 811 notification system, safe excavation practices, and response actions to take in the event of a pipeline incident.
Report Received Date 2017-12-15 00:00:00
Iyear 2017
Report Number 20170122
Supplemental Number 30469
Report Type Supplemental Final
Operator Id 31978 PHMSA Enforcement
Name Atmos Pipeline - Texas
Operator Street Address 5420 Lbj Freeway, Suite 1800
Operator City Name Dallas
Operator State Abbreviation TX
Operator Postal Code 75240
Local Datetime 2017-11-15 08:51:00
Location Latitude 33.41944 Google Maps OpenStreetMap
Location Longitude -95.18127 Google Maps OpenStreetMap
Nrc Rpt Num 1197363 NRC Report How to search
Nrc Rpt Datetime 2017-11-15 10:51:00
Commodity Released Type Natural Gas
Unintentional Release 4537
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind Yes
Shutdown Datetime 2017-11-15 15:00:00
Restart Datetime 2017-11-15 21:00:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2017-11-15 09:15:00
On Site Datetime 2017-11-15 10:00:00
On Off Shore Onshore
Onshore State Abbreviation Tx
Onshore Postal Code 75417
Onshore City Name Bogata
Onshore County Name Red River
Designated Location Survey Station No.
Designated Name 92+07
Pipe Fac Name O38-1
Segment Name O38-1
Federal No
Location Type Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 66
Crossing No
Pipe Facility Type Intrastate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 12
Pipe Wall Thickness 0.25
Pipe Smys 35000
Pipe Specification Unknown
Pipe Seam Type Seamless
Pipe Manufacturer Unknown
Pipe Coating Type Coal Tar
Installation Year 1957
Manufactured Year 1957
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 2.5
Puncture Circum 2.5
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 134
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 1000
Est Cost Unintentional Release 12658
Est Cost Intentional Release 0
Est Cost Prop Damage 0
Est Cost Emergency 61463
Est Cost Other 4000
Est Cost Other Details Cng Needed After Shutdown Of Pipeline
Prpty 79121
Accident Psig 340
Mop Psig 500
Mop Cfr Section 192.619(A)(2) View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 38086
Internal Inspection Ind No
Unsuitable Mainline Ind Yes
Tight Mitered Ind Yes
Other Restrictions Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind Yes
Num Contractors Tested 4
Num Contractors Failed 0
Cause Excavation Damage
Cause Details Excavation Damage By Operator's Contractor (Second Party)
Ex Party Type Excavation Damage By Operator's Contractor (Second Party)
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Excavator Type Contractor
Excavator Equipment Boring
Work Performed Natural Gas
One Call Notified Ind Yes
One Call Ticket Num 1782014994
One Call Center Name Texas811
Locator Type Contract Locator
Visible Marks No
Service Interruption Yes
Service Interruption Hours 6
Root Cause Category Locating Issue
Root Cause Type Facility Not Marked Due To Incomplete Marks At Damage Location
Preparer Name C****** L****
Preparer Title Operations Supervisor
Preparer Email C************@a**********.com
Preparer Telephone 903-249-1283
Preparer Fax 903-784-7654
Authorizer Name M**** S*****
Authorizer Title Director Regulatory And Compliance
Authorizer Telephone 214-206-2033
Authorizer Email M***********@a**********.com
Narrative Additional nrc report no. 1197541 on november 15, 2017, an atmos energy contractor hit the line at the johntown block valve/johntown tap yard. The contractor was hired by atmos energy to do the bores on the line o38-1 line replacement. The contractor drilled a 2.5 inch hole in the line at the station listed. As part of its normal operations, atmos energy has a program in place to monitor and take appropriate action as needed with contractors who damage company assets during excavation. This damage prevention program is applicable to this contractor and was followed and applied with regard to this incident. The program involves, among other actions: (1) audits of current excavation projects of 2nd party contractors to review compliance with pipeline locating and damage prevention procedures; (2) meetings with 2nd party contractors to discuss at-fault damages and develop root-cause analysis of the damages; (3) provision of coaching to contractors of damage prevention measures regarding the importance of proper locating procedures and safe excavation practices within the tolerance zone; and (4) public liaison meetings and mock line strikes conducted annually for emergency responders and excavators within our service area, emphasizing proper use of the 811 notification system, safe excavation practices, and response actions to take in the event of a pipeline incident.