GD incident on 2017-09-01 — TX

Operator
Centerpoint Energy Resources Corporation
Cause
Other Outside Force Damage
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,750,000
Incident datetime
2017-09-01 17:24
Report number
Location
TX, ORANGE
Narrative
During hurricane/tropical storm harvey, portions of south texas including the beaumont/vidor area experienced record flooding. During this time that included high flood waters and severe turbulence in the neches river the incident described in this report occurred. Centerpoint energy is aware of two large ships and several tugboats near the location where centerpoint energy's pipeline was damaged.
Detailed record list
Occurred At
2017-09-01 17:24:00
Year
2017
Report Received Date
2017-09-29 00:00:00
Iyear
2017.0
Report Number
20170088.0
Supplemental Number
30716.0
Report Type
Supplemental Final
Operator Id
Name
Centerpoint Energy Resources Corporation
Operator Street Address
1111 Louisiana St
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2017-09-01 17:24:00
Location Street Address
Neches River Pipeline Crosiiing
Location City Name
Vidor
Location County Name
Orange
Location State Abbreviation
TX
Location Postal Code
77662
Location Latitude
Location Longitude
Nrc Rpt Datetime
2017-09-01 20:25:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
14000.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2017-09-01 17:24:00
On Site Datetime
2017-09-01 17:50:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Other
Incident Area Details
Underwater Crossing
Crossing
Yes
Water Crossing Ind
Yes
Water Type
Uncased
Water Name
Neches River
Water Depth
48
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1975.0
Pipe Diameter
16.0
Pipe Specification
Grade B
Pipe Manufacturer
Phoenix
Material Involved
Steel
Steel Seam Type
Seamless
Steel Seam Type Details
Seamless
Wt Steel
0.5
Release Type
Rupture
Rupture Orient
Circumferential
Rupture Length
16
Rupture Width
16
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
1750000.0
Est Cost Emergency
300000.0
Est Cost Other
200000.0
Est Cost Other Details
Use Of Contractors & Equipment Who Specialize In Underwater Repair And Removal.
Est Cost Unintentional Release
41000.0
Prpty
2291000.0
Commercial Affected
0.0
Industrial Affected
2.0
Residences Affected
0.0
Accident Psig
35.6
Normal Psig
72.0
Mop Psig
78.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
No
Scada Functional Ind
No
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Other
Accident Details
Kinder Morgan Pipeline Personnel
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Scada system for this pipeline was down due to hurricane harvey flooding
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Outside Force Damage
Cause Details
Damage By Boats, Barges, Drilling Rigs, Or Other Maritime Equipment Or Vessels Set Adrift Or Which Have Otherwise Lost Their Mooring
Outside Force Type
Damage By Boats, Barges, Drilling Rigs, Or Other Maritime Equipment Or Vessels Set Adrift Or Which Have Otherwise Lost Their Mooring
Osf Hurricane Ind
Yes
Osf Tropical Storm Ind
Yes
Osf Heavy Rains Ind
Yes
Preparer Name
L***** J* D********
Preparer Title
Compliance Coordinator Ii
Preparer Email
L***************@c****************.com
Preparer Telephone
713-967-7325
Preparer Fax
713-967-7307
Authorizer Name
S**** Y********
Authorizer Title
Regional Operations Director
Authorizer Telephone
713-207-5700
Authorizer Email
S**************@c****************.com
Narrative
During hurricane/tropical storm harvey, portions of south texas including the beaumont/vidor area experienced record flooding. During this time that included high flood waters and severe turbulence in the neches river the incident described in this report occurred. Centerpoint energy is aware of two large ships and several tugboats near the location where centerpoint energy's pipeline was damaged.
Occurred At 2017-09-01 17:24:00
Year 2017
Report Received Date 2017-09-29 00:00:00
Iyear 2017.0
Report Number 20170088.0
Supplemental Number 30716.0
Report Type Supplemental Final
Operator Id 4499 PHMSA Enforcement
Name Centerpoint Energy Resources Corporation
Operator Street Address 1111 Louisiana St
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2017-09-01 17:24:00
Location Street Address Neches River Pipeline Crosiiing
Location City Name Vidor
Location County Name Orange
Location State Abbreviation TX
Location Postal Code 77662
Location Latitude 30.078014 Google Maps OpenStreetMap
Location Longitude -94.076806 Google Maps OpenStreetMap
Nrc Rpt Datetime 2017-09-01 20:25:00
Nrc Rpt Num 1189083 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 14000.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2017-09-01 17:24:00
On Site Datetime 2017-09-01 17:50:00
Federal No
Location Type Utility Right-Of-Way / Easement
Incident Area Type Underground
Incident Area Subtype Other
Incident Area Details Underwater Crossing
Crossing Yes
Water Crossing Ind Yes
Water Type Uncased
Water Name Neches River
Water Depth 48
Pipe Facility Type Privately Owned
System Part Involved Main
Installation Year 1975.0
Pipe Diameter 16.0
Pipe Specification Grade B
Pipe Manufacturer Phoenix
Material Involved Steel
Steel Seam Type Seamless
Steel Seam Type Details Seamless
Wt Steel 0.5
Release Type Rupture
Rupture Orient Circumferential
Rupture Length 16
Rupture Width 16
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 1750000.0
Est Cost Emergency 300000.0
Est Cost Other 200000.0
Est Cost Other Details Use Of Contractors & Equipment Who Specialize In Underwater Repair And Removal.
Est Cost Unintentional Release 41000.0
Prpty 2291000.0
Commercial Affected 0.0
Industrial Affected 2.0
Residences Affected 0.0
Accident Psig 35.6
Normal Psig 72.0
Mop Psig 78.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind Yes
Scada Operating Ind No
Scada Functional Ind No
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Other
Accident Details Kinder Morgan Pipeline Personnel
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Scada system for this pipeline was down due to hurricane harvey flooding
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Other Outside Force Damage
Cause Details Damage By Boats, Barges, Drilling Rigs, Or Other Maritime Equipment Or Vessels Set Adrift Or Which Have Otherwise Lost Their Mooring
Outside Force Type Damage By Boats, Barges, Drilling Rigs, Or Other Maritime Equipment Or Vessels Set Adrift Or Which Have Otherwise Lost Their Mooring
Osf Hurricane Ind Yes
Osf Tropical Storm Ind Yes
Osf Heavy Rains Ind Yes
Preparer Name L***** J* D********
Preparer Title Compliance Coordinator Ii
Preparer Email L***************@c****************.com
Preparer Telephone 713-967-7325
Preparer Fax 713-967-7307
Authorizer Name S**** Y********
Authorizer Title Regional Operations Director
Authorizer Telephone 713-207-5700
Authorizer Email S**************@c****************.com
Narrative During hurricane/tropical storm harvey, portions of south texas including the beaumont/vidor area experienced record flooding. During this time that included high flood waters and severe turbulence in the neches river the incident described in this report occurred. Centerpoint energy is aware of two large ships and several tugboats near the location where centerpoint energy's pipeline was damaged.

All rights reserved. Copyright © by ClearPHMSA