GTG incident on 2017-06-29 — TX

Operator
Texas Gas Transmission, Llc
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2017-06-29 10:20
Report number
Location
TX
Narrative
A relief valve at the columbia compressor station prematurely activated. Maop of 810 psig was exceeded; recorded pressure of 820 psig was documented. Maop exceedance was not 110% or more. Relief valve was set at 843 psig. The operator at the station worked with controller to shut in the valve. The relief valve will be removed.
Detailed record list
Report Received Date
2017-07-27 00:00:00
Iyear
2017
Report Number
20170063
Supplemental Number
17390
Report Type
Original Final
Operator Id
Name
Texas Gas Transmission, Llc
Operator Street Address
9 Greenway Plaza Suite 2800
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77046
Local Datetime
2017-06-29 10:20:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2017-06-29 11:15:00
Commodity Released Type
Natural Gas
Unintentional Release
26710
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
No
Shutdown Explain
This Event Caused No Interruption In Service.
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2017-06-29 10:20:00
On Site Datetime
2017-06-29 10:57:00
On Off Shore
Onshore
Onshore State Abbreviation
La
Onshore Postal Code
71418
Onshore City Name
Columbia
Onshore County Name
Caldwell
Designated Location
Milepost
Designated Name
59.4155
Pipe Fac Name
Columbia Compressor Station
Segment Name
Bae
Federal
No
Location Type
Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Compressor Station Equipment And Piping
Item Involved
Valve
Valve Type
Relief Valve
Installation Year
1968
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Relief Valve Vented Prematurely.
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
157
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
86540
Est Cost Intentional Release
0
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Other
0
Prpty
86540
Accident Psig
820
Mop Psig
810
Mop Cfr Section
192.619(A)(1)
Accident Pressure
Pressure Exceeded Maop, But Did Not Exceed The Applicable Allowance In 192.201
Pressure Restriction Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Accident Identifier
Notification From Public
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Additional Overpressure Ind
Yes
Preparer Name
S****** M********
Preparer Title
Pa Oq And Event Support Program Leader
Preparer Email
S****************@b*****.com
Preparer Telephone
2706886357
Preparer Fax
2706886948
Authorizer Name
J****** B* M******
Authorizer Title
Manager Codes And Standards
Authorizer Telephone
2706886361
Authorizer Email
J***********@b*****.com
Narrative
A relief valve at the columbia compressor station prematurely activated. Maop of 810 psig was exceeded; recorded pressure of 820 psig was documented. Maop exceedance was not 110% or more. Relief valve was set at 843 psig. The operator at the station worked with controller to shut in the valve. The relief valve will be removed.
Report Received Date 2017-07-27 00:00:00
Iyear 2017
Report Number 20170063
Supplemental Number 17390
Report Type Original Final
Operator Id 19270 PHMSA Enforcement
Name Texas Gas Transmission, Llc
Operator Street Address 9 Greenway Plaza Suite 2800
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77046
Local Datetime 2017-06-29 10:20:00
Location Latitude 32.158717 Google Maps OpenStreetMap
Location Longitude -92.092431 Google Maps OpenStreetMap
Nrc Rpt Num 1182633 NRC Report How to search
Nrc Rpt Datetime 2017-06-29 11:15:00
Commodity Released Type Natural Gas
Unintentional Release 26710
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind No
Shutdown Explain This Event Caused No Interruption In Service.
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2017-06-29 10:20:00
On Site Datetime 2017-06-29 10:57:00
On Off Shore Onshore
Onshore State Abbreviation La
Onshore Postal Code 71418
Onshore City Name Columbia
Onshore County Name Caldwell
Designated Location Milepost
Designated Name 59.4155
Pipe Fac Name Columbia Compressor Station
Segment Name Bae
Federal No
Location Type Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Compressor Station Equipment And Piping
Item Involved Valve
Valve Type Relief Valve
Installation Year 1968
Material Involved Carbon Steel
Release Type Other
Release Type Details Relief Valve Vented Prematurely.
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 157
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 86540
Est Cost Intentional Release 0
Est Cost Prop Damage 0
Est Cost Emergency 0
Est Cost Other 0
Prpty 86540
Accident Psig 820
Mop Psig 810
Mop Cfr Section 192.619(A)(1) View CFR 49 §192
Accident Pressure Pressure Exceeded Maop, But Did Not Exceed The Applicable Allowance In 192.201
Pressure Restriction Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Accident Identifier Notification From Public
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Malfunction Of Control/relief Equipment
Eq Failure Type Malfunction Of Control/relief Equipment
Relief Valve Ind Yes
Additional Overpressure Ind Yes
Preparer Name S****** M********
Preparer Title Pa Oq And Event Support Program Leader
Preparer Email S****************@b*****.com
Preparer Telephone 2706886357
Preparer Fax 2706886948
Authorizer Name J****** B* M******
Authorizer Title Manager Codes And Standards
Authorizer Telephone 2706886361
Authorizer Email J***********@b*****.com
Narrative A relief valve at the columbia compressor station prematurely activated. Maop of 810 psig was exceeded; recorded pressure of 820 psig was documented. Maop exceedance was not 110% or more. Relief valve was set at 843 psig. The operator at the station worked with controller to shut in the valve. The relief valve will be removed.

All rights reserved. Copyright © by ClearPHMSA