Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2017-01-25 — CA
Operator
Pacific Gas & Electric Co
Cause
Equipment Failure
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,862,000
Incident datetime
2017-01-25 09:22
Report number
Location
CA, SACRAMENTO
Narrative
On january 25, 2017 at 0922 hours, pg&e detected an overpressure event with the scada system near 1717 dornie circle, folsom. The regulator and monitor valves at pg&e's regulator station a-55 near the intersection of east bidwell street and oak avenue parkway in folsom failed to achieve lock-up, resulting in an overpressure event. The maop plus allowable was exceeded at 0941 hours. Pg&e crews arrived on-site at 1020 hours. When pg&e crews arrived on-site, the pressure was reading at 114 psig. The crew shut in two reg stations to reduce pressure and the pressure returned to normal at 1107 hours. Gas service representatives (gsrs), gpom crews, m&c crews, and leak survey personnel were dispatched and staged to perform leak survey, inspect filters and reg stations, and perform any necessary repairs. M&c completed repairs on all grade 1 leaks identified from the post-incident leak survey and the remaining leaks are scheduled for recheck/repairs in accordance with pg&e procedures. The cause of the incident is equipment failure due to pipeline debris from pigging operations. There were no reported injuries, fatalities or ignition. Cng was mobilized to support peak conditions. There was no customer impact. This incident is being reported to the cpuc due to an unplanned event resulting in an overpressure event maop plus allowable buildup. At 1500 hours, it was determined that costs associated with the incident would exceed $50,000. At 1520 hours, the DOT was notified due to estimated costs exceeding $50,000.
Detailed record list
Occurred At
2017-01-25 09:22:00
Year
2017
Report Received Date
2017-02-23 00:00:00
Iyear
2017.0
Report Number
20170023.0
Supplemental Number
16745.0
Report Type
Supplemental Final
Operator Id
15007
Name
Pacific Gas & Electric Co
Operator Street Address
6121 Bollinger Canyon Rd.
Operator City Name
San Ramon
Operator State Abbreviation
CA
Operator Postal Code
94583
Local Datetime
2017-01-25 09:22:00
Location Street Address
East Bidwell St And Oak Ave Parkway
Location City Name
Folsom
Location County Name
Sacramento
Location State Abbreviation
CA
Location Postal Code
95630
Location Latitude
38.664614
Location Longitude
-121.13603
Nrc Rpt Datetime
2017-01-25 15:20:00
Nrc Rpt Num
1169517
Commodity Released Type
Natural Gas
Unintentional Release
40.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2017-01-25 09:22:00
On Site Datetime
2017-01-25 10:20:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
In Underground Enclosed Space (E.g. Vault)
Crossing
No
Pipe Facility Type
Investor Owned
System Part Involved
District Regulator/metering Station
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Other
Release Type Details
Over Pressure Event
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
1862000.0
Est Cost Emergency
1833000.0
Est Cost Other
0.0
Est Cost Unintentional Release
150.0
Prpty
3695150.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
114.0
Normal Psig
54.0
Mop Psig
60.0
Accident Pressure
Pressure Exceeded The Applicable Allowance In 192.201
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Control room operated as intended
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Pressure Regulator Ind
Yes
Preparer Name
S****** R****
Preparer Title
Gas Engineer
Preparer Email
S***@p**.com
Preparer Telephone
925-413-7311
Authorizer Name
S**** R*******
Authorizer Title
Manager Regulatory Compliance
Authorizer Telephone
925-328-5776
Authorizer Email
G***@p**.com
Narrative
On january 25, 2017 at 0922 hours, pg&e detected an overpressure event with the scada system near 1717 dornie circle, folsom. The regulator and monitor valves at pg&e's regulator station a-55 near the intersection of east bidwell street and oak avenue parkway in folsom failed to achieve lock-up, resulting in an overpressure event. The maop plus allowable was exceeded at 0941 hours. Pg&e crews arrived on-site at 1020 hours. When pg&e crews arrived on-site, the pressure was reading at 114 psig. The crew shut in two reg stations to reduce pressure and the pressure returned to normal at 1107 hours. Gas service representatives (gsrs), gpom crews, m&c crews, and leak survey personnel were dispatched and staged to perform leak survey, inspect filters and reg stations, and perform any necessary repairs. M&c completed repairs on all grade 1 leaks identified from the post-incident leak survey and the remaining leaks are scheduled for recheck/repairs in accordance with pg&e procedures. The cause of the incident is equipment failure due to pipeline debris from pigging operations. There were no reported injuries, fatalities or ignition. Cng was mobilized to support peak conditions. There was no customer impact. This incident is being reported to the cpuc due to an unplanned event resulting in an overpressure event maop plus allowable buildup. At 1500 hours, it was determined that costs associated with the incident would exceed $50,000. At 1520 hours, the DOT was notified due to estimated costs exceeding $50,000.
| Occurred At | 2017-01-25 09:22:00 |
|---|---|
| Year | 2017 |
| Report Received Date | 2017-02-23 00:00:00 |
| Iyear | 2017.0 |
| Report Number | 20170023.0 |
| Supplemental Number | 16745.0 |
| Report Type | Supplemental Final |
| Operator Id | 15007 PHMSA Enforcement |
| Name | Pacific Gas & Electric Co |
| Operator Street Address | 6121 Bollinger Canyon Rd. |
| Operator City Name | San Ramon |
| Operator State Abbreviation | CA |
| Operator Postal Code | 94583 |
| Local Datetime | 2017-01-25 09:22:00 |
| Location Street Address | East Bidwell St And Oak Ave Parkway |
| Location City Name | Folsom |
| Location County Name | Sacramento |
| Location State Abbreviation | CA |
| Location Postal Code | 95630 |
| Location Latitude | 38.664614 Google Maps OpenStreetMap |
| Location Longitude | -121.13603 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2017-01-25 15:20:00 |
| Nrc Rpt Num | 1169517 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 40.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2017-01-25 09:22:00 |
| On Site Datetime | 2017-01-25 10:20:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | In Underground Enclosed Space (E.g. Vault) |
| Crossing | No |
| Pipe Facility Type | Investor Owned |
| System Part Involved | District Regulator/metering Station |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Unknown |
| Release Type | Other |
| Release Type Details | Over Pressure Event |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 1862000.0 |
| Est Cost Emergency | 1833000.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 150.0 |
| Prpty | 3695150.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 114.0 |
| Normal Psig | 54.0 |
| Mop Psig | 60.0 |
| Accident Pressure | Pressure Exceeded The Applicable Allowance In 192.201 |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Accident Identifier | Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations) |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Control room operated as intended |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Pressure Regulator Ind | Yes |
| Preparer Name | S****** R**** |
| Preparer Title | Gas Engineer |
| Preparer Email | S***@p**.com |
| Preparer Telephone | 925-413-7311 |
| Authorizer Name | S**** R******* |
| Authorizer Title | Manager Regulatory Compliance |
| Authorizer Telephone | 925-328-5776 |
| Authorizer Email | G***@p**.com |
| Narrative | On january 25, 2017 at 0922 hours, pg&e detected an overpressure event with the scada system near 1717 dornie circle, folsom. The regulator and monitor valves at pg&e's regulator station a-55 near the intersection of east bidwell street and oak avenue parkway in folsom failed to achieve lock-up, resulting in an overpressure event. The maop plus allowable was exceeded at 0941 hours. Pg&e crews arrived on-site at 1020 hours. When pg&e crews arrived on-site, the pressure was reading at 114 psig. The crew shut in two reg stations to reduce pressure and the pressure returned to normal at 1107 hours. Gas service representatives (gsrs), gpom crews, m&c crews, and leak survey personnel were dispatched and staged to perform leak survey, inspect filters and reg stations, and perform any necessary repairs. M&c completed repairs on all grade 1 leaks identified from the post-incident leak survey and the remaining leaks are scheduled for recheck/repairs in accordance with pg&e procedures. The cause of the incident is equipment failure due to pipeline debris from pigging operations. There were no reported injuries, fatalities or ignition. Cng was mobilized to support peak conditions. There was no customer impact. This incident is being reported to the cpuc due to an unplanned event resulting in an overpressure event maop plus allowable buildup. At 1500 hours, it was determined that costs associated with the incident would exceed $50,000. At 1520 hours, the DOT was notified due to estimated costs exceeding $50,000. |