Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2016-12-02 — OH
Operator
Marathon Pipe Line Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$151,175
Incident datetime
2016-12-02 15:18
Report number
Location
OH
Narrative
A release was discovered by mpl personnel who were on-site for other non-related project work. Approximately 4 ounces of crude oil leaked from between the yoke tube and valve bonnet of roxana station valve ss1 due to a valve packing failure. Mpl personnel attempted to repack the valve but were unsuccessful and therefore, the valve was replaced. The line was later returned to normal operations. Mpl completed its investigation into this release on january 26, 2017. As a result of the investigation, it was determined that a rough finish specification on the valve stem contributed to a quicker than expected deterioration of the valve seals. It was also determined that valve repacking was hindered by a small diameter packing vent which inhibited packing flow. The inhibited flow resulted in a buildup of pressure in the packing box while being repacked which caused the valve stem seals to fail. Part d.8. Was updated to include final costs. Part g.6. Was updated to include investigation results.
Detailed record list
Report Received Date
2016-12-28 00:00:00
Iyear
2016
Report Number
20160430
Supplemental Number
22085
Report Type
Supplemental Final
Operator Id
32147
Name
Marathon Pipe Line Llc
Operator Street Address
539 South Main Street
Operator City Name
Findlay
Operator State Abbreviation
OH
Operator Postal Code
45840
Local Datetime
2016-12-02 15:18:00
Location Latitude
38.827249
Location Longitude
-90.086211
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.1
Recovered Bbls
0.1
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2016-12-02 15:18:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Already Shutdown By Schedule.
On Site Datetime
2016-12-02 15:18:00
Nrc Rpt Datetime
2016-12-02 17:37:00
Nrc Rpt Num
1165443
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Roxana Station
Segment Name
Facility Piping
Onshore State Abbreviation
Il
Onshore Postal Code
62048
Onshore City Name
Hartford
Onshore County Name
Madison
Designated Location
Survey Station No.
Designated Name
Facility
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Valve Mainline Type
Gate
Valve Manufacturer
Epi
Installation Year
2011
Manufactured Year
2011
Material Involved
Material Other Than Carbon Steel
Material Details
Cast Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
151175
Est Cost Emergency
1640
Est Cost Environmental
0
Est Cost Other
0
Prpty
152815
Accident Psig
60
Mop Psig
720
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Seal (Not Pump Seal) Or Packing
Eq Additional Other Ind
Yes
Eq Additional Other Details
Small Packing Vent Diameter Inhibited Packing Flow
Preparer Name
T****** H******
Preparer Title
Hes Professional
Preparer Email
T********@m****************.com
Preparer Telephone
419-421-2121
Prepared Date
2017-02-13 00:00:00
Authorizer Name
R****** W* B*****
Authorizer Telephone
419-421-2121
Authorizer Title
Regulatory And Compliance Supervisor
Authorizer Email
R*******@m****************.com
Narrative
A release was discovered by mpl personnel who were on-site for other non-related project work. Approximately 4 ounces of crude oil leaked from between the yoke tube and valve bonnet of roxana station valve ss1 due to a valve packing failure. Mpl personnel attempted to repack the valve but were unsuccessful and therefore, the valve was replaced. The line was later returned to normal operations. Mpl completed its investigation into this release on january 26, 2017. As a result of the investigation, it was determined that a rough finish specification on the valve stem contributed to a quicker than expected deterioration of the valve seals. It was also determined that valve repacking was hindered by a small diameter packing vent which inhibited packing flow. The inhibited flow resulted in a buildup of pressure in the packing box while being repacked which caused the valve stem seals to fail. Part d.8. Was updated to include final costs. Part g.6. Was updated to include investigation results.
| Report Received Date | 2016-12-28 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160430 |
| Supplemental Number | 22085 |
| Report Type | Supplemental Final |
| Operator Id | 32147 PHMSA Enforcement |
| Name | Marathon Pipe Line Llc |
| Operator Street Address | 539 South Main Street |
| Operator City Name | Findlay |
| Operator State Abbreviation | OH |
| Operator Postal Code | 45840 |
| Local Datetime | 2016-12-02 15:18:00 |
| Location Latitude | 38.827249 Google Maps OpenStreetMap |
| Location Longitude | -90.086211 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.1 |
| Recovered Bbls | 0.1 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2016-12-02 15:18:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Already Shutdown By Schedule. |
| On Site Datetime | 2016-12-02 15:18:00 |
| Nrc Rpt Datetime | 2016-12-02 17:37:00 |
| Nrc Rpt Num | 1165443 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Roxana Station |
| Segment Name | Facility Piping |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 62048 |
| Onshore City Name | Hartford |
| Onshore County Name | Madison |
| Designated Location | Survey Station No. |
| Designated Name | Facility |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Valve Mainline Type | Gate |
| Valve Manufacturer | Epi |
| Installation Year | 2011 |
| Manufactured Year | 2011 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Cast Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 151175 |
| Est Cost Emergency | 1640 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 152815 |
| Accident Psig | 60 |
| Mop Psig | 720 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Seal (Not Pump Seal) Or Packing |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Small Packing Vent Diameter Inhibited Packing Flow |
| Preparer Name | T****** H****** |
| Preparer Title | Hes Professional |
| Preparer Email | T********@m****************.com |
| Preparer Telephone | 419-421-2121 |
| Prepared Date | 2017-02-13 00:00:00 |
| Authorizer Name | R****** W* B***** |
| Authorizer Telephone | 419-421-2121 |
| Authorizer Title | Regulatory And Compliance Supervisor |
| Authorizer Email | R*******@m****************.com |
| Narrative | A release was discovered by mpl personnel who were on-site for other non-related project work. Approximately 4 ounces of crude oil leaked from between the yoke tube and valve bonnet of roxana station valve ss1 due to a valve packing failure. Mpl personnel attempted to repack the valve but were unsuccessful and therefore, the valve was replaced. The line was later returned to normal operations. Mpl completed its investigation into this release on january 26, 2017. As a result of the investigation, it was determined that a rough finish specification on the valve stem contributed to a quicker than expected deterioration of the valve seals. It was also determined that valve repacking was hindered by a small diameter packing vent which inhibited packing flow. The inhibited flow resulted in a buildup of pressure in the packing box while being repacked which caused the valve stem seals to fail. Part d.8. Was updated to include final costs. Part g.6. Was updated to include investigation results. |