HL incident on 2016-12-01 — TX

Operator
Exxonmobil Pipeline Co
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$72,000
Incident datetime
2016-12-01 10:50
Report number
Location
TX
Narrative
At approximately midnight, the occ controller observed line shortages on lv02 (lola system) and contacted the longview field supervisor (fls). The fls sent a technician to finney to investigate. The technician swapped meter 1 and 3 to trouble shoot line balance. Occ controller did not observe a correct in line balance. The fls directed the occ controller to shut down the talco injection to see if the talco meter was the problem. After 15 minutes, occ checked the line balance. The line imbalance continued, so the fls directed the occ controller to shut down the pump at texoma and isolate the entire line. The fls decided to investigate the issue after sunrise for safety purposes. The technicians started at finney and walked the line back to longview. The air patrol surveillance was called out and started checking the line. The air surveillance patrol flew over longview. The longview bkep technician heard the airplane circle and went outside to check what was happening. He then saw the pool of oil near the meter skid and notified the empco longview fls. Shortly thereafter the air patrol reported the release to the empco longview fls. The fls called the other technicians to return to longview. They inspected the site, saw the oil, and contacted omi environmental solutions (contracted spill response). Update 12/17/18 incident time changed from 1050 to 0000 on december 1 based on scada indication of imbalance. Update 12/17/18 part 5, 5.1 updated selection to include metallurgical. Update 12/17/18 - section 14.B.: this pipeline was sold on february 1 2017, and was sold prior to start up. Update 1/24/19 - section g5, number 6. With the most recent hydrotest pressure from 2016.
Detailed record list
Report Received Date
2016-12-21 00:00:00
Iyear
2016
Report Number
20160421
Supplemental Number
31554
Report Type
Supplemental Final
Operator Id
Name
Exxonmobil Pipeline Co
Operator Street Address
22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name
Spring
Operator State Abbreviation
TX
Operator Postal Code
77389
Local Datetime
2016-12-01 00:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
500
Recovered Bbls
500
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2016-12-01 10:50:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-12-01 01:26:00
Still Shutdown Ind
Yes
On Site Datetime
2016-12-01 11:00:00
Nrc Rpt Datetime
2016-12-01 11:20:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Longview Station
Segment Name
Texoma To Finney
Onshore State Abbreviation
Tx
Onshore Postal Code
75602
Onshore City Name
Longview
Onshore County Name
Gregg
Designated Location
Survey Station No.
Designated Name
Longview Sta
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Weld Subtype
Other Butt Weld
Installation Year
2016
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
20000
Est Cost Prop Damage
72000
Est Cost Emergency
900000
Est Cost Environmental
140000
Est Cost Other
0
Prpty
1132000
Accident Psig
315
Mop Psig
961
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller identified issues with the pipeline based on scada information and involved field operations personnel to assist with troubleshooting. The pipeline was shutdown when troubleshooting measures were ineffective.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related
Yes
Failure Subtype
Mechanical Vibration
Pwf Additional Other Ind
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2016
Hydrtst Most Rcnt Pressure
1850
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
J** M*********
Preparer Title
Pipeline Safety Advisor
Preparer Email
J*****************@e*********.com
Preparer Telephone
8326246121
Prepared Date
2019-01-28 00:00:00
Authorizer Name
C******* B* H********
Authorizer Telephone
8326247920
Authorizer Title
Empco Sshe Manager
Authorizer Email
C*******************@e*********.com
Narrative
At approximately midnight, the occ controller observed line shortages on lv02 (lola system) and contacted the longview field supervisor (fls). The fls sent a technician to finney to investigate. The technician swapped meter 1 and 3 to trouble shoot line balance. Occ controller did not observe a correct in line balance. The fls directed the occ controller to shut down the talco injection to see if the talco meter was the problem. After 15 minutes, occ checked the line balance. The line imbalance continued, so the fls directed the occ controller to shut down the pump at texoma and isolate the entire line. The fls decided to investigate the issue after sunrise for safety purposes. The technicians started at finney and walked the line back to longview. The air patrol surveillance was called out and started checking the line. The air surveillance patrol flew over longview. The longview bkep technician heard the airplane circle and went outside to check what was happening. He then saw the pool of oil near the meter skid and notified the empco longview fls. Shortly thereafter the air patrol reported the release to the empco longview fls. The fls called the other technicians to return to longview. They inspected the site, saw the oil, and contacted omi environmental solutions (contracted spill response). Update 12/17/18 incident time changed from 1050 to 0000 on december 1 based on scada indication of imbalance. Update 12/17/18 part 5, 5.1 updated selection to include metallurgical. Update 12/17/18 - section 14.B.: this pipeline was sold on february 1 2017, and was sold prior to start up. Update 1/24/19 - section g5, number 6. With the most recent hydrotest pressure from 2016.
Report Received Date 2016-12-21 00:00:00
Iyear 2016
Report Number 20160421
Supplemental Number 31554
Report Type Supplemental Final
Operator Id 4906 PHMSA Enforcement
Name Exxonmobil Pipeline Co
Operator Street Address 22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name Spring
Operator State Abbreviation TX
Operator Postal Code 77389
Local Datetime 2016-12-01 00:00:00
Location Latitude 32.473589 Google Maps OpenStreetMap
Location Longitude -94.718594 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 500
Recovered Bbls 500
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime 2016-12-01 10:50:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2016-12-01 01:26:00
Still Shutdown Ind Yes
On Site Datetime 2016-12-01 11:00:00
Nrc Rpt Datetime 2016-12-01 11:20:00
Nrc Rpt Num 1165326 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Longview Station
Segment Name Texoma To Finney
Onshore State Abbreviation Tx
Onshore Postal Code 75602
Onshore City Name Longview
Onshore County Name Gregg
Designated Location Survey Station No.
Designated Name Longview Sta
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Weld, Including Heat-Affected Zone
Weld Subtype Other Butt Weld
Installation Year 2016
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Vegetation Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 20000
Est Cost Prop Damage 72000
Est Cost Emergency 900000
Est Cost Environmental 140000
Est Cost Other 0
Prpty 1132000
Accident Psig 315
Mop Psig 961
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The controller identified issues with the pipeline based on scada information and involved field operations personnel to assist with troubleshooting. The pipeline was shutdown when troubleshooting measures were ineffective.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Metallurgical Ind Yes
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related Yes
Failure Subtype Mechanical Vibration
Pwf Additional Other Ind Yes
Collected Data Ind No
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2016
Hydrtst Most Rcnt Pressure 1850
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name J** M*********
Preparer Title Pipeline Safety Advisor
Preparer Email J*****************@e*********.com
Preparer Telephone 8326246121
Prepared Date 2019-01-28 00:00:00
Authorizer Name C******* B* H********
Authorizer Telephone 8326247920
Authorizer Title Empco Sshe Manager
Authorizer Email C*******************@e*********.com
Narrative At approximately midnight, the occ controller observed line shortages on lv02 (lola system) and contacted the longview field supervisor (fls). The fls sent a technician to finney to investigate. The technician swapped meter 1 and 3 to trouble shoot line balance. Occ controller did not observe a correct in line balance. The fls directed the occ controller to shut down the talco injection to see if the talco meter was the problem. After 15 minutes, occ checked the line balance. The line imbalance continued, so the fls directed the occ controller to shut down the pump at texoma and isolate the entire line. The fls decided to investigate the issue after sunrise for safety purposes. The technicians started at finney and walked the line back to longview. The air patrol surveillance was called out and started checking the line. The air surveillance patrol flew over longview. The longview bkep technician heard the airplane circle and went outside to check what was happening. He then saw the pool of oil near the meter skid and notified the empco longview fls. Shortly thereafter the air patrol reported the release to the empco longview fls. The fls called the other technicians to return to longview. They inspected the site, saw the oil, and contacted omi environmental solutions (contracted spill response). Update 12/17/18 incident time changed from 1050 to 0000 on december 1 based on scada indication of imbalance. Update 12/17/18 part 5, 5.1 updated selection to include metallurgical. Update 12/17/18 - section 14.B.: this pipeline was sold on february 1 2017, and was sold prior to start up. Update 1/24/19 - section g5, number 6. With the most recent hydrotest pressure from 2016.

All rights reserved. Copyright © by ClearPHMSA