Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2016-11-21 — TX
Operator
Kinder Morgan Co2 Co. Lp
Cause
Equipment Failure
Commodity
Co2 (Carbon Dioxide)
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$5,000
Incident datetime
2016-11-21 19:30
Report number
Location
TX
Narrative
On 11/21/2016, operations personnel were blowing down the valve on the launcher of the western gaines pipeline. The barrel of the launcher was blown down; however, the upstream valve seal would not hold. Operations added sealant and exercised the valve to try to get a double block and bleed. While the valve was being exercised, CO2 started leaking through the upper chamber. A valve service contractor came on-site and injected a sealant to stop the leak.
Detailed record list
Report Received Date
2016-12-19 00:00:00
Iyear
2016
Report Number
20160419
Supplemental Number
21973
Report Type
Original Final
Operator Id
31555
Name
Kinder Morgan Co2 Co. Lp
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2016-11-21 19:30:00
Location Latitude
32.78448
Location Longitude
-102.77773
Commodity Released Type
Co2 (Carbon Dioxide)
Unintentional Release Bbls
0.38
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2016-11-21 19:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Leak Occurred In A Secure Facility. Repair Plan Did Not Require Shutdown.
On Site Datetime
2016-11-21 19:30:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
West Seminole Station
Segment Name
Western Gaines Pipeline
Onshore State Abbreviation
Tx
Onshore Postal Code
79360
Onshore City Name
Seminole
Onshore County Name
Gaines
Designated Location
Milepost/valve Station
Designated Name
Mp 0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2014
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1
Est Cost Prop Damage
5000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
5001
Accident Psig
1932
Mop Psig
2220
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
34848
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Control room operations were normal. The valve leaked as it was being exercised by field operations personnel.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
O-Ring
Additional Defect Ind
Yes
Preparer Name
A**** Z*****
Preparer Title
Manager-Regulatory Compliance
Preparer Email
A***********@k***********.com
Preparer Telephone
713-369-9512
Preparer Fax
303-984-3417
Prepared Date
2016-12-19 00:00:00
Authorizer Name
K****** H* H***** J**
Authorizer Telephone
713-369-9113
Authorizer Title
Vice President-Source And Transportation
Authorizer Email
K*********@k***********.com
Narrative
On 11/21/2016, operations personnel were blowing down the valve on the launcher of the western gaines pipeline. The barrel of the launcher was blown down; however, the upstream valve seal would not hold. Operations added sealant and exercised the valve to try to get a double block and bleed. While the valve was being exercised, CO2 started leaking through the upper chamber. A valve service contractor came on-site and injected a sealant to stop the leak.
| Report Received Date | 2016-12-19 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160419 |
| Supplemental Number | 21973 |
| Report Type | Original Final |
| Operator Id | 31555 PHMSA Enforcement |
| Name | Kinder Morgan Co2 Co. Lp |
| Operator Street Address | 1001 Louisiana St, Suite 1000 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2016-11-21 19:30:00 |
| Location Latitude | 32.78448 Google Maps OpenStreetMap |
| Location Longitude | -102.77773 Google Maps OpenStreetMap |
| Commodity Released Type | Co2 (Carbon Dioxide) |
| Unintentional Release Bbls | 0.38 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2016-11-21 19:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Leak Occurred In A Secure Facility. Repair Plan Did Not Require Shutdown. |
| On Site Datetime | 2016-11-21 19:30:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | West Seminole Station |
| Segment Name | Western Gaines Pipeline |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79360 |
| Onshore City Name | Seminole |
| Onshore County Name | Gaines |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2014 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1 |
| Est Cost Prop Damage | 5000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 5001 |
| Accident Psig | 1932 |
| Mop Psig | 2220 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 34848 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Control room operations were normal. The valve leaked as it was being exercised by field operations personnel. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | O-Ring |
| Additional Defect Ind | Yes |
| Preparer Name | A**** Z***** |
| Preparer Title | Manager-Regulatory Compliance |
| Preparer Email | A***********@k***********.com |
| Preparer Telephone | 713-369-9512 |
| Preparer Fax | 303-984-3417 |
| Prepared Date | 2016-12-19 00:00:00 |
| Authorizer Name | K****** H* H***** J** |
| Authorizer Telephone | 713-369-9113 |
| Authorizer Title | Vice President-Source And Transportation |
| Authorizer Email | K*********@k***********.com |
| Narrative | On 11/21/2016, operations personnel were blowing down the valve on the launcher of the western gaines pipeline. The barrel of the launcher was blown down; however, the upstream valve seal would not hold. Operations added sealant and exercised the valve to try to get a double block and bleed. While the valve was being exercised, CO2 started leaking through the upper chamber. A valve service contractor came on-site and injected a sealant to stop the leak. |