HL incident on 2016-11-29 — TX
Operator
Enterprise Products Operating Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$955,454
Incident datetime
2016-11-29 18:29
Report number
Location
TX
Narrative
(updated 12/10/2018) at approximately 18:27 on 11/29/2016, enterprise's control room noticed a pressure drop on the east red pipeline, line id 603. At approximately 18:29 a member of the public called pipeline control to notify them of a fire in the vicinity of an enterprise pipeline near mp 192.� the line was shut down at 18:30 and the rupture segment was blocked in by pipeline control at valve locations mp 176.75 and mp 198.64.� � at approximately 18:36 a remote valve was closed at mp 190.06. At approximately 19:11 a manual valve was closed at mp 193.57. These valve closures were performed to further isolate the line. � operations arrived at the rupture location at approximately 19:26 and confirmed that there was a rupture and fire on the east red pipeline. The fire was monitored as it continued to burn throughout the night until the fire terminated at approximately 19:54 on 11/30/2016. The emergency phase was declared over at approximately 20:00 on 11/30. � after assessments were made, 150 feet of the line was replaced on 12/5/2016 and the line was restarted after approval from PHMSA on 12/7 at approximately 12:58. � a metallurgical analysis was performed at kiefner and associates, inc. (kiefner) to determine the cause of the failure and for evaluation of the pipe material properties. The metallurgical analysis determined that the pipeline �rupture was due to external near-neutral stress corrosion cracking (scc) along and adjacent to the erw seam. The scc was approximately 14 inches long with a maximum depth of 0.100 inch, or about 50% of the wall thickness at the location of the erw seam. � enterprise conducted hydrostatic testing of the line segment where the rupture occurred in 2017. The test results were reviewed with PHMSA central region and pipe line segment was returned to routine operations without restrictions.
Detailed record list
Report Received Date
2016-12-19 00:00:00
Iyear
2016
Report Number
20160418
Supplemental Number
31437
Report Type
Supplemental Final
Operator Id
31618
Name
Enterprise Products Operating Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2016-11-29 18:27:00
Location Latitude
39.40797563
Location Longitude
-94.69171307
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Ethane/propane
Unintentional Release Bbls
5000
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2016-11-29 18:29:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-11-29 18:30:00
Restart Datetime
2016-12-07 12:58:00
On Site Datetime
2016-11-29 19:26:00
Nrc Rpt Datetime
2016-11-29 19:57:00
Nrc Rpt Num
1165213
Ignite Ind
Yes
Explode Ind
Yes
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
East Red
Segment Name
603
Onshore State Abbreviation
Mo
Onshore Postal Code
64709
Onshore City Name
Platte City
Onshore County Name
Platte
Designated Location
Milepost/valve Station
Designated Name
Mp 192
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
54
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Pipe Wall Thickness
0.188
Pipe Smys
52000
Pipe Specification
Api-5-L
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Republic Steel
Pipe Coating Type
Other
Pipe Coating Details
Polyethylene Tape
Installation Year
1970
Manufactured Year
1970
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
33.8
Rupture Length
186
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
112980
Est Cost Prop Damage
955454
Est Cost Emergency
2500
Est Cost Environmental
7500
Est Cost Other
25000
Est Cost Other Details
Failure Analysis.
Prpty
1103434
Accident Psig
1200
Mop Psig
1300
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
115588
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The controller was not a contributing factor.
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Material Failure Of Pipe Or Weld
Cause Details
Environmental Cracking-Related
Field Exam Ind
Yes
Metallurgical Ind
Yes
Failure Type
Environmental Cracking-Related
Stress Subtype
Stress Corrosion Cracking
Additional Crack Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Ultrasonic Ind
Yes
Geometry Deformation Ind
Yes
Axial Recent Year
2014
Ultrasonic Recent Year
2014
Geometry Recent Year
2014
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2002
Hydrtst Most Rcnt Pressure
1819
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
M****** B*****
Preparer Title
Pipeline Compliance Engineer
Preparer Email
M*******@e****.com
Preparer Telephone
346-306-9619
Prepared Date
2019-01-07 00:00:00
Authorizer Name
S**** D****
Authorizer Telephone
713-381-5585
Authorizer Title
Manager Compliance
Authorizer Email
S******@e****.com
Narrative
(updated 12/10/2018) at approximately 18:27 on 11/29/2016, enterprise's control room noticed a pressure drop on the east red pipeline, line id 603. At approximately 18:29 a member of the public called pipeline control to notify them of a fire in the vicinity of an enterprise pipeline near mp 192.� the line was shut down at 18:30 and the rupture segment was blocked in by pipeline control at valve locations mp 176.75 and mp 198.64.� � at approximately 18:36 a remote valve was closed at mp 190.06. At approximately 19:11 a manual valve was closed at mp 193.57. These valve closures were performed to further isolate the line. � operations arrived at the rupture location at approximately 19:26 and confirmed that there was a rupture and fire on the east red pipeline. The fire was monitored as it continued to burn throughout the night until the fire terminated at approximately 19:54 on 11/30/2016. The emergency phase was declared over at approximately 20:00 on 11/30. � after assessments were made, 150 feet of the line was replaced on 12/5/2016 and the line was restarted after approval from PHMSA on 12/7 at approximately 12:58. � a metallurgical analysis was performed at kiefner and associates, inc. (kiefner) to determine the cause of the failure and for evaluation of the pipe material properties. The metallurgical analysis determined that the pipeline �rupture was due to external near-neutral stress corrosion cracking (scc) along and adjacent to the erw seam. The scc was approximately 14 inches long with a maximum depth of 0.100 inch, or about 50% of the wall thickness at the location of the erw seam. � enterprise conducted hydrostatic testing of the line segment where the rupture occurred in 2017. The test results were reviewed with PHMSA central region and pipe line segment was returned to routine operations without restrictions.
| Report Received Date | 2016-12-19 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160418 |
| Supplemental Number | 31437 |
| Report Type | Supplemental Final |
| Operator Id | 31618 PHMSA Enforcement |
| Name | Enterprise Products Operating Llc |
| Operator Street Address | 1100 Louisiana Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2016-11-29 18:27:00 |
| Location Latitude | 39.40797563 Google Maps OpenStreetMap |
| Location Longitude | -94.69171307 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Other Hvl |
| Commodity Details | Ethane/propane |
| Unintentional Release Bbls | 5000 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2016-11-29 18:29:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-11-29 18:30:00 |
| Restart Datetime | 2016-12-07 12:58:00 |
| On Site Datetime | 2016-11-29 19:26:00 |
| Nrc Rpt Datetime | 2016-11-29 19:57:00 |
| Nrc Rpt Num | 1165213 NRC Report How to search |
| Ignite Ind | Yes |
| Explode Ind | Yes |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | East Red |
| Segment Name | 603 |
| Onshore State Abbreviation | Mo |
| Onshore Postal Code | 64709 |
| Onshore City Name | Platte City |
| Onshore County Name | Platte |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 192 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 54 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 10 |
| Pipe Wall Thickness | 0.188 |
| Pipe Smys | 52000 |
| Pipe Specification | Api-5-L |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Republic Steel |
| Pipe Coating Type | Other |
| Pipe Coating Details | Polyethylene Tape |
| Installation Year | 1970 |
| Manufactured Year | 1970 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Width | 33.8 |
| Rupture Length | 186 |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 112980 |
| Est Cost Prop Damage | 955454 |
| Est Cost Emergency | 2500 |
| Est Cost Environmental | 7500 |
| Est Cost Other | 25000 |
| Est Cost Other Details | Failure Analysis. |
| Prpty | 1103434 |
| Accident Psig | 1200 |
| Mop Psig | 1300 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 115588 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The controller was not a contributing factor. |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 1 |
| Num Employees Failed | 0 |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Environmental Cracking-Related |
| Field Exam Ind | Yes |
| Metallurgical Ind | Yes |
| Failure Type | Environmental Cracking-Related |
| Stress Subtype | Stress Corrosion Cracking |
| Additional Crack Ind | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Ultrasonic Ind | Yes |
| Geometry Deformation Ind | Yes |
| Axial Recent Year | 2014 |
| Ultrasonic Recent Year | 2014 |
| Geometry Recent Year | 2014 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2002 |
| Hydrtst Most Rcnt Pressure | 1819 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | M****** B***** |
| Preparer Title | Pipeline Compliance Engineer |
| Preparer Email | M*******@e****.com |
| Preparer Telephone | 346-306-9619 |
| Prepared Date | 2019-01-07 00:00:00 |
| Authorizer Name | S**** D**** |
| Authorizer Telephone | 713-381-5585 |
| Authorizer Title | Manager Compliance |
| Authorizer Email | S******@e****.com |
| Narrative | (updated 12/10/2018) at approximately 18:27 on 11/29/2016, enterprise's control room noticed a pressure drop on the east red pipeline, line id 603. At approximately 18:29 a member of the public called pipeline control to notify them of a fire in the vicinity of an enterprise pipeline near mp 192.� the line was shut down at 18:30 and the rupture segment was blocked in by pipeline control at valve locations mp 176.75 and mp 198.64.� � at approximately 18:36 a remote valve was closed at mp 190.06. At approximately 19:11 a manual valve was closed at mp 193.57. These valve closures were performed to further isolate the line. � operations arrived at the rupture location at approximately 19:26 and confirmed that there was a rupture and fire on the east red pipeline. The fire was monitored as it continued to burn throughout the night until the fire terminated at approximately 19:54 on 11/30/2016. The emergency phase was declared over at approximately 20:00 on 11/30. � after assessments were made, 150 feet of the line was replaced on 12/5/2016 and the line was restarted after approval from PHMSA on 12/7 at approximately 12:58. � a metallurgical analysis was performed at kiefner and associates, inc. (kiefner) to determine the cause of the failure and for evaluation of the pipe material properties. The metallurgical analysis determined that the pipeline �rupture was due to external near-neutral stress corrosion cracking (scc) along and adjacent to the erw seam. The scc was approximately 14 inches long with a maximum depth of 0.100 inch, or about 50% of the wall thickness at the location of the erw seam. � enterprise conducted hydrostatic testing of the line segment where the rupture occurred in 2017. The test results were reviewed with PHMSA central region and pipe line segment was returned to routine operations without restrictions. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA