Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2016-11-16 — KS
Operator
Jayhawk Pipeline Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,000
Incident datetime
2016-11-16 11:38
Report number
Location
KS
Narrative
This release was a result of the failure of an insulating gasket. The gasket was installed on may 9, 2016 by oq qualified jayhawk employees. Valve replacement was the only scope of work the crew was performing at the time. Per the incident investigation, the crew followed the existing procedures for bolted flanges, however, the installation of the new valve eliminated the valve's contact with the existing support. Jayhawk has completed the incident investigation and determined the root cause of the incident to be inadequate pipe support spacing with a possible contributing factor of inadequate flange torque. Jayhawk is in the process of evaluating mainline pipe support spacing and reviewing the need to incorporate torque specifications into existing procedures. The total product lost from the pipeline was 72 barrels. 41 barrels of free product were recovered and the 31 barrel balance was cleaned up with approximately 286 cubic yards of contaminated material being placed on an existing remediation plot.
Detailed record list
Report Received Date
2016-12-15 00:00:00
Iyear
2016
Report Number
20160417
Supplemental Number
23193
Report Type
Supplemental Final
Operator Id
9175
Name
Jayhawk Pipeline Llc
Operator Street Address
2000 S. Main
Operator City Name
Mcpherson
Operator State Abbreviation
KS
Operator Postal Code
67460
Local Datetime
2016-11-16 11:38:00
Location Latitude
38.340005
Location Longitude
-98.311832
Commodity Released Type
Crude Oil
Unintentional Release Bbls
72
Recovered Bbls
72
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2016-11-16 11:38:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-11-16 11:38:00
Restart Datetime
2016-11-16 16:20:00
On Site Datetime
2016-11-16 11:38:00
Nrc Rpt Datetime
2016-11-16 12:38:00
Nrc Rpt Num
1164284
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Chase Station
Segment Name
Chase To Mcpherson
Onshore State Abbreviation
Ks
Onshore Postal Code
67524
Onshore City Name
Not Within A Municipality
Onshore County Name
Rice
Designated Location
Milepost/valve Station
Designated Name
Chase Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Flange Assembly
Installation Year
2016
Material Involved
Material Other Than Carbon Steel
Material Details
Insulating Gasket
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
1178
Est Cost Prop Damage
1000
Est Cost Emergency
1500
Est Cost Environmental
2500
Est Cost Other
5000
Est Cost Other Details
Management Response, Travel, Phmsa Reporting, Etc.
Prpty
11178
Accident Psig
1023
Mop Psig
1293
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Leak did not trigger leak detection alarms nor provide adequate information to trigger the controller to take action, given the information available.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Additional Support Ind
Yes
Preparer Name
M******* S*****
Preparer Title
Manager Dot Compliance
Preparer Email
M**************@c*****.com
Preparer Telephone
4068619284
Preparer Fax
4066285393
Prepared Date
2018-02-28 00:00:00
Authorizer Name
R****** S* P*******
Authorizer Telephone
6202419240
Authorizer Title
Vp Pipelines And Terminals
Authorizer Email
R***************@c*****.com
Narrative
This release was a result of the failure of an insulating gasket. The gasket was installed on may 9, 2016 by oq qualified jayhawk employees. Valve replacement was the only scope of work the crew was performing at the time. Per the incident investigation, the crew followed the existing procedures for bolted flanges, however, the installation of the new valve eliminated the valve's contact with the existing support. Jayhawk has completed the incident investigation and determined the root cause of the incident to be inadequate pipe support spacing with a possible contributing factor of inadequate flange torque. Jayhawk is in the process of evaluating mainline pipe support spacing and reviewing the need to incorporate torque specifications into existing procedures. The total product lost from the pipeline was 72 barrels. 41 barrels of free product were recovered and the 31 barrel balance was cleaned up with approximately 286 cubic yards of contaminated material being placed on an existing remediation plot.
| Report Received Date | 2016-12-15 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160417 |
| Supplemental Number | 23193 |
| Report Type | Supplemental Final |
| Operator Id | 9175 PHMSA Enforcement |
| Name | Jayhawk Pipeline Llc |
| Operator Street Address | 2000 S. Main |
| Operator City Name | Mcpherson |
| Operator State Abbreviation | KS |
| Operator Postal Code | 67460 |
| Local Datetime | 2016-11-16 11:38:00 |
| Location Latitude | 38.340005 Google Maps OpenStreetMap |
| Location Longitude | -98.311832 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 72 |
| Recovered Bbls | 72 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2016-11-16 11:38:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-11-16 11:38:00 |
| Restart Datetime | 2016-11-16 16:20:00 |
| On Site Datetime | 2016-11-16 11:38:00 |
| Nrc Rpt Datetime | 2016-11-16 12:38:00 |
| Nrc Rpt Num | 1164284 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Chase Station |
| Segment Name | Chase To Mcpherson |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 67524 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Rice |
| Designated Location | Milepost/valve Station |
| Designated Name | Chase Station |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Flange Assembly |
| Installation Year | 2016 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Insulating Gasket |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 1178 |
| Est Cost Prop Damage | 1000 |
| Est Cost Emergency | 1500 |
| Est Cost Environmental | 2500 |
| Est Cost Other | 5000 |
| Est Cost Other Details | Management Response, Travel, Phmsa Reporting, Etc. |
| Prpty | 11178 |
| Accident Psig | 1023 |
| Mop Psig | 1293 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Leak did not trigger leak detection alarms nor provide adequate information to trigger the controller to take action, given the information available. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Gasket |
| Additional Support Ind | Yes |
| Preparer Name | M******* S***** |
| Preparer Title | Manager Dot Compliance |
| Preparer Email | M**************@c*****.com |
| Preparer Telephone | 4068619284 |
| Preparer Fax | 4066285393 |
| Prepared Date | 2018-02-28 00:00:00 |
| Authorizer Name | R****** S* P******* |
| Authorizer Telephone | 6202419240 |
| Authorizer Title | Vp Pipelines And Terminals |
| Authorizer Email | R***************@c*****.com |
| Narrative | This release was a result of the failure of an insulating gasket. The gasket was installed on may 9, 2016 by oq qualified jayhawk employees. Valve replacement was the only scope of work the crew was performing at the time. Per the incident investigation, the crew followed the existing procedures for bolted flanges, however, the installation of the new valve eliminated the valve's contact with the existing support. Jayhawk has completed the incident investigation and determined the root cause of the incident to be inadequate pipe support spacing with a possible contributing factor of inadequate flange torque. Jayhawk is in the process of evaluating mainline pipe support spacing and reviewing the need to incorporate torque specifications into existing procedures. The total product lost from the pipeline was 72 barrels. 41 barrels of free product were recovered and the 31 barrel balance was cleaned up with approximately 286 cubic yards of contaminated material being placed on an existing remediation plot. |