Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2016-10-21 — TX
Operator
Sunoco Pipeline L.p.
Cause
Other Outside Force Damage
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,600,000
Incident datetime
2016-10-21 03:02
Report number
Location
TX
Narrative
Severe rain storm event caused acute flooding over a localized area of lycoming county, pa in the vicinity of montoursville, pa. This storm produced powerful flooding which destroyed area roads and bridges. The bridge deck and north side concrete pediment at wallis run confluence with loyalsock creek was swept into the creek by flood waters. The concrete and steel bridge components and pediment wing wall impacted the 8" bald eagle to buffalo line segment, causing the pipeline failure at the wallis run crossing. The sunoco pipeline (splp) control center observed a rapid pressure loss at a pump station followed by a leak detection system alarm and immediately began shutdown of the pipeline. Five pump stations were shut down. Automated valves configured with the pump station shutdowns isolated pipeline segments along the system within 2 to 6 minutes of the pressure loss and leak detection alarm. Shortly thereafter the control center received phone notification from the lycoming county 911 dispatcher of gasoline odors in the area of the loyalsock creek. Splp control center contacted splp field personnel and they were dispatched to investigate in the area of the reported odors. At 04:40, field personnel confirmed the release. Additional manual valves were closed to further isolate the affected segment in addition to the automatic and remotely operated valves closed earlier by the control center. Nrc report # 1162129 was filed on 10/21/2016 at 06:09. Emergency response was initiated and splp organized incident command center (ic). Ic was expanded to unified command (uc) including local, county, state and federal agencies. The emergency conditions and uc were terminated at 17:00 on 10/24/2016. Permanent repairs were completed and the pipeline was returned to service on november 12, 2016.
Detailed record list
Report Received Date
2016-11-17 00:00:00
Iyear
2016
Report Number
20160382
Supplemental Number
21896
Report Type
Supplemental Final
Operator Id
18718
Name
Sunoco Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2016-10-21 03:02:00
Location Latitude
41.35429
Location Longitude
-76.912268
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
1238
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2016-10-21 03:02:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-10-21 03:02:00
Restart Datetime
2016-11-12 20:17:00
On Site Datetime
2016-10-21 04:40:00
Nrc Rpt Datetime
2016-10-21 06:09:00
Nrc Rpt Num
1162129
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Automatic
Num Pub Evacuated
7
Pipe Fac Name
8" Bald Eagle To Buffalo
Segment Name
12002-8" Bald Eagle To Buffalo
Onshore State Abbreviation
Pa
Onshore Postal Code
17754
Onshore City Name
Gamble Township
Onshore County Name
Lycoming
Designated Location
Milepost/valve Station
Designated Name
481+57
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Other
Incident Area Details
Creek Crossing
Depth Of Cover
48
Crossing
Yes
Water Crossing Ind
Yes
Water Type
Uncased
Water Name
Wallis Run Creek At Confluence With Loyalsock Cree
Water Depth
2
Water Subtype
Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing)
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.322
Pipe Smys
35000
Pipe Specification
Api 5l Grade B
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Us Steel
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
1994
Manufactured Year
1994
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Pipe Severed Due To Natural Force Damage.
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
1238
Rel Water Name
Loyalsock Creek
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
85722
Est Cost Prop Damage
1600000
Est Cost Emergency
856704
Est Cost Environmental
20000
Est Cost Other
0
Prpty
2562426
Accident Psig
839
Mop Psig
1300
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
76454
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Other Outside Force Damage
Cause Details
Other Outside Force Damage
Outside Force Type
Other Outside Force Damage
Osf Other Details
Components Of Failed Bridge Contacted Pipe Causing Failure. Bridge Washed Out And Came Loose From Its Pediment Due To A Heavy Rain Event And Subsequent Flooding In The Area.
Preparer Name
T*** G* N*******
Preparer Title
Dot Compliance Manager
Preparer Email
T*********@s**************.com
Preparer Telephone
281-637-6576
Preparer Fax
877-917-0448
Prepared Date
2016-11-30 00:00:00
Authorizer Name
T*** G* N*******
Authorizer Telephone
281-637-6576
Authorizer Title
Dot Compliance Manager
Authorizer Email
T*********@s**************.com
Narrative
Severe rain storm event caused acute flooding over a localized area of lycoming county, pa in the vicinity of montoursville, pa. This storm produced powerful flooding which destroyed area roads and bridges. The bridge deck and north side concrete pediment at wallis run confluence with loyalsock creek was swept into the creek by flood waters. The concrete and steel bridge components and pediment wing wall impacted the 8" bald eagle to buffalo line segment, causing the pipeline failure at the wallis run crossing. The sunoco pipeline (splp) control center observed a rapid pressure loss at a pump station followed by a leak detection system alarm and immediately began shutdown of the pipeline. Five pump stations were shut down. Automated valves configured with the pump station shutdowns isolated pipeline segments along the system within 2 to 6 minutes of the pressure loss and leak detection alarm. Shortly thereafter the control center received phone notification from the lycoming county 911 dispatcher of gasoline odors in the area of the loyalsock creek. Splp control center contacted splp field personnel and they were dispatched to investigate in the area of the reported odors. At 04:40, field personnel confirmed the release. Additional manual valves were closed to further isolate the affected segment in addition to the automatic and remotely operated valves closed earlier by the control center. Nrc report # 1162129 was filed on 10/21/2016 at 06:09. Emergency response was initiated and splp organized incident command center (ic). Ic was expanded to unified command (uc) including local, county, state and federal agencies. The emergency conditions and uc were terminated at 17:00 on 10/24/2016. Permanent repairs were completed and the pipeline was returned to service on november 12, 2016.
| Report Received Date | 2016-11-17 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160382 |
| Supplemental Number | 21896 |
| Report Type | Supplemental Final |
| Operator Id | 18718 PHMSA Enforcement |
| Name | Sunoco Pipeline L.p. |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2016-10-21 03:02:00 |
| Location Latitude | 41.35429 Google Maps OpenStreetMap |
| Location Longitude | -76.912268 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 1238 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2016-10-21 03:02:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-10-21 03:02:00 |
| Restart Datetime | 2016-11-12 20:17:00 |
| On Site Datetime | 2016-10-21 04:40:00 |
| Nrc Rpt Datetime | 2016-10-21 06:09:00 |
| Nrc Rpt Num | 1162129 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Automatic |
| Num Pub Evacuated | 7 |
| Pipe Fac Name | 8" Bald Eagle To Buffalo |
| Segment Name | 12002-8" Bald Eagle To Buffalo |
| Onshore State Abbreviation | Pa |
| Onshore Postal Code | 17754 |
| Onshore City Name | Gamble Township |
| Onshore County Name | Lycoming |
| Designated Location | Milepost/valve Station |
| Designated Name | 481+57 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Other |
| Incident Area Details | Creek Crossing |
| Depth Of Cover | 48 |
| Crossing | Yes |
| Water Crossing Ind | Yes |
| Water Type | Uncased |
| Water Name | Wallis Run Creek At Confluence With Loyalsock Cree |
| Water Depth | 2 |
| Water Subtype | Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing) |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.322 |
| Pipe Smys | 35000 |
| Pipe Specification | Api 5l Grade B |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Us Steel |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Installation Year | 1994 |
| Manufactured Year | 1994 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Pipe Severed Due To Natural Force Damage. |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | Yes |
| Surface Contam Ind | Yes |
| Amount Released | 1238 |
| Rel Water Name | Loyalsock Creek |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 85722 |
| Est Cost Prop Damage | 1600000 |
| Est Cost Emergency | 856704 |
| Est Cost Environmental | 20000 |
| Est Cost Other | 0 |
| Prpty | 2562426 |
| Accident Psig | 839 |
| Mop Psig | 1300 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 76454 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 1 |
| Num Employees Failed | 0 |
| Cause | Other Outside Force Damage |
| Cause Details | Other Outside Force Damage |
| Outside Force Type | Other Outside Force Damage |
| Osf Other Details | Components Of Failed Bridge Contacted Pipe Causing Failure. Bridge Washed Out And Came Loose From Its Pediment Due To A Heavy Rain Event And Subsequent Flooding In The Area. |
| Preparer Name | T*** G* N******* |
| Preparer Title | Dot Compliance Manager |
| Preparer Email | T*********@s**************.com |
| Preparer Telephone | 281-637-6576 |
| Preparer Fax | 877-917-0448 |
| Prepared Date | 2016-11-30 00:00:00 |
| Authorizer Name | T*** G* N******* |
| Authorizer Telephone | 281-637-6576 |
| Authorizer Title | Dot Compliance Manager |
| Authorizer Email | T*********@s**************.com |
| Narrative | Severe rain storm event caused acute flooding over a localized area of lycoming county, pa in the vicinity of montoursville, pa. This storm produced powerful flooding which destroyed area roads and bridges. The bridge deck and north side concrete pediment at wallis run confluence with loyalsock creek was swept into the creek by flood waters. The concrete and steel bridge components and pediment wing wall impacted the 8" bald eagle to buffalo line segment, causing the pipeline failure at the wallis run crossing. The sunoco pipeline (splp) control center observed a rapid pressure loss at a pump station followed by a leak detection system alarm and immediately began shutdown of the pipeline. Five pump stations were shut down. Automated valves configured with the pump station shutdowns isolated pipeline segments along the system within 2 to 6 minutes of the pressure loss and leak detection alarm. Shortly thereafter the control center received phone notification from the lycoming county 911 dispatcher of gasoline odors in the area of the loyalsock creek. Splp control center contacted splp field personnel and they were dispatched to investigate in the area of the reported odors. At 04:40, field personnel confirmed the release. Additional manual valves were closed to further isolate the affected segment in addition to the automatic and remotely operated valves closed earlier by the control center. Nrc report # 1162129 was filed on 10/21/2016 at 06:09. Emergency response was initiated and splp organized incident command center (ic). Ic was expanded to unified command (uc) including local, county, state and federal agencies. The emergency conditions and uc were terminated at 17:00 on 10/24/2016. Permanent repairs were completed and the pipeline was returned to service on november 12, 2016. |