HL incident on 2016-10-06 — TX
Operator
Dcp Midstream
Cause
Corrosion Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$550,000
Incident datetime
2016-10-06 19:45
Report number
Location
TX
Narrative
Dcp midstream continued mitigative measures on the rb-1 pipeline due to the release on the pecos river. The cause of that failure was determined by the third party engineering firm, stress engineering, to be induced stray current corrosion (ac and dc). As a result dcp's efforts were focused on evaluating and mitigating stray currents on the entire pipeline. Dcp midstream therefore ran an ili tool on the entire lateral and received all anomalies greater than 59% from the vendor. On 10/6/2016, during efforts to repair an anomaly located about 1 mile west of the pecos river, a pin hole leak was discovered. The pipeline was therefore taken out of service after the pin hole leak discovery and dcp midstream immediately initiated actions to repair the leak. Dcp midstream installed stopples on the pinhole leak and the damaged pipe was cut out and replaced with new pipeline. All repairs were completed and the pipeline was returned to full service on 10/12/2016.
Detailed record list
Report Received Date
2016-11-04 00:00:00
Iyear
2016
Report Number
20160362
Supplemental Number
21934
Report Type
Supplemental Final
Operator Id
31130
Name
Dcp Midstream
Operator Street Address
2331 Citywest Blvd. Hq-08-S812-02
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2016-10-06 19:45:00
Location Latitude
31.80071
Location Longitude
-103.79157
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
0.12
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2016-10-06 19:45:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-10-06 20:03:00
Restart Datetime
2016-10-12 05:01:00
On Site Datetime
2016-10-06 19:45:00
Nrc Rpt Datetime
2016-10-06 21:33:00
Nrc Rpt Num
1160931
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Red Bluff Lateral
Segment Name
Rb-1
Onshore State Abbreviation
Tx
Onshore Postal Code
79770
Onshore City Name
Orla
Onshore County Name
Loving
Designated Location
Survey Station No.
Designated Name
420+00
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12
Pipe Wall Thickness
0.281
Pipe Smys
60000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Northwest Pipe
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
2015
Manufactured Year
2014
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
Yes
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
808
Est Cost Prop Damage
550000
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
550808
Accident Psig
712
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
63360
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Failure was not as a result of the actions of any controller. The controller responded appropriately and in a timely manner
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Stray Current Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
No
Shielding Evident
Yes
Cathodic Survey Type
No
Prior Damage
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2016
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
K*** F*****
Preparer Title
Ngl Pipeline Compliance And Integrity Specialist
Preparer Email
K*******@d***********.com
Preparer Telephone
7137353719
Prepared Date
2016-12-07 00:00:00
Authorizer Name
B****** P*****
Authorizer Telephone
7132687400
Authorizer Title
Director Ngl Pipeline Integrity And Compliance
Authorizer Email
B*******@d***********.com
Narrative
Dcp midstream continued mitigative measures on the rb-1 pipeline due to the release on the pecos river. The cause of that failure was determined by the third party engineering firm, stress engineering, to be induced stray current corrosion (ac and dc). As a result dcp's efforts were focused on evaluating and mitigating stray currents on the entire pipeline. Dcp midstream therefore ran an ili tool on the entire lateral and received all anomalies greater than 59% from the vendor. On 10/6/2016, during efforts to repair an anomaly located about 1 mile west of the pecos river, a pin hole leak was discovered. The pipeline was therefore taken out of service after the pin hole leak discovery and dcp midstream immediately initiated actions to repair the leak. Dcp midstream installed stopples on the pinhole leak and the damaged pipe was cut out and replaced with new pipeline. All repairs were completed and the pipeline was returned to full service on 10/12/2016.
| Report Received Date | 2016-11-04 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160362 |
| Supplemental Number | 21934 |
| Report Type | Supplemental Final |
| Operator Id | 31130 PHMSA Enforcement |
| Name | Dcp Midstream |
| Operator Street Address | 2331 Citywest Blvd. Hq-08-S812-02 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77042 |
| Local Datetime | 2016-10-06 19:45:00 |
| Location Latitude | 31.80071 Google Maps OpenStreetMap |
| Location Longitude | -103.79157 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid) |
| Unintentional Release Bbls | 0.12 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2016-10-06 19:45:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-10-06 20:03:00 |
| Restart Datetime | 2016-10-12 05:01:00 |
| On Site Datetime | 2016-10-06 19:45:00 |
| Nrc Rpt Datetime | 2016-10-06 21:33:00 |
| Nrc Rpt Num | 1160931 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Red Bluff Lateral |
| Segment Name | Rb-1 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79770 |
| Onshore City Name | Orla |
| Onshore County Name | Loving |
| Designated Location | Survey Station No. |
| Designated Name | 420+00 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Depth Of Cover | 72 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 12 |
| Pipe Wall Thickness | 0.281 |
| Pipe Smys | 60000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Northwest Pipe |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Installation Year | 2015 |
| Manufactured Year | 2014 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | Yes |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 808 |
| Est Cost Prop Damage | 550000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 550808 |
| Accident Psig | 712 |
| Mop Psig | 1440 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 63360 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | Yes |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Failure was not as a result of the actions of any controller. The controller responded appropriately and in a timely manner |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Stray Current Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | No |
| Shielding Evident | Yes |
| Cathodic Survey Type | No |
| Prior Damage | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Axial Recent Year | 2016 |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | K*** F***** |
| Preparer Title | Ngl Pipeline Compliance And Integrity Specialist |
| Preparer Email | K*******@d***********.com |
| Preparer Telephone | 7137353719 |
| Prepared Date | 2016-12-07 00:00:00 |
| Authorizer Name | B****** P***** |
| Authorizer Telephone | 7132687400 |
| Authorizer Title | Director Ngl Pipeline Integrity And Compliance |
| Authorizer Email | B*******@d***********.com |
| Narrative | Dcp midstream continued mitigative measures on the rb-1 pipeline due to the release on the pecos river. The cause of that failure was determined by the third party engineering firm, stress engineering, to be induced stray current corrosion (ac and dc). As a result dcp's efforts were focused on evaluating and mitigating stray currents on the entire pipeline. Dcp midstream therefore ran an ili tool on the entire lateral and received all anomalies greater than 59% from the vendor. On 10/6/2016, during efforts to repair an anomaly located about 1 mile west of the pecos river, a pin hole leak was discovered. The pipeline was therefore taken out of service after the pin hole leak discovery and dcp midstream immediately initiated actions to repair the leak. Dcp midstream installed stopples on the pinhole leak and the damaged pipe was cut out and replaced with new pipeline. All repairs were completed and the pipeline was returned to full service on 10/12/2016. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA