HL incident on 2016-09-18 — PA

Operator
Buckeye Partners, Lp
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$3,500
Incident datetime
2016-09-18 13:00
Report number
Location
PA
Narrative
The leak was determined to be at a one inch (1") elbow weld inside the facility property. The root cause, as determined by metallurgical, analysis is attributed to fatigue of a crack feature that may have been present at the time of installation. As a corrective action, a portion of like pieces of equipment will be inspected using ndt to determine if there is a systemic issue. 12/6/2016 updated gps coordinates to reflect exact location of incident.
Detailed record list
Report Received Date
2016-10-17 00:00:00
Iyear
2016
Report Number
20160329
Supplemental Number
22061
Report Type
Supplemental Final
Operator Id
Name
Buckeye Partners, Lp
Operator Street Address
The Buckeye Building 6161 Hamilton Boulevar
Operator City Name
Allentown
Operator State Abbreviation
PA
Operator Postal Code
18106
Local Datetime
2016-09-18 13:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.4
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2016-09-18 13:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Line Section Was Isolated
On Site Datetime
2016-09-18 13:00:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Buckeye Texas Processing
Segment Name
None
Onshore State Abbreviation
Tx
Onshore Postal Code
78409
Onshore City Name
Corpus Cristi
Onshore County Name
Nueces
Designated Location
Milepost/valve Station
Designated Name
In Plant
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Weld, Including Heat-Affected Zone
Weld Subtype
Other Butt Weld
Installation Year
2014
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
3500
Est Cost Emergency
250
Est Cost Environmental
0
Est Cost Other
0
Prpty
3750
Accident Psig
25
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
3
Internal Inspection Ind
No
Diameter Change Ind
Yes
Operation Complications Ind
Yes
Other Complications Ind
Yes
Inspect Comp Details
A Closed Loop Rv System
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Weld failure determined
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind
Yes
Metallurgical Ind
Yes
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related
Yes
Failure Subtype
Mechanical Vibration
Pwf Additional Other Ind
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
H*** S******
Preparer Title
Compliance Specialist
Preparer Email
H*******@b******.com
Preparer Telephone
610-904-4916
Prepared Date
2017-02-01 00:00:00
Authorizer Name
C****** P********
Authorizer Telephone
610-904-4113
Authorizer Title
Director Regulatory Compliance
Authorizer Email
C*********@b******.com
Narrative
The leak was determined to be at a one inch (1") elbow weld inside the facility property. The root cause, as determined by metallurgical, analysis is attributed to fatigue of a crack feature that may have been present at the time of installation. As a corrective action, a portion of like pieces of equipment will be inspected using ndt to determine if there is a systemic issue. 12/6/2016 updated gps coordinates to reflect exact location of incident.
Report Received Date 2016-10-17 00:00:00
Iyear 2016
Report Number 20160329
Supplemental Number 22061
Report Type Supplemental Final
Operator Id 1845 PHMSA Enforcement
Name Buckeye Partners, Lp
Operator Street Address The Buckeye Building 6161 Hamilton Boulevar
Operator City Name Allentown
Operator State Abbreviation PA
Operator Postal Code 18106
Local Datetime 2016-09-18 13:00:00
Location Latitude 27.8189044 Google Maps OpenStreetMap
Location Longitude -97.5079139 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.4
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2016-09-18 13:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain The Line Section Was Isolated
On Site Datetime 2016-09-18 13:00:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Buckeye Texas Processing
Segment Name None
Onshore State Abbreviation Tx
Onshore Postal Code 78409
Onshore City Name Corpus Cristi
Onshore County Name Nueces
Designated Location Milepost/valve Station
Designated Name In Plant
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Weld, Including Heat-Affected Zone
Weld Subtype Other Butt Weld
Installation Year 2014
Material Involved Carbon Steel
Release Type Leak
Leak Type Crack
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 3500
Est Cost Emergency 250
Est Cost Environmental 0
Est Cost Other 0
Prpty 3750
Accident Psig 25
Mop Psig 275
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 3
Internal Inspection Ind No
Diameter Change Ind Yes
Operation Complications Ind Yes
Other Complications Ind Yes
Inspect Comp Details A Closed Loop Rv System
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Weld failure determined
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind Yes
Metallurgical Ind Yes
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Fatigue Vibr Related Yes
Failure Subtype Mechanical Vibration
Pwf Additional Other Ind Yes
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name H*** S******
Preparer Title Compliance Specialist
Preparer Email H*******@b******.com
Preparer Telephone 610-904-4916
Prepared Date 2017-02-01 00:00:00
Authorizer Name C****** P********
Authorizer Telephone 610-904-4113
Authorizer Title Director Regulatory Compliance
Authorizer Email C*********@b******.com
Narrative The leak was determined to be at a one inch (1") elbow weld inside the facility property. The root cause, as determined by metallurgical, analysis is attributed to fatigue of a crack feature that may have been present at the time of installation. As a corrective action, a portion of like pieces of equipment will be inspected using ndt to determine if there is a systemic issue. 12/6/2016 updated gps coordinates to reflect exact location of incident.

All rights reserved. Copyright © by ClearPHMSA