HL incident on 2016-09-09 — GA
Operator
Colonial Pipeline Co
Cause
Other Accident Cause
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$2,500,000
Incident datetime
2016-09-09 11:10
Report number
Location
GA
Narrative
On 09/09/16 at 11:10 cst the colonial pipeline control center was notified of a suspected leak in shelby county, al (approximately 9 miles upstream of pelham station). The control center reported shutdown and remote isolation of the segment at 11:30. At 11:20 local row personnel were dispatched to investigate. At 12:14 field observers confirmed a release of gasoline. Nrc was notified at 12:59 via report #1158584. Adem, county ema and local fire departments were subsequently notified and a unified command system structure was implemented. Subsequent nrc reports were made as follows: 9/09/16 23:13 - #1158628 update to 1,000 bbls 9/13/16 18:58 - #1158929 update to 6,000 bbls on 01/27/17 dnv gl submitted the root cause failure analysis report to colonial. The report stated that "a wrinkle occurred in the pipe extending approximately 180 degrees from the 9 o'clock to 3 o'clock position. A circumferential crack of approximately 1-1.5 inches was present at approximately the 12 o'clock position at the wrinkle path. The wrinkle was caused by "inadequate soil consolidation under line 01 following maintenance/recoat activities in 2015." update 2/14/18: soil mass balance for the cr91 release was calculated using landfill weight tickets and an average of the tph gro from stockpile samples. The tph gro average was 278.5 mg/kg and the soil weight was 13942 tons. Using the worksheet, total volume of product in soil was calculated to be 1,275 gallons. All soil was disposed of at a landfill with disposal approval by adem. Any future, long-term remediation will be conducted under the guidnace of adem.
Detailed record list
Report Received Date
2016-10-07 00:00:00
Iyear
2016
Report Number
20160324
Supplemental Number
32082
Report Type
Supplemental Final
Operator Id
2552
Name
Colonial Pipeline Co
Operator Street Address
1000 Lake St.
Operator City Name
Alpharetta
Operator State Abbreviation
GA
Operator Postal Code
30009
Local Datetime
2016-09-09 11:10:00
Location Latitude
33.242297
Location Longitude
-86.918265
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
7370
Recovered Bbls
2141
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2016-09-09 11:10:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-09-09 11:30:00
Restart Datetime
2016-09-21 17:31:00
On Site Datetime
2016-09-09 12:14:00
Nrc Rpt Datetime
2016-09-09 12:59:00
Nrc Rpt Num
1158584
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Line 01
Segment Name
Line 01 Collins To Pelham
Onshore State Abbreviation
Al
Onshore Postal Code
35080
Onshore City Name
Helena
Onshore County Name
Shelby
Designated Location
Survey Station No.
Designated Name
Mp 579
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
144
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
36
Pipe Wall Thickness
0.281
Pipe Smys
52000
Pipe Specification
Api 5l
Pipe Seam Type
Dsaw
Pipe Manufacturer
National Tube
Pipe Coating Type
Field Applied Epoxy
Installation Year
1961
Manufactured Year
1960
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
A Wrinkle With A Crack (See H)
Wildlife Impact Ind
Yes
Fish Aquatic Impact Ind
Yes
Birds Impact Ind
Yes
Terrestrial Impact Ind
Yes
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Groundwater Contam Ind
Yes
Amount Released
7348.6
Rel Water Name
Retention Pond
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
329391
Est Cost Prop Damage
2500000
Est Cost Emergency
38100000
Est Cost Environmental
2000000
Est Cost Other
0
Prpty
42929391
Accident Psig
207
Mop Psig
563
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
147109
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Controller contribution not a contributing factor - controller/control room investigation not warranted
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Accident Cause
Cause Details
Miscellaneous
Other Type
Miscellaneous
Misc Details
Maintenance Activities Performed During A Recoating Project In 2015 Appears To Have Resulted In Inadequate Vertical Support Of The Pipeline That Created An External Loading Condition Conducive To Buckling At The Failure Location.
Preparer Name
D***** L******
Preparer Title
Compliance Coordinator Sed
Preparer Email
D********@c******.com
Preparer Telephone
770-819-3574
Prepared Date
2019-05-06 00:00:00
Authorizer Name
J******* B B********
Authorizer Telephone
678-762-2203
Authorizer Title
Manager Pipeline Compliance
Authorizer Email
J*********@c******.com
Narrative
On 09/09/16 at 11:10 cst the colonial pipeline control center was notified of a suspected leak in shelby county, al (approximately 9 miles upstream of pelham station). The control center reported shutdown and remote isolation of the segment at 11:30. At 11:20 local row personnel were dispatched to investigate. At 12:14 field observers confirmed a release of gasoline. Nrc was notified at 12:59 via report #1158584. Adem, county ema and local fire departments were subsequently notified and a unified command system structure was implemented. Subsequent nrc reports were made as follows: 9/09/16 23:13 - #1158628 update to 1,000 bbls 9/13/16 18:58 - #1158929 update to 6,000 bbls on 01/27/17 dnv gl submitted the root cause failure analysis report to colonial. The report stated that "a wrinkle occurred in the pipe extending approximately 180 degrees from the 9 o'clock to 3 o'clock position. A circumferential crack of approximately 1-1.5 inches was present at approximately the 12 o'clock position at the wrinkle path. The wrinkle was caused by "inadequate soil consolidation under line 01 following maintenance/recoat activities in 2015." update 2/14/18: soil mass balance for the cr91 release was calculated using landfill weight tickets and an average of the tph gro from stockpile samples. The tph gro average was 278.5 mg/kg and the soil weight was 13942 tons. Using the worksheet, total volume of product in soil was calculated to be 1,275 gallons. All soil was disposed of at a landfill with disposal approval by adem. Any future, long-term remediation will be conducted under the guidnace of adem.
| Report Received Date | 2016-10-07 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160324 |
| Supplemental Number | 32082 |
| Report Type | Supplemental Final |
| Operator Id | 2552 PHMSA Enforcement |
| Name | Colonial Pipeline Co |
| Operator Street Address | 1000 Lake St. |
| Operator City Name | Alpharetta |
| Operator State Abbreviation | GA |
| Operator Postal Code | 30009 |
| Local Datetime | 2016-09-09 11:10:00 |
| Location Latitude | 33.242297 Google Maps OpenStreetMap |
| Location Longitude | -86.918265 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 7370 |
| Recovered Bbls | 2141 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2016-09-09 11:10:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-09-09 11:30:00 |
| Restart Datetime | 2016-09-21 17:31:00 |
| On Site Datetime | 2016-09-09 12:14:00 |
| Nrc Rpt Datetime | 2016-09-09 12:59:00 |
| Nrc Rpt Num | 1158584 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Line 01 |
| Segment Name | Line 01 Collins To Pelham |
| Onshore State Abbreviation | Al |
| Onshore Postal Code | 35080 |
| Onshore City Name | Helena |
| Onshore County Name | Shelby |
| Designated Location | Survey Station No. |
| Designated Name | Mp 579 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 144 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 36 |
| Pipe Wall Thickness | 0.281 |
| Pipe Smys | 52000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Dsaw |
| Pipe Manufacturer | National Tube |
| Pipe Coating Type | Field Applied Epoxy |
| Installation Year | 1961 |
| Manufactured Year | 1960 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | A Wrinkle With A Crack (See H) |
| Wildlife Impact Ind | Yes |
| Fish Aquatic Impact Ind | Yes |
| Birds Impact Ind | Yes |
| Terrestrial Impact Ind | Yes |
| Soil Contamination | Yes |
| Long Term Assessment | Yes |
| Remediation Ind | Yes |
| Groundwater Remed Ind | Yes |
| Soil Remed Ind | Yes |
| Vegetation Remed Ind | Yes |
| Water Contam Ind | Yes |
| Surface Contam Ind | Yes |
| Groundwater Contam Ind | Yes |
| Amount Released | 7348.6 |
| Rel Water Name | Retention Pond |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 329391 |
| Est Cost Prop Damage | 2500000 |
| Est Cost Emergency | 38100000 |
| Est Cost Environmental | 2000000 |
| Est Cost Other | 0 |
| Prpty | 42929391 |
| Accident Psig | 207 |
| Mop Psig | 563 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 147109 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Controller contribution not a contributing factor - controller/control room investigation not warranted |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Accident Cause |
| Cause Details | Miscellaneous |
| Other Type | Miscellaneous |
| Misc Details | Maintenance Activities Performed During A Recoating Project In 2015 Appears To Have Resulted In Inadequate Vertical Support Of The Pipeline That Created An External Loading Condition Conducive To Buckling At The Failure Location. |
| Preparer Name | D***** L****** |
| Preparer Title | Compliance Coordinator Sed |
| Preparer Email | D********@c******.com |
| Preparer Telephone | 770-819-3574 |
| Prepared Date | 2019-05-06 00:00:00 |
| Authorizer Name | J******* B B******** |
| Authorizer Telephone | 678-762-2203 |
| Authorizer Title | Manager Pipeline Compliance |
| Authorizer Email | J*********@c******.com |
| Narrative | On 09/09/16 at 11:10 cst the colonial pipeline control center was notified of a suspected leak in shelby county, al (approximately 9 miles upstream of pelham station). The control center reported shutdown and remote isolation of the segment at 11:30. At 11:20 local row personnel were dispatched to investigate. At 12:14 field observers confirmed a release of gasoline. Nrc was notified at 12:59 via report #1158584. Adem, county ema and local fire departments were subsequently notified and a unified command system structure was implemented. Subsequent nrc reports were made as follows: 9/09/16 23:13 - #1158628 update to 1,000 bbls 9/13/16 18:58 - #1158929 update to 6,000 bbls on 01/27/17 dnv gl submitted the root cause failure analysis report to colonial. The report stated that "a wrinkle occurred in the pipe extending approximately 180 degrees from the 9 o'clock to 3 o'clock position. A circumferential crack of approximately 1-1.5 inches was present at approximately the 12 o'clock position at the wrinkle path. The wrinkle was caused by "inadequate soil consolidation under line 01 following maintenance/recoat activities in 2015." update 2/14/18: soil mass balance for the cr91 release was calculated using landfill weight tickets and an average of the tph gro from stockpile samples. The tph gro average was 278.5 mg/kg and the soil weight was 13942 tons. Using the worksheet, total volume of product in soil was calculated to be 1,275 gallons. All soil was disposed of at a landfill with disposal approval by adem. Any future, long-term remediation will be conducted under the guidnace of adem. |