Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2016-08-17 — TX
Operator
Delek Logistics Operating, Llc.
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,200
Incident datetime
2016-08-17 06:02
Report number
Location
TX
Narrative
Operating personnel of the receiving party called delek's control center on the morning of august 17, 2016 to alert delek that there was oil in the area around the delivery meter on their facility. Delek operating personnel immediately shut down the pipeline delivering to the meter. A delek operations supervisor called delek's maintenance supervisor to alert him of the incident and maintenance/response personnel were dispatched to the site. Delek supervisors arriving at site met with the receiving party personnel and determined the oil was coming from a broken back pressure control valve on the outlet of the meter. Response personnel arrived on site and located the end of the spill plume, boomed drainage ditch ahead of the oil and deployed vacuum trucks for recovery. Spill was reported once it was determined the source was from delek operated pipe although leak was past point of custody transfer. Broken valve was replaced after alignment with the third party piping was created and the soil was packed so movement of the piping would be more difficult. Additionally, another support was added before pipeline was restarted on august 20, 2016 ensuring there would be no stress on the valve that failed if there was earth movement or settling in the area again.
Detailed record list
Report Received Date
2016-09-16 00:00:00
Iyear
2016
Report Number
20160303
Supplemental Number
33552
Report Type
Supplemental Final
Operator Id
11551
Name
Delek Logistics Operating, Llc.
Operator Street Address
5850 Granite Parkway #450
Operator City Name
Plano
Operator State Abbreviation
TX
Operator Postal Code
75024
Local Datetime
2016-08-17 06:02:00
Location Latitude
33.34219
Location Longitude
-92.70125
Commodity Released Type
Crude Oil
Unintentional Release Bbls
20
Recovered Bbls
18
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2016-08-17 06:02:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-08-17 06:02:00
Restart Datetime
2016-08-20 08:00:00
On Site Datetime
2016-08-17 07:05:00
Nrc Rpt Datetime
2016-08-17 08:55:00
Nrc Rpt Num
1156492
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cross Delivery Meter Outlet
Segment Name
Cross Delivery/3902
Onshore State Abbreviation
Ar
Onshore Postal Code
71762
Onshore City Name
Not Within A Municipality
Onshore County Name
Union
Designated Location
Milepost/valve Station
Designated Name
Milepost 6.6
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Ductile Iron
Release Type
Leak
Leak Type
Crack
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
10000
Est Cost Gas Released
200
Est Cost Prop Damage
1200
Est Cost Emergency
40000
Est Cost Environmental
0
Est Cost Other
0
Prpty
51400
Accident Psig
40
Mop Psig
285
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Leak was outside of operator's leak detection system and on delivery side of custody transfer meter
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material
Eq Failure Type
Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material
Additional Support Ind
Yes
Preparer Name
G**** G****
Preparer Title
Engineering Superintendent
Preparer Email
G**********@d*************.com
Preparer Telephone
870-314-2848
Prepared Date
2016-09-16 00:00:00
Authorizer Name
G**** G****
Authorizer Telephone
8708641372
Authorizer Title
Engineering Superintendant
Authorizer Email
G**********@d*************.com
Narrative
Operating personnel of the receiving party called delek's control center on the morning of august 17, 2016 to alert delek that there was oil in the area around the delivery meter on their facility. Delek operating personnel immediately shut down the pipeline delivering to the meter. A delek operations supervisor called delek's maintenance supervisor to alert him of the incident and maintenance/response personnel were dispatched to the site. Delek supervisors arriving at site met with the receiving party personnel and determined the oil was coming from a broken back pressure control valve on the outlet of the meter. Response personnel arrived on site and located the end of the spill plume, boomed drainage ditch ahead of the oil and deployed vacuum trucks for recovery. Spill was reported once it was determined the source was from delek operated pipe although leak was past point of custody transfer. Broken valve was replaced after alignment with the third party piping was created and the soil was packed so movement of the piping would be more difficult. Additionally, another support was added before pipeline was restarted on august 20, 2016 ensuring there would be no stress on the valve that failed if there was earth movement or settling in the area again.
| Report Received Date | 2016-09-16 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160303 |
| Supplemental Number | 33552 |
| Report Type | Supplemental Final |
| Operator Id | 11551 PHMSA Enforcement |
| Name | Delek Logistics Operating, Llc. |
| Operator Street Address | 5850 Granite Parkway #450 |
| Operator City Name | Plano |
| Operator State Abbreviation | TX |
| Operator Postal Code | 75024 |
| Local Datetime | 2016-08-17 06:02:00 |
| Location Latitude | 33.34219 Google Maps OpenStreetMap |
| Location Longitude | -92.70125 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 20 |
| Recovered Bbls | 18 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2016-08-17 06:02:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-08-17 06:02:00 |
| Restart Datetime | 2016-08-20 08:00:00 |
| On Site Datetime | 2016-08-17 07:05:00 |
| Nrc Rpt Datetime | 2016-08-17 08:55:00 |
| Nrc Rpt Num | 1156492 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Cross Delivery Meter Outlet |
| Segment Name | Cross Delivery/3902 |
| Onshore State Abbreviation | Ar |
| Onshore Postal Code | 71762 |
| Onshore City Name | Not Within A Municipality |
| Onshore County Name | Union |
| Designated Location | Milepost/valve Station |
| Designated Name | Milepost 6.6 |
| Federal | No |
| Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | Unknown |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Ductile Iron |
| Release Type | Leak |
| Leak Type | Crack |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 10000 |
| Est Cost Gas Released | 200 |
| Est Cost Prop Damage | 1200 |
| Est Cost Emergency | 40000 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 51400 |
| Accident Psig | 40 |
| Mop Psig | 285 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Leak was outside of operator's leak detection system and on delivery side of custody transfer meter |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material |
| Eq Failure Type | Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material |
| Additional Support Ind | Yes |
| Preparer Name | G**** G**** |
| Preparer Title | Engineering Superintendent |
| Preparer Email | G**********@d*************.com |
| Preparer Telephone | 870-314-2848 |
| Prepared Date | 2016-09-16 00:00:00 |
| Authorizer Name | G**** G**** |
| Authorizer Telephone | 8708641372 |
| Authorizer Title | Engineering Superintendant |
| Authorizer Email | G**********@d*************.com |
| Narrative | Operating personnel of the receiving party called delek's control center on the morning of august 17, 2016 to alert delek that there was oil in the area around the delivery meter on their facility. Delek operating personnel immediately shut down the pipeline delivering to the meter. A delek operations supervisor called delek's maintenance supervisor to alert him of the incident and maintenance/response personnel were dispatched to the site. Delek supervisors arriving at site met with the receiving party personnel and determined the oil was coming from a broken back pressure control valve on the outlet of the meter. Response personnel arrived on site and located the end of the spill plume, boomed drainage ditch ahead of the oil and deployed vacuum trucks for recovery. Spill was reported once it was determined the source was from delek operated pipe although leak was past point of custody transfer. Broken valve was replaced after alignment with the third party piping was created and the soil was packed so movement of the piping would be more difficult. Additionally, another support was added before pipeline was restarted on august 20, 2016 ensuring there would be no stress on the valve that failed if there was earth movement or settling in the area again. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA