HL incident on 2016-08-16 — TX

Operator
Mobil Pipe Line Company
Cause
Equipment Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$200
Incident datetime
2016-08-16 04:19
Report number
Location
TX
Narrative
A gasket on a flanged connection failed during normal operation resulting in a 4.4 barrel propane release. Empco has replaced the defective gasket at the arco junction site as well as other compressed fiber gaskets at this valve site and along the affected pipeline segment. The new gaskets are constructed with glass-reinforced epoxy (gre) laminate bonded to a metal core.
Detailed record list
Report Received Date
2016-09-15 00:00:00
Iyear
2016
Report Number
20160301
Supplemental Number
22498
Report Type
Supplemental Final
Operator Id
Name
Mobil Pipe Line Company
Operator Street Address
22777 Springwoods Village Parkway E3.5a.598
Operator City Name
Spring
Operator State Abbreviation
TX
Operator Postal Code
77389
Local Datetime
2016-08-16 04:19:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Propane
Unintentional Release Bbls
4.4
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2016-08-16 04:19:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Already Down
On Site Datetime
2016-08-16 04:48:00
Nrc Rpt Datetime
2016-08-16 08:30:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Mpl-118a Mt Belvieu To Arco Jct
Segment Name
Arco Jct
Onshore State Abbreviation
Tx
Onshore Postal Code
77580
Onshore City Name
Mt Belvieu
Onshore County Name
Chambers
Designated Location
Milepost/valve Station
Designated Name
Arco Junction
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Flange Assembly
Installation Year
Unknown
Material Involved
Material Other Than Carbon Steel
Material Details
Gasket Material
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
200
Est Cost Emergency
500
Est Cost Environmental
0
Est Cost Other
0
Prpty
800
Accident Psig
1000
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
50
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
Currently There Are No Launching Or Receiving Traps
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
This lateral delivery is not monitored
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Gasket
Eq Additional Other Ind
Yes
Eq Additional Other Details
Investigation Was Not Able To Determine A Sub-Cause
Preparer Name
T*** M*********
Preparer Title
Pipeline Safety Advisor
Preparer Email
T**************@e*********.com
Preparer Telephone
8326247880
Preparer Fax
8326486336
Prepared Date
2017-07-21 00:00:00
Authorizer Name
M** C******* H********
Authorizer Telephone
8326247920
Authorizer Title
Sshe Manager
Authorizer Email
C*******************@e*********.com
Narrative
A gasket on a flanged connection failed during normal operation resulting in a 4.4 barrel propane release. Empco has replaced the defective gasket at the arco junction site as well as other compressed fiber gaskets at this valve site and along the affected pipeline segment. The new gaskets are constructed with glass-reinforced epoxy (gre) laminate bonded to a metal core.
Report Received Date 2016-09-15 00:00:00
Iyear 2016
Report Number 20160301
Supplemental Number 22498
Report Type Supplemental Final
Operator Id 12628 PHMSA Enforcement
Name Mobil Pipe Line Company
Operator Street Address 22777 Springwoods Village Parkway E3.5a.598
Operator City Name Spring
Operator State Abbreviation TX
Operator Postal Code 77389
Local Datetime 2016-08-16 04:19:00
Location Latitude 29.857514 Google Maps OpenStreetMap
Location Longitude -94.895203 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Propane
Unintentional Release Bbls 4.4
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Public
Incident Identified Datetime 2016-08-16 04:19:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Pipeline Was Already Down
On Site Datetime 2016-08-16 04:48:00
Nrc Rpt Datetime 2016-08-16 08:30:00
Nrc Rpt Num 1156367 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Mpl-118a Mt Belvieu To Arco Jct
Segment Name Arco Jct
Onshore State Abbreviation Tx
Onshore Postal Code 77580
Onshore City Name Mt Belvieu
Onshore County Name Chambers
Designated Location Milepost/valve Station
Designated Name Arco Junction
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Intrastate
Item Involved Flange Assembly
Installation Year Unknown
Material Involved Material Other Than Carbon Steel
Material Details Gasket Material
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 100
Est Cost Prop Damage 200
Est Cost Emergency 500
Est Cost Environmental 0
Est Cost Other 0
Prpty 800
Accident Psig 1000
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 50
Internal Inspection Ind No
Other Inspection Ind Yes
Internal Inspection Details Currently There Are No Launching Or Receiving Traps
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details This lateral delivery is not monitored
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind Gasket
Eq Additional Other Ind Yes
Eq Additional Other Details Investigation Was Not Able To Determine A Sub-Cause
Preparer Name T*** M*********
Preparer Title Pipeline Safety Advisor
Preparer Email T**************@e*********.com
Preparer Telephone 8326247880
Preparer Fax 8326486336
Prepared Date 2017-07-21 00:00:00
Authorizer Name M** C******* H********
Authorizer Telephone 8326247920
Authorizer Title Sshe Manager
Authorizer Email C*******************@e*********.com
Narrative A gasket on a flanged connection failed during normal operation resulting in a 4.4 barrel propane release. Empco has replaced the defective gasket at the arco junction site as well as other compressed fiber gaskets at this valve site and along the affected pipeline segment. The new gaskets are constructed with glass-reinforced epoxy (gre) laminate bonded to a metal core.

All rights reserved. Copyright © by ClearPHMSA