HL incident on 2016-08-25 — TX

Operator
Ngl Crude Terminals
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$400
Incident datetime
2016-08-25 06:00
Report number
Location
TX
Narrative
The mixer seal on tank 7759 gave way and leaked about 3 bbls onto the ground. The mixer was not running at the time of the incident. Ngl had actions tank truck on sight that assisted on slowing down the leak. Travis shipp locked the shaft on the mixer and it stop leaking. Tucker construction and action environmental cleaned up the oil soak gravel and dirt and hauled offsite. Tucker construction hauled clean rock in and replace the dirt.
Detailed record list
Report Received Date
2016-08-31 00:00:00
Iyear
2016
Report Number
20160272
Supplemental Number
21936
Report Type
Supplemental Final
Operator Id
Name
Ngl Crude Terminals
Operator Street Address
2900 N. Loop West Suite 1250
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77092
Local Datetime
2016-08-25 06:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
3
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2016-08-25 06:00:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
No
On Site Datetime
2016-08-25 06:15:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Ngl Energy Partners
Segment Name
Ngl Crude Cushing
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Cushing
Onshore County Name
Lincoln
Designated Location
Survey Station No.
Designated Name
Cushing
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Tank/vessel
Tank Vessel Subtype
Tank Shell
Tank Type
Atmospheric
Installation Year
2010
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
141
Est Cost Prop Damage
400
Est Cost Emergency
30
Est Cost Environmental
2800
Est Cost Other
200
Est Cost Other Details
Cleaned Up Oil Soak Gravel And Soil, Hauled Off And Replaced
Prpty
3571
Accident Psig
10
Mop Psig
100
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
=< 20% Smys Regulated Gathering
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Seal (Not Pump Seal) Or Packing
Additional Vibration Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
Mixer Seal Leaked
Preparer Name
R**** W****
Preparer Title
Operations Supervisor
Preparer Email
R**********@n****.com
Preparer Telephone
4053341696
Prepared Date
2016-12-07 00:00:00
Authorizer Name
T***** C******
Authorizer Telephone
4058800157
Authorizer Title
Director Of Operations And Construction
Authorizer Email
T*************@n****.com
Narrative
The mixer seal on tank 7759 gave way and leaked about 3 bbls onto the ground. The mixer was not running at the time of the incident. Ngl had actions tank truck on sight that assisted on slowing down the leak. Travis shipp locked the shaft on the mixer and it stop leaking. Tucker construction and action environmental cleaned up the oil soak gravel and dirt and hauled offsite. Tucker construction hauled clean rock in and replace the dirt.
Report Received Date 2016-08-31 00:00:00
Iyear 2016
Report Number 20160272
Supplemental Number 21936
Report Type Supplemental Final
Operator Id 38924 PHMSA Enforcement
Name Ngl Crude Terminals
Operator Street Address 2900 N. Loop West Suite 1250
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77092
Local Datetime 2016-08-25 06:00:00
Location Latitude 35.940151 Google Maps OpenStreetMap
Location Longitude -96.714602 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 3
Recovered Bbls 3
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2016-08-25 06:00:00
System Part Involved Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore Onshore
Shutdown Due Accident Ind No
On Site Datetime 2016-08-25 06:15:00
Nrc Rpt Num Nrc Notification Not Required NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Ngl Energy Partners
Segment Name Ngl Crude Cushing
Onshore State Abbreviation Ok
Onshore Postal Code 74023
Onshore City Name Cushing
Onshore County Name Lincoln
Designated Location Survey Station No.
Designated Name Cushing
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Tank, Including Attached Appurtenances
Crossing No
Pipe Facility Type Intrastate
Item Involved Tank/vessel
Tank Vessel Subtype Tank Shell
Tank Type Atmospheric
Installation Year 2010
Material Involved Carbon Steel
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 141
Est Cost Prop Damage 400
Est Cost Emergency 30
Est Cost Environmental 2800
Est Cost Other 200
Est Cost Other Details Cleaned Up Oil Soak Gravel And Soil, Hauled Off And Replaced
Prpty 3571
Accident Psig 10
Mop Psig 100
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function =< 20% Smys Regulated Gathering
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Other Non Threaded Ind Seal (Not Pump Seal) Or Packing
Additional Vibration Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details Mixer Seal Leaked
Preparer Name R**** W****
Preparer Title Operations Supervisor
Preparer Email R**********@n****.com
Preparer Telephone 4053341696
Prepared Date 2016-12-07 00:00:00
Authorizer Name T***** C******
Authorizer Telephone 4058800157
Authorizer Title Director Of Operations And Construction
Authorizer Email T*************@n****.com
Narrative The mixer seal on tank 7759 gave way and leaked about 3 bbls onto the ground. The mixer was not running at the time of the incident. Ngl had actions tank truck on sight that assisted on slowing down the leak. Travis shipp locked the shaft on the mixer and it stop leaking. Tucker construction and action environmental cleaned up the oil soak gravel and dirt and hauled offsite. Tucker construction hauled clean rock in and replace the dirt.

All rights reserved. Copyright © by ClearPHMSA