Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2016-07-14 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$100
Incident datetime
2016-07-14 08:10
Report number
Location
OK
Narrative
The release occurred at approximately 8:10 mst while the tank was receiving product during commissioning. When the level in tank 2503 reached a point on the tank nozzle of 3 ft. Product began to run out through a 1" open threaded weld-o-let located on the 18"x16" tank nozzle. Contractor personnel on site notified local operations and product movement into the tank was shut down. A one inch valve and plug were installed on the weld-o-let after the release was identified. The weld-o-let was plugged during the successful hydro-testing of the tank. During the p&id and pre-startup safety review walk through, a valve was identified as being in place in the weld-o-let. However, at some subsequent point the valve was removed by persons unknown and the weld-o-let left open during the filling of the tank with product. A visual inspection was done prior to receiving product into tankage but the missing valve was not detected at that time. Most of the released product collected on visqueen spread around the perimeter of the tank and was recovered by a vacuum truck. The product that impacted the soil was excavated and put into a roll-off container. Approximately 5 yards of soil was remediated.
Detailed record list
Report Received Date
2016-08-09 00:00:00
Iyear
2016
Report Number
20160246
Supplemental Number
21582
Report Type
Original Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2016-07-14 08:10:00
Location Latitude
40.20069
Location Longitude
-104.60941
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1.19
Recovered Bbls
1.19
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2016-07-14 08:10:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-07-14 08:20:00
Restart Datetime
2016-07-14 10:30:00
On Site Datetime
2016-07-14 08:10:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Platteville Terminal
Segment Name
Station No. 880
Onshore State Abbreviation
Co
Onshore Postal Code
80642
Onshore City Name
Hudson
Onshore County Name
Weld
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Tank/vessel
Tank Vessel Subtype
Appurtenance
Installation Year
2016
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Weld-O-Let Was Left Open.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
21
Est Cost Prop Damage
100
Est Cost Emergency
5072
Est Cost Environmental
0
Est Cost Other
0
Prpty
5193
Accident Psig
1
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The release was below system detection limits.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related Other Ind
Yes
Operation Related Details
Failed To Adequately Inspect Tank Before Receipt.
Category Type
Commissioning
Operator Qualification Ind
No
Preparer Name
K****** L* L*******
Preparer Title
Sr. Compliance Coordinator
Preparer Email
K***********@m*********.com
Preparer Telephone
918-574-7315
Preparer Fax
918-574-7377
Prepared Date
2016-08-09 00:00:00
Authorizer Name
K****** L* L*******
Authorizer Telephone
918-574-7315
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
K***********@m*********.com
Narrative
The release occurred at approximately 8:10 mst while the tank was receiving product during commissioning. When the level in tank 2503 reached a point on the tank nozzle of 3 ft. Product began to run out through a 1" open threaded weld-o-let located on the 18"x16" tank nozzle. Contractor personnel on site notified local operations and product movement into the tank was shut down. A one inch valve and plug were installed on the weld-o-let after the release was identified. The weld-o-let was plugged during the successful hydro-testing of the tank. During the p&id and pre-startup safety review walk through, a valve was identified as being in place in the weld-o-let. However, at some subsequent point the valve was removed by persons unknown and the weld-o-let left open during the filling of the tank with product. A visual inspection was done prior to receiving product into tankage but the missing valve was not detected at that time. Most of the released product collected on visqueen spread around the perimeter of the tank and was recovered by a vacuum truck. The product that impacted the soil was excavated and put into a roll-off container. Approximately 5 yards of soil was remediated.
| Report Received Date | 2016-08-09 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160246 |
| Supplemental Number | 21582 |
| Report Type | Original Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2016-07-14 08:10:00 |
| Location Latitude | 40.20069 Google Maps OpenStreetMap |
| Location Longitude | -104.60941 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1.19 |
| Recovered Bbls | 1.19 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2016-07-14 08:10:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-07-14 08:20:00 |
| Restart Datetime | 2016-07-14 10:30:00 |
| On Site Datetime | 2016-07-14 08:10:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Platteville Terminal |
| Segment Name | Station No. 880 |
| Onshore State Abbreviation | Co |
| Onshore Postal Code | 80642 |
| Onshore City Name | Hudson |
| Onshore County Name | Weld |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Tank, Including Attached Appurtenances |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Tank/vessel |
| Tank Vessel Subtype | Appurtenance |
| Installation Year | 2016 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Weld-O-Let Was Left Open. |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 21 |
| Est Cost Prop Damage | 100 |
| Est Cost Emergency | 5072 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 5193 |
| Accident Psig | 1 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The release was below system detection limits. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Incorrect Operation |
| Cause Details | Equipment Not Installed Properly |
| Operation Type | Equipment Not Installed Properly |
| Related Other Ind | Yes |
| Operation Related Details | Failed To Adequately Inspect Tank Before Receipt. |
| Category Type | Commissioning |
| Operator Qualification Ind | No |
| Preparer Name | K****** L* L******* |
| Preparer Title | Sr. Compliance Coordinator |
| Preparer Email | K***********@m*********.com |
| Preparer Telephone | 918-574-7315 |
| Preparer Fax | 918-574-7377 |
| Prepared Date | 2016-08-09 00:00:00 |
| Authorizer Name | K****** L* L******* |
| Authorizer Telephone | 918-574-7315 |
| Authorizer Title | Sr. Compliance Coordinator |
| Authorizer Email | K***********@m*********.com |
| Narrative | The release occurred at approximately 8:10 mst while the tank was receiving product during commissioning. When the level in tank 2503 reached a point on the tank nozzle of 3 ft. Product began to run out through a 1" open threaded weld-o-let located on the 18"x16" tank nozzle. Contractor personnel on site notified local operations and product movement into the tank was shut down. A one inch valve and plug were installed on the weld-o-let after the release was identified. The weld-o-let was plugged during the successful hydro-testing of the tank. During the p&id and pre-startup safety review walk through, a valve was identified as being in place in the weld-o-let. However, at some subsequent point the valve was removed by persons unknown and the weld-o-let left open during the filling of the tank with product. A visual inspection was done prior to receiving product into tankage but the missing valve was not detected at that time. Most of the released product collected on visqueen spread around the perimeter of the tank and was recovered by a vacuum truck. The product that impacted the soil was excavated and put into a roll-off container. Approximately 5 yards of soil was remediated. |