HL incident on 2016-06-02 — TX

Operator
Exxonmobil Pipeline Co
Cause
Corrosion Failure
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2016-06-02 16:00
Report number
Location
TX
Narrative
The failure location appears to be under, or very close to a centerpoint transmission tower. Due to safety concerns empco will not excavate close enough to the tower to expose the leak site. Empco is currently deciding next steps. The pipeline segment is currently isolated and filled with nitrogen. Part c question 3 pipe body is assumed. August 2018 update - empco was unable to excavate the failure point due to the proximity of a power line tower. A tethered ili was used to inspect the segment. Data from the tool suggests disbonding of x-tru coating on the effected joint. The line segment was left in place and grout filled. New fbe-coated pipe was installed and recommissioned on 8/7/2017. January 21, 2019 update - at PHMSA's request changed part a, 14b from a date of 8/7/18 to 8/7/17, and changed part c, 3a from 6.625 to 6.0. Changed preparers information. Report is final.
Detailed record list
Report Received Date
2016-07-01 00:00:00
Iyear
2016
Report Number
20160210
Supplemental Number
31524
Report Type
Supplemental Final
Operator Id
Name
Exxonmobil Pipeline Co
Operator Street Address
22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name
Spring
Operator State Abbreviation
TX
Operator Postal Code
77389
Local Datetime
2016-06-02 16:00:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Dilute Propylene
Unintentional Release Bbls
1.97
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Release Is Located At A Shelll Refinery, Shell Employee Notified Empco
Incident Identified Datetime
2016-06-02 16:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-06-02 21:00:00
Restart Datetime
2017-08-07 14:00:00
On Site Datetime
2016-06-02 17:00:00
Nrc Rpt Datetime
2016-06-09 15:26:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Tx-206
Segment Name
Tx-206
Onshore State Abbreviation
Tx
Onshore Postal Code
77015
Onshore City Name
Pasadena
Onshore County Name
Harris
Designated Location
Milepost/valve Station
Designated Name
Shell Plant
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
60
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6
Pipe Wall Thickness
0.188
Pipe Smys
42000
Pipe Specification
X-42
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Us Steel
Pipe Coating Type
Extruded Polyehylene
Installation Year
1969
Manufactured Year
1969
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
50
Est Cost Prop Damage
0
Est Cost Emergency
150000
Est Cost Environmental
5000
Est Cost Other
0
Prpty
155050
Accident Psig
500
Mop Psig
1440
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
36700
Internal Inspection Ind
No
Diameter Change Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pinhole release was not identified by the scada-based system.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Other Corrosion Ind
Yes
Corrosion Type Details
It Was Not Possible To Excavate The Affected Pipe. A Tethered Inline Inspection Tool Identified The Anomaly As External Metal Loss.
Other Basis Ind
Yes
Corrosion Basis Details
It Was Not Possible To Excavate The Affected Pipe. A Tethered Inline Inspection Tool Identified The Anomaly As External Metal Loss.
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1969
Shielding Evident
Yes
Cathodic Survey Type
No
Prior Damage
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2017
Geometry Recent Year
2017
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
J** M*********
Preparer Title
Pipeline Safety Advisor
Preparer Email
J*****************@e*********.com
Preparer Telephone
8326246121
Prepared Date
2019-01-21 00:00:00
Authorizer Name
C******* H********
Authorizer Telephone
8326247920
Authorizer Title
Sshe Department Manager
Authorizer Email
C*******************@e*********.com
Narrative
The failure location appears to be under, or very close to a centerpoint transmission tower. Due to safety concerns empco will not excavate close enough to the tower to expose the leak site. Empco is currently deciding next steps. The pipeline segment is currently isolated and filled with nitrogen. Part c question 3 pipe body is assumed. August 2018 update - empco was unable to excavate the failure point due to the proximity of a power line tower. A tethered ili was used to inspect the segment. Data from the tool suggests disbonding of x-tru coating on the effected joint. The line segment was left in place and grout filled. New fbe-coated pipe was installed and recommissioned on 8/7/2017. January 21, 2019 update - at PHMSA's request changed part a, 14b from a date of 8/7/18 to 8/7/17, and changed part c, 3a from 6.625 to 6.0. Changed preparers information. Report is final.
Report Received Date 2016-07-01 00:00:00
Iyear 2016
Report Number 20160210
Supplemental Number 31524
Report Type Supplemental Final
Operator Id 4906 PHMSA Enforcement
Name Exxonmobil Pipeline Co
Operator Street Address 22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name Spring
Operator State Abbreviation TX
Operator Postal Code 77389
Local Datetime 2016-06-02 16:00:00
Location Latitude 29.72056 Google Maps OpenStreetMap
Location Longitude -95.13222 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Other Hvl
Commodity Details Dilute Propylene
Unintentional Release Bbls 1.97
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Release Is Located At A Shelll Refinery, Shell Employee Notified Empco
Incident Identified Datetime 2016-06-02 16:00:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2016-06-02 21:00:00
Restart Datetime 2017-08-07 14:00:00
On Site Datetime 2016-06-02 17:00:00
Nrc Rpt Datetime 2016-06-09 15:26:00
Nrc Rpt Num 1150155 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Tx-206
Segment Name Tx-206
Onshore State Abbreviation Tx
Onshore Postal Code 77015
Onshore City Name Pasadena
Onshore County Name Harris
Designated Location Milepost/valve Station
Designated Name Shell Plant
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 60
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6
Pipe Wall Thickness 0.188
Pipe Smys 42000
Pipe Specification X-42
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Us Steel
Pipe Coating Type Extruded Polyehylene
Installation Year 1969
Manufactured Year 1969
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 50
Est Cost Prop Damage 0
Est Cost Emergency 150000
Est Cost Environmental 5000
Est Cost Other 0
Prpty 155050
Accident Psig 500
Mop Psig 1440
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 36700
Internal Inspection Ind No
Diameter Change Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Pinhole release was not identified by the scada-based system.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results Localized Pitting
Other Corrosion Ind Yes
Corrosion Type Details It Was Not Possible To Excavate The Affected Pipe. A Tethered Inline Inspection Tool Identified The Anomaly As External Metal Loss.
Other Basis Ind Yes
Corrosion Basis Details It Was Not Possible To Excavate The Affected Pipe. A Tethered Inline Inspection Tool Identified The Anomaly As External Metal Loss.
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 1969
Shielding Evident Yes
Cathodic Survey Type No
Prior Damage Yes
Collected Data Ind Yes
Axial Magnetic Flx Lkg Ind Yes
Axial Recent Year 2017
Geometry Recent Year 2017
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name J** M*********
Preparer Title Pipeline Safety Advisor
Preparer Email J*****************@e*********.com
Preparer Telephone 8326246121
Prepared Date 2019-01-21 00:00:00
Authorizer Name C******* H********
Authorizer Telephone 8326247920
Authorizer Title Sshe Department Manager
Authorizer Email C*******************@e*********.com
Narrative The failure location appears to be under, or very close to a centerpoint transmission tower. Due to safety concerns empco will not excavate close enough to the tower to expose the leak site. Empco is currently deciding next steps. The pipeline segment is currently isolated and filled with nitrogen. Part c question 3 pipe body is assumed. August 2018 update - empco was unable to excavate the failure point due to the proximity of a power line tower. A tethered ili was used to inspect the segment. Data from the tool suggests disbonding of x-tru coating on the effected joint. The line segment was left in place and grout filled. New fbe-coated pipe was installed and recommissioned on 8/7/2017. January 21, 2019 update - at PHMSA's request changed part a, 14b from a date of 8/7/18 to 8/7/17, and changed part c, 3a from 6.625 to 6.0. Changed preparers information. Report is final.