Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2016-05-20 — TX
Operator
Shell Pipeline Co., L.p.
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,330,000
Incident datetime
2016-05-20 00:35
Report number
Location
TX
Narrative
5/20/16 00:35hrs pt the 24" pipe segment from tracy to windmill farms ruptured. The pipeline houston control center scada detected an increase in flow rate and drop in discharge pressure. The pump station immediately shutdown on low suction. The controller took action to shutdown the entire pipeline system and isolate the pipeline. Notifications were made to the field supervisor, the control center supervisor. Personnel were sent to the area of the pump station to locate the exact location of the release. Following the replacement of the failed pipe joint the csfm gave permission to displace the heavy crude oil from the pipeline with light crude oil before an agreed plan of action on the vintage pipe which failed. Inspections and repairs were initiated, along with hydro-static pressure testing of affected segments. The pipeline was re-started with the approval of the csfm on july 19, 2016. The failed pipe was examined at a metallurgical laboratory. Splc's subject matter expert (sme) reviewed the analysis.
Detailed record list
Report Received Date
2016-06-15 00:00:00
Iyear
2016
Report Number
20160184
Supplemental Number
21575
Report Type
Supplemental Final
Operator Id
31174
Name
Shell Pipeline Co., L.p.
Operator Street Address
150 North Dairy Ashford Road Wck Bldg. A
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2016-05-20 00:35:00
Location Latitude
37.72926
Location Longitude
-121.55971
Commodity Released Type
Crude Oil
Unintentional Release Bbls
500
Recovered Bbls
400
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2016-05-20 00:35:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2016-05-20 00:37:00
Restart Datetime
2016-05-23 13:00:00
On Site Datetime
2016-05-20 02:17:00
Nrc Rpt Datetime
2016-05-20 02:44:00
Nrc Rpt Num
1148267
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
North 20
Segment Name
Tracy To Windmill Farms 24"
Onshore State Abbreviation
Ca
Onshore Postal Code
95304
Onshore City Name
Tracy
Onshore County Name
Alameda
Designated Location
Milepost/valve Station
Designated Name
137.3
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
84
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
24
Pipe Wall Thickness
0.26
Pipe Smys
60000
Pipe Specification
5lx
Pipe Seam Type
Dsaw
Pipe Manufacturer
Armco
Pipe Coating Type
Polyolefin
Installation Year
1989
Manufactured Year
1982
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
4.5
Rupture Length
45.2
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
25000
Est Cost Gas Released
0
Est Cost Prop Damage
1330000
Est Cost Emergency
1585000
Est Cost Environmental
1600000
Est Cost Other
0
Prpty
4540000
Accident Psig
694
Mop Psig
936
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
16125
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind
Yes
Invest No Schedule Ind Details
The Controllers Response Was Compliant And Effective. The Size And Consequence Of The Release Was Minimized As Required By Procedure. Notification To Field Personnel Was Compliant To Notification To The Console Supervisor. There Were No Issues To Note In Regards To Control Center Response. There Were No Fatigue Related Issues. No Drug Testing Was Required.
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Fatigue Vibr Related
Yes
Failure Subtype
Mechanically-Induced Fatigue Prior To Installation (Such As During Transport Of Pipe)
Additional Crack Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Cir Trn Wave Mgn Flx Lkg Ind
Yes
Ultrasonic Ind
Yes
Geometry Deformation Ind
Yes
Emat Ind
Yes
Axial Recent Year
2015
Circ Wave Recent Year
2015
Ultrasonic Recent Year
2015
Geometry Recent Year
2013
Emat Recent Year
2015
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1989
Hydrtst Most Rcnt Pressure
1190
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
R****** K*****
Preparer Title
Regulatory Specialist
Preparer Email
R*************@s****.com
Preparer Telephone
713 241 1064
Preparer Fax
713 241 8994
Prepared Date
2016-08-05 00:00:00
Authorizer Name
D****** P****
Authorizer Telephone
713 241 2035
Authorizer Title
Pipeline Ops Regulatory Manager
Authorizer Email
D************@s****.com
Narrative
5/20/16 00:35hrs pt the 24" pipe segment from tracy to windmill farms ruptured. The pipeline houston control center scada detected an increase in flow rate and drop in discharge pressure. The pump station immediately shutdown on low suction. The controller took action to shutdown the entire pipeline system and isolate the pipeline. Notifications were made to the field supervisor, the control center supervisor. Personnel were sent to the area of the pump station to locate the exact location of the release. Following the replacement of the failed pipe joint the csfm gave permission to displace the heavy crude oil from the pipeline with light crude oil before an agreed plan of action on the vintage pipe which failed. Inspections and repairs were initiated, along with hydro-static pressure testing of affected segments. The pipeline was re-started with the approval of the csfm on july 19, 2016. The failed pipe was examined at a metallurgical laboratory. Splc's subject matter expert (sme) reviewed the analysis.
| Report Received Date | 2016-06-15 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160184 |
| Supplemental Number | 21575 |
| Report Type | Supplemental Final |
| Operator Id | 31174 PHMSA Enforcement |
| Name | Shell Pipeline Co., L.p. |
| Operator Street Address | 150 North Dairy Ashford Road Wck Bldg. A |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2016-05-20 00:35:00 |
| Location Latitude | 37.72926 Google Maps OpenStreetMap |
| Location Longitude | -121.55971 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 500 |
| Recovered Bbls | 400 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2016-05-20 00:35:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2016-05-20 00:37:00 |
| Restart Datetime | 2016-05-23 13:00:00 |
| On Site Datetime | 2016-05-20 02:17:00 |
| Nrc Rpt Datetime | 2016-05-20 02:44:00 |
| Nrc Rpt Num | 1148267 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | North 20 |
| Segment Name | Tracy To Windmill Farms 24" |
| Onshore State Abbreviation | Ca |
| Onshore Postal Code | 95304 |
| Onshore City Name | Tracy |
| Onshore County Name | Alameda |
| Designated Location | Milepost/valve Station |
| Designated Name | 137.3 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 84 |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 24 |
| Pipe Wall Thickness | 0.26 |
| Pipe Smys | 60000 |
| Pipe Specification | 5lx |
| Pipe Seam Type | Dsaw |
| Pipe Manufacturer | Armco |
| Pipe Coating Type | Polyolefin |
| Installation Year | 1989 |
| Manufactured Year | 1982 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Width | 4.5 |
| Rupture Length | 45.2 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 25000 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 1330000 |
| Est Cost Emergency | 1585000 |
| Est Cost Environmental | 1600000 |
| Est Cost Other | 0 |
| Prpty | 4540000 |
| Accident Psig | 694 |
| Mop Psig | 936 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 16125 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Schedule Ind | Yes |
| Invest No Schedule Ind Details | The Controllers Response Was Compliant And Effective. The Size And Consequence Of The Release Was Minimized As Required By Procedure. Notification To Field Personnel Was Compliant To Notification To The Console Supervisor. There Were No Issues To Note In Regards To Control Center Response. There Were No Fatigue Related Issues. No Drug Testing Was Required. |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Metallurgical Ind | Yes |
| Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Fatigue Vibr Related | Yes |
| Failure Subtype | Mechanically-Induced Fatigue Prior To Installation (Such As During Transport Of Pipe) |
| Additional Crack Ind | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Cir Trn Wave Mgn Flx Lkg Ind | Yes |
| Ultrasonic Ind | Yes |
| Geometry Deformation Ind | Yes |
| Emat Ind | Yes |
| Axial Recent Year | 2015 |
| Circ Wave Recent Year | 2015 |
| Ultrasonic Recent Year | 2015 |
| Geometry Recent Year | 2013 |
| Emat Recent Year | 2015 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 1989 |
| Hydrtst Most Rcnt Pressure | 1190 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | R****** K***** |
| Preparer Title | Regulatory Specialist |
| Preparer Email | R*************@s****.com |
| Preparer Telephone | 713 241 1064 |
| Preparer Fax | 713 241 8994 |
| Prepared Date | 2016-08-05 00:00:00 |
| Authorizer Name | D****** P**** |
| Authorizer Telephone | 713 241 2035 |
| Authorizer Title | Pipeline Ops Regulatory Manager |
| Authorizer Email | D************@s****.com |
| Narrative | 5/20/16 00:35hrs pt the 24" pipe segment from tracy to windmill farms ruptured. The pipeline houston control center scada detected an increase in flow rate and drop in discharge pressure. The pump station immediately shutdown on low suction. The controller took action to shutdown the entire pipeline system and isolate the pipeline. Notifications were made to the field supervisor, the control center supervisor. Personnel were sent to the area of the pump station to locate the exact location of the release. Following the replacement of the failed pipe joint the csfm gave permission to displace the heavy crude oil from the pipeline with light crude oil before an agreed plan of action on the vintage pipe which failed. Inspections and repairs were initiated, along with hydro-static pressure testing of affected segments. The pipeline was re-started with the approval of the csfm on july 19, 2016. The failed pipe was examined at a metallurgical laboratory. Splc's subject matter expert (sme) reviewed the analysis. |