HL incident on 2016-05-15 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$25,000
Incident datetime
2016-05-15 15:00
Report number
Location
OK
Narrative
Personnel of the marathon galveston bay refinery discovered a pinhole on the 10" above grade relief line and informed magellan representatives. The line was isolated and the leak was repaired by magellan's contractor. The section of pipe where the release occurred was removed. The cutout and the remainder of the line were inspected for additional internal corrosion features with none found. A new piece of pipe was installed where the cutout was made and the line was returned to service. Impacted soil was remediated. The crude product in the piping system is treated with corrosion inhibitor and monitored with internal corrosion coupons. However, the low/intermittent flow in the facility relief piping and inability to flush the line due to the type of relief valve installed likely allowed bs&w in the crude to settle out resulting in internal corrosion. A project has been executed to replace the relief valve and remaining pipe on the relief line which will allow the line to be flushed during relief valve inspections. Note: the national response center was notified when it became apparent that total costs attributed to the detection, emergency response, repair and clean-up of the release would meet or exceed the $50,000 reporting threshold in 49 cfr part 195.52(a)(3), and for no other reason. Supplemental update: part h narrative
Detailed record list
Report Received Date
2016-06-13 00:00:00
Iyear
2016
Report Number
20160179
Supplemental Number
22419
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2016-05-15 15:00:00
Location Latitude
29.36557
Location Longitude
-94.93976
Commodity Released Type
Crude Oil
Unintentional Release Bbls
10
Recovered Bbls
10
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Notification By Refinery Personnel
Incident Identified Datetime
2016-05-15 15:00:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Line Was Shut Down (Idle) When Marathon Personnel Noted The Issue
On Site Datetime
2016-05-15 15:20:00
Nrc Rpt Datetime
2016-05-16 11:44:00
Nrc Rpt Num
1147882
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cms3-Station At Texas City Marathon Refinery
Segment Name
Station No. 825
Onshore State Abbreviation
Tx
Onshore Postal Code
77590
Onshore City Name
Texas City
Onshore County Name
Galveston
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10
Pipe Wall Thickness
0.5
Pipe Smys
42000
Pipe Specification
Api5l X-42
Pipe Seam Type
Seamless
Pipe Manufacturer
V&m Star
Pipe Coating Type
Paint
Installation Year
Unknown
Manufactured Year
Unknown
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
500
Est Cost Prop Damage
25000
Est Cost Emergency
80000
Est Cost Environmental
80000
Est Cost Other
0
Prpty
185500
Accident Psig
2
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No official incident investigation was performed, as operations control supervisor determined that controller followed proper procedure for the operation, and in addition release volume was significantly below system thresholds.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Corrosive Commodity Ind
Yes
Int Water Acid Ind
Yes
Int Other Basis Ind
Yes
Int Corrosion Basis Details
Visual Observation
Int Elbow Loc Ind
Yes
Int Other Loc Ind
Yes
Corrosion Location Details
6:00 O'clock Position On Pipe
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2008
Hydrtst Most Rcnt Pressure
390
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S****** L******
Preparer Title
Ai Analyst
Preparer Email
S**************@m*********.com
Preparer Telephone
918-574-7327
Preparer Fax
918-574-7376
Prepared Date
2017-06-16 00:00:00
Authorizer Name
S****** L******
Authorizer Telephone
918-574-7327
Authorizer Title
Ai Analyst
Authorizer Email
S**************@m*********.com
Narrative
Personnel of the marathon galveston bay refinery discovered a pinhole on the 10" above grade relief line and informed magellan representatives. The line was isolated and the leak was repaired by magellan's contractor. The section of pipe where the release occurred was removed. The cutout and the remainder of the line were inspected for additional internal corrosion features with none found. A new piece of pipe was installed where the cutout was made and the line was returned to service. Impacted soil was remediated. The crude product in the piping system is treated with corrosion inhibitor and monitored with internal corrosion coupons. However, the low/intermittent flow in the facility relief piping and inability to flush the line due to the type of relief valve installed likely allowed bs&w in the crude to settle out resulting in internal corrosion. A project has been executed to replace the relief valve and remaining pipe on the relief line which will allow the line to be flushed during relief valve inspections. Note: the national response center was notified when it became apparent that total costs attributed to the detection, emergency response, repair and clean-up of the release would meet or exceed the $50,000 reporting threshold in 49 cfr part 195.52(a)(3), and for no other reason. Supplemental update: part h narrative
| Report Received Date | 2016-06-13 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160179 |
| Supplemental Number | 22419 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2016-05-15 15:00:00 |
| Location Latitude | 29.36557 Google Maps OpenStreetMap |
| Location Longitude | -94.93976 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 10 |
| Recovered Bbls | 10 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Other |
| Accident Details | Notification By Refinery Personnel |
| Incident Identified Datetime | 2016-05-15 15:00:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | The Line Was Shut Down (Idle) When Marathon Personnel Noted The Issue |
| On Site Datetime | 2016-05-15 15:20:00 |
| Nrc Rpt Datetime | 2016-05-16 11:44:00 |
| Nrc Rpt Num | 1147882 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Cms3-Station At Texas City Marathon Refinery |
| Segment Name | Station No. 825 |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 77590 |
| Onshore City Name | Texas City |
| Onshore County Name | Galveston |
| Designated Location | Milepost/valve Station |
| Designated Name | 0 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 10 |
| Pipe Wall Thickness | 0.5 |
| Pipe Smys | 42000 |
| Pipe Specification | Api5l X-42 |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | V&m Star |
| Pipe Coating Type | Paint |
| Installation Year | Unknown |
| Manufactured Year | Unknown |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 500 |
| Est Cost Prop Damage | 25000 |
| Est Cost Emergency | 80000 |
| Est Cost Environmental | 80000 |
| Est Cost Other | 0 |
| Prpty | 185500 |
| Accident Psig | 2 |
| Mop Psig | 275 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No official incident investigation was performed, as operations control supervisor determined that controller followed proper procedure for the operation, and in addition release volume was significantly below system thresholds. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Corrosive Commodity Ind | Yes |
| Int Water Acid Ind | Yes |
| Int Other Basis Ind | Yes |
| Int Corrosion Basis Details | Visual Observation |
| Int Elbow Loc Ind | Yes |
| Int Other Loc Ind | Yes |
| Corrosion Location Details | 6:00 O'clock Position On Pipe |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Yes |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2008 |
| Hydrtst Most Rcnt Pressure | 390 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S****** L****** |
| Preparer Title | Ai Analyst |
| Preparer Email | S**************@m*********.com |
| Preparer Telephone | 918-574-7327 |
| Preparer Fax | 918-574-7376 |
| Prepared Date | 2017-06-16 00:00:00 |
| Authorizer Name | S****** L****** |
| Authorizer Telephone | 918-574-7327 |
| Authorizer Title | Ai Analyst |
| Authorizer Email | S**************@m*********.com |
| Narrative | Personnel of the marathon galveston bay refinery discovered a pinhole on the 10" above grade relief line and informed magellan representatives. The line was isolated and the leak was repaired by magellan's contractor. The section of pipe where the release occurred was removed. The cutout and the remainder of the line were inspected for additional internal corrosion features with none found. A new piece of pipe was installed where the cutout was made and the line was returned to service. Impacted soil was remediated. The crude product in the piping system is treated with corrosion inhibitor and monitored with internal corrosion coupons. However, the low/intermittent flow in the facility relief piping and inability to flush the line due to the type of relief valve installed likely allowed bs&w in the crude to settle out resulting in internal corrosion. A project has been executed to replace the relief valve and remaining pipe on the relief line which will allow the line to be flushed during relief valve inspections. Note: the national response center was notified when it became apparent that total costs attributed to the detection, emergency response, repair and clean-up of the release would meet or exceed the $50,000 reporting threshold in 49 cfr part 195.52(a)(3), and for no other reason. Supplemental update: part h narrative |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA