HL incident on 2016-05-12 — TX
Operator
Kinder Morgan Co2 Co. Lp
Cause
Incorrect Operation
Commodity
Co2 (Carbon Dioxide)
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2016-05-12 06:51
Report number
Location
TX
Narrative
Prior to the incident, the poquita station pig receiver was blown down and isolated. The 1" blow down valve on the receiver was left open. On 5/12/16, a contract inspector working for kinder morgan notified the local field operations supervisor of a leak on the poquita station pig receiver. The blow down valve was then closed and the leak isolated.
Detailed record list
Report Received Date
2016-06-08 00:00:00
Iyear
2016
Report Number
20160177
Supplemental Number
21584
Report Type
Supplemental Final
Operator Id
31555
Name
Kinder Morgan Co2 Co. Lp
Operator Street Address
1001 Louisiana St, Suite 1000
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2016-05-12 06:51:00
Location Latitude
33.96455
Location Longitude
-104.58069
Commodity Released Type
Co2 (Carbon Dioxide)
Unintentional Release Bbls
70
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2016-05-12 06:51:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
The Blow Down Valve On The Receiver Was Closed.
On Site Datetime
2016-05-12 06:51:00
Nrc Rpt Num
Nrc Notification Not Required
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Poquita Station
Segment Name
Vaughn To Poquita
Onshore State Abbreviation
Nm
Onshore Postal Code
88201
Onshore City Name
Roswell
Onshore County Name
Chaves
Designated Location
Milepost/valve Station
Designated Name
Mp 378
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
2016
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
170
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
0
Prpty
170
Accident Psig
520
Mop Psig
2140
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
26
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Operation Type
Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure
Related Failure Follow Ind
Yes
Category Type
Normal Operating Conditions
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
A**** Z*****
Preparer Title
Manager-Regulatory Compliance
Preparer Email
A***********@k***********.com
Preparer Telephone
713-369-9512
Preparer Fax
303-984-3417
Prepared Date
2016-08-09 00:00:00
Authorizer Name
S**** M*****
Authorizer Telephone
713-369-8065
Authorizer Title
Director-Operations And Engineering
Authorizer Email
S***********@k***********.com
Narrative
Prior to the incident, the poquita station pig receiver was blown down and isolated. The 1" blow down valve on the receiver was left open. On 5/12/16, a contract inspector working for kinder morgan notified the local field operations supervisor of a leak on the poquita station pig receiver. The blow down valve was then closed and the leak isolated.
| Report Received Date | 2016-06-08 00:00:00 |
|---|---|
| Iyear | 2016 |
| Report Number | 20160177 |
| Supplemental Number | 21584 |
| Report Type | Supplemental Final |
| Operator Id | 31555 PHMSA Enforcement |
| Name | Kinder Morgan Co2 Co. Lp |
| Operator Street Address | 1001 Louisiana St, Suite 1000 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2016-05-12 06:51:00 |
| Location Latitude | 33.96455 Google Maps OpenStreetMap |
| Location Longitude | -104.58069 Google Maps OpenStreetMap |
| Commodity Released Type | Co2 (Carbon Dioxide) |
| Unintentional Release Bbls | 70 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2016-05-12 06:51:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | The Blow Down Valve On The Receiver Was Closed. |
| On Site Datetime | 2016-05-12 06:51:00 |
| Nrc Rpt Num | Nrc Notification Not Required NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Poquita Station |
| Segment Name | Vaughn To Poquita |
| Onshore State Abbreviation | Nm |
| Onshore Postal Code | 88201 |
| Onshore City Name | Roswell |
| Onshore County Name | Chaves |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 378 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Installation Year | 2016 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 170 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 170 |
| Accident Psig | 520 |
| Mop Psig | 2140 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 26 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Incorrect Operation |
| Cause Details | Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure |
| Operation Type | Valve Left Or Placed In Wrong Position, But Not Resulting In A Tank, Vessel, Or Sump/separator Overflow Or Facility Overpressure |
| Related Failure Follow Ind | Yes |
| Category Type | Normal Operating Conditions |
| Operator Qualification Ind | Yes |
| Qualified Individuals | Yes, They Were Qualified For The Task(S) |
| Preparer Name | A**** Z***** |
| Preparer Title | Manager-Regulatory Compliance |
| Preparer Email | A***********@k***********.com |
| Preparer Telephone | 713-369-9512 |
| Preparer Fax | 303-984-3417 |
| Prepared Date | 2016-08-09 00:00:00 |
| Authorizer Name | S**** M***** |
| Authorizer Telephone | 713-369-8065 |
| Authorizer Title | Director-Operations And Engineering |
| Authorizer Email | S***********@k***********.com |
| Narrative | Prior to the incident, the poquita station pig receiver was blown down and isolated. The 1" blow down valve on the receiver was left open. On 5/12/16, a contract inspector working for kinder morgan notified the local field operations supervisor of a leak on the poquita station pig receiver. The blow down valve was then closed and the leak isolated. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA